O'"'U n UNIT ED ST ATES

[ ,

1 NUCLEAR REGULATORY COMMISSlon 5 -

.: atmon iv

",, C114 y AN PL AZA DRIVE SUll E 400

! ,/ A P Li'vG TON T E x AS 76011 8064 MAY - 5 E Garry L. Randolph, Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, Missouri 65251

SUBJECT:

SEMlANNUAL PLANT PERFORMANCE REVIEW - CALLAWAY PLANT

Dear Mr. Randolph:

On March 26,1997, the NRC staff completed the Semiannual Plant Performance Review (SPPR) of Callaway Plant. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The SPPR for Callaway Plant involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through March 1997. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Callaway Plant SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conf!icts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please contact W. D Johnson at (817) 860-8148.

Sincerely,

)

kW

" homas P. Gwynn, ,irec or

/

Division of Reactor ro cts I f Docket Nos.: 50-483 Lice.nse Nos. NPF-30

Enclosure:

Inspection Plan 9705070271 970505 l ll ll ll ll PDR ADOCK 05000483 G PDR

4 ,

4 l

Union Electric Company -2 cc w/ enclosure:

Professional Nuclear Consulting, Inc. -

19041 Raines Drive .

Derwood, Maryland 20855 l Gerald Charnoff, Esq.

Thomas A. Baxter, Esq.

Shaw, Pittman, Potts & Trowbridge '

2300 N. Street, N.W. '

Washington, D.C. 20037 H. D. Bono, Supervising Engineer Site Licensing Union Electric Company l P.O. Box 620 1 Fulton, Missouri 65251  !

l Manager - Eiectric Department .

Missouri Public Service Commission 301 W. High P.O. Box 360 Jefferson City, Missouri 65102 Ronald A. Kucera, Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, Missouri 65102 Otto L. Maynard, President and Chief Executive Officer '

Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington,' Kansas 66839 Dan 1. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, Missouri 63130 Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, Missouri 65151 L

- . - - -. _ _ _ _ -=

Union Electric Company 4 Alan C. Passwater, Manager i Licensing and Fuels Union Electric Company P.O. Box 66149 St. Louis, Missouri 63166-6149

J V. Laux, Manager Quality Assurance Union Electric Company P.O. Box 620 Fulton, Missouri 65251 1

l C

a k . _ _ . .

4 e

?-

Union Electric Company MAY - 51997 i bec to DCD (IE01)  ;

i bec distrib. by RIV:  !

Regional Administrator Resident inspector  !

DRP Director DRS-PSB Branch Chief (DRP/B) MIS System ,

Project Engineer (DRP/B) RIV File

. Branch Chief (DRP/TSS) -

l l

1

, To receive copy of document, Indicate in t@"c" = Copy without enclosures "E" = Copy with enclosures "W" = No copy RIV:PE:DRP/B C:DRP/B (g D:DRV D:DRP A), i DNGraves;dfh) WDJohnsph AT$ ell - TP,G,wynn ([ f 4/ li /97 4/ l\/97 y1 /97 3/f/97 OFFIClAL RECORD col 3Y  !

g ..

_ _ _ _ - . . _ _ _ _ _ . _ _ . . . . ~ _ _ .

Union Electric Company _

i bec to DCD (IE01)

[ bec distrib. by RIV: l

Regional Administrator Resident inspector

, DRP Director DRS-PSB j Branch Chief (DRP/B) MIS System Project Engineer (DRP/B) RIV File j Branch Chief (DRP/TSS) i

\

4 l

.1 l'

i i

i l

i l

i To receive copy of document, indicate in t@"C" = Copy weout enclosures "E" = Copy we enclosures "N" = No copy RIV:PE:DRP/B C:DRP/B (g D:DRV D:DRP A),

DNGraves;dtb WDJohnsph AT$ ell TPGyvynn (j'[

4/ p /97 4/ 11/9 7 4j } /97 3/[ /97 OFFIClAL RECORD COPY L-

ENCLOSURE CALLAWAY PLANT INSPECTION PLAN IP - Inspection Procedure Tl - Temporary instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants) =-

INSPECTION TITLE / NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS m mm - --

Tl 2515-132 Malevolent Use of V-hicles at 2 04/21-25/97 Temporary instruction Nuclear Power Plari.s IP 71001 Licensed Operator 3 05/19-23/97 Core inspection Requalification Program Evaluation IP 62706 Maintenance Rule Baseline 7 06/02-06/97 Regional Team (required by NRR Program Office)

IP 82301 Emergency Preparedness 5 08/11-15/97 Core inspection Exercise OSRE Operational Safeguards 5 08/18-22/97 Required by NRR Program Office Response Evaluation IP 83750 Occupational Radiation 1 09/15-19/97 Core inspection Exposure

-. _ - _ _ - . _ - _ _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ . - _ - - - _ --___ - ----