ML20138H744

From kanterella
Jump to navigation Jump to search
Constitutes Initial Response within 30 Days Required by GL 97-01, Degradation of CR Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Util Plans to Submit Info Requested by GL 97-01,within 120 Days of GL Issuance
ML20138H744
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/30/1997
From: Gambhir S
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-01, GL-97-1, LIC-97-065, LIC-97-65, NUDOCS 9705070262
Download: ML20138H744 (3)


Text

6

% 998 Omaha PublicPowerDistrict 444 South 16th StreetMall Omaha NE68102-2247 April 30,1997 LIC-97-065 4

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Statior. P1-137 Washington, D.C.

20555-0001

References:

1.

Docket No. 50-285 2.

NRC Generic 1.etter 97-01, "Cegradation of Control Rod Drive Mechanism Nozzle and Other Vessel Closure Head Penetrations." dated i

April 1.1997

SUBJECT:

Initial Response to NRC Generic Letter 97 01 Generic Letter (GL) 97-01 requested addressees to (1) describe their past and planned programs for inspection of PWR control rod drive mechanism (CRDM) and other vessel closure head penetrations, and (2) provide a history of abnormal plant primary system chemistry information, incluaing a description of actual or indicated resin bead intrusions which have exceeded chemistry guidelines.

This letter constitutes the initial response within 30 days required by GL 97-01. Omaha Public Power District (OPPD) is participating with industry groups in addressing the requests in GL 97-01. OPPD currently plans to submit the information requested by GL 97-01 within 120 days of the GL issuance. If any circumstances require deviation from these plans OPPD will provide appropriate notification and justification to the NRC.

This response is provided under oath as required by GL 97-01. Please contact me if you have any questions.

Sincerely, n

,.(

,_, i

[W7D Q

1 S. K. Gambhir r

Division Manager Engineering & Operations Support I

'l.l 1.1 I.lli ll Ill i,Ill 9705070262 970430

, c PDR ADOCK 05000205 P

PDR 45.5124 Employment wHh Equal Opportunay

i e

e

-). S. Nuclear Regulatory Commission i

LIC-97-065 Page 2

?

Attachment i

c:

Winston & Strawn E. W. Merschoff. NRC Regional Administrator Region IV 4

L R. Wharton, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector 1

l l

1

?

J 4

4 i

I i

l l

l i

.. -. - l l

i a

j LIC-97-065 l

Attachment UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Omaha Public Power District

)

Docket No. 50-285 (Fort Calhoun Station

)

Unit No. 1)

)

AEEIDAVII S. K. Gambhir. being duly sworn, hereby deposes and says that he is the Division Manager

- Engineering & Operations Support of the Omaha Public Power District; that as such he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached information concerning response to the requirements of NRC Generic Letter 97-01: that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

i S. K. Gambhir Division Manager Engineering & Operations Support i

STATE OF NEBRASKA)

) ss

. COUNTY OF DOUGLAS)

Subscribed and sworn to before me, a Notary Public in and for the State of Nebraska on this _30__ day of April,1997.

1

_h Notar Ptblic GENEAAL160 FART.$ late sille6rada WILLIAM J.PONEC d

Isy Comm. Esp. Apri4.2000