Text
1 pnunq p*
t UNITED STATES I
g g
NUCLEAR REGULATORY COMMISSION o
R WASHINGTON, D.C. 20566 4001 i
kQ January 3, 1997 MEMORANDUM T0:
James T. Wiggins. Director Division of Reactor Safety. Region I Johns P. Joudan. Director Division of Reactor Safety. Region II Geoffrey E. Grant. Director Division of Reactor Safety. Region III James E. Oyer. Director Division of Reactor Safety. Region IV FROM:
Charles E. Rossi. Director h
Safety Programs Division Office for Analysis and Ev uation of Operational Data
SUBJECT:
REQUEST FOR REVIEW AND. COMMENTS - PRELIMINARY CASE STUDY "NON-POWER REACTOR SURVEY" A preliminary AEOD Case Study "Non-Power Reactor Survey." is attac"ed for your review and comment.
The study was initiated by AE0D because of occurrences in 1993 involving loss of multiple scram functions and reactivity control problems at non-power reactor facilities.
The survey conducted dealt mainly with higher powered MTR-fueled and TRIGA-fueled non-power reactors, and
)
included visits to several representative facilities, reviews of operating experience, and reviews of selected facility safety analyses. The study j
ioentified some important lessons learned on non-power reactor safety which need to be included in the licensing and regulatory process.
Even though this class of reactors is significantly more safe than the power reactor community t
class, there may not be sufficient oversight on event management (including t
startup checks for operability). reporting, and followup, either by the licensee management or by the NRC.
In accordance with our peer review process, prior to the finalization and i
distribution of this case study. we are providing you a copy of the preliminary report for review and comment. By separate correspondence we have l
also requested review by the Test Research, and Training Reactors (TRTR) community as well as NRR. We request that you focus your review primarily on the accuracy and completeness of the technical details and the resulting findings and conclusions.
Changes to the findings and conclusions will be considered if there are errors in fact or supporting data. We will not recommend any regulatory actions until we have reconciled comments and issued s
the final report.
g,C 0G0051 9 03 Po218Rs8 flis om-1 AE00 PDR X R b. t f y e. Q h tte3
James T. Wiggins, et al '
Since we wish to finalize and issue the report shortly, we ask that you submit your comments within 30 days of the receipt of this letter.
We ask that your comments be submitted by memorandum.
If you or your staff have any questions regarding this study, please feel free to contact me at (301) 415-7473.
Attachment:
As stated Distribution:
EJordan Public/ File Center Dross RAB R/F RSpence SPD R/F JMurphy AEOD R/F KBrockman TMartin. NRR AMohseni SWeiss. NRR j
DOCUMENT NAME:A:DRS_ Memo.JER w)a E a N N n 1 @ N M f " " d h "
C:RABf d h[SPDb h OFFICE NAME JRosenthal/sr CRossi DATE
/t/3//96
/t/S//96 0FFICIAL RECOR) COPY
~