Advises of Planned Insp Effort Resulting from Plant Semiannual PPR Completed on 970326.Details of Insp Plan for Next Eight Months Encl
ML20138H678
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
NUDOCS 9705070248
Download: ML20138H678 (5)


Text

_ _ _ _ __ __ - . _ _ . -_ _ __. . _ _ _ _ . - - . _

, f "% uNMtD 5T ATES l f., .A NUCLEAR REGULATORY COMMISSION REGION LV j

, A -f Gil RV AN FL AZA DHIVf. Sulf E 400

.8, A A LINGTON, T E x AS 76011 8064 b)

HAY - 5 a \

l C. Randy Hutchinson, Vice President {

Operations - Arkansas Nuclear One J l Entergy Operations, Inc.

1448 S.R. 333 Russellville, Arkansas 72801-0967 SU8 JECT: SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR)- ARKANSAS l NUCLEAR ONE

Dear Mr. Hutchison:

On March 26,1997, the NRC staff completed the SPPR of Arkansas Nuclear One. The staff conducts these reviews for all operating nuclear power plants to develop an l integrated understanding of safety performance. The results are used by NRC i management to facilitate planning and allocation of inspection resources. The SPPR for Arkansas Nuclear One involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period October 1996 through l March 1997. SPPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee l Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the Arkansas Nuclear One SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months.

l The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not listed due to their ongoing and continuous nature.

! )

We willinform you of any changes to the inspection plan. If you have any questions, j l

please contact E. Collins of my staff at (817) 860-8291. '

Sincerely,

/

( Thomas P. Gwynn Dir cto i

Division of React r Pr ject i

Enclosure:

[

Inspection Plan l l

, i i i l

ga#

9705070248 970505 " I.l1.1.1.11'illlllllcl"l PDR l

, ADOCK 05000313 >

I G PDR  !

.i Entergy Operations, Inc. 'f l.

l Docket Nos.: 50-313 50-368 t License Nos.: DPR 51  ;

NPF-6 cc w/ enclosure:  !

Executive Vice President i

& Chief Operating Officer Entergy Operations, Inc. -

P.O. Box 31995  !

Jackson, Mississippi 39286-1995 1 Vice President i Operations Support  !

Entergy Operations, Inc.  !

l P.O. Box 31995 '

Jackson, Mississippi 39286  :

Manager, Washington Nuclear C,r,erations  ;

ABB Combustion Engineering P c kat J Power .

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 .

i I

County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W. i Washington, D.C. 20005-3502 Bernard Bevill, Acting Director ,

i Division of Radiation Control and Emergency Management Arkansas Department of Health >

4815 West Markham Street, Slot 30 Little Rock, Arkansas 72205-3867 i Manager  ;

Rockville Nuclear Licensing Framatone Technologies

1700 Rockville Pike, Suite 525 Rockville, Maryland 20852

~

l

lo-l l

L Entergy Operations, Inc. '

MAY - 51997 bec to DMB (IE01) bec distrib. by RIV:

E. W. Merschoff Resident inspector DRP Director MIS System Branch Chief (DRP/C) RIV File Project Engineer (DRP/C) DRS-PSB Branch Chief (DRP\TSS)

R. V. Azua, DRP 1

l 1

i I

i i

l I

L DOCUMENT NAME: G:\DRPDIR\SPPR\ANO.LTR To receive copy of document. Indicate in box: "C" = Copy withopt enclosures "E" = Copy wth enclosures *N" = No copy

, C:DRP/C Mp D:DRQf D:DRg4 M, EECollinsicm ATHoW((ll TPGf9 Fin QY Y '

4ANW 97 4/ /fy97 4/ /97 OFFICIAL RECORD COPY l e

>s

. t Entergy Operations, Inc.  :

MAY -5 !997 i

i bec to DMB (IE01)

I bec distrib. by RIV:

E. W. Merschoff Resident inspector DRP Director MIS System j_ Branch Chief (DRP/C) RIV File Project Engineer (DRP/C) DRS PSB Branch Chief (DRP\TSS) i R. V, Azua, DRP ,

i I

DOCUMENT NAME: G:\DRPDIR\SPPR\ANO.LTR i To receive copy of document, ind6cate in box: "C" = Copy withoyt enclosures "E" = Copy with enclosures N" = No copy l C:DRP/C Qp D:DRh / D:DRgh M, EECollinsicm ATHoW(fil TPGy9dnQYY 4AN,  % 97 4/ /D97 4/ /97 i

OFFICIAL RECORD COPY

! i

-- w

ENCLOSURE ARKANSAS NUCLEAR ONE INSPECTION PLAN IP - Inspection Procedure Ti - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE / NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS IP 73753 Inservice Inspection 1 5/12-16/97 Core Inspection IP 92902 Inservice Testing 3 5/12-16/97 Followup on Unresolved items IP 50002 Steam Generator Repair (U2) 2 5/27-31/97 Safety Initiative / Unit 2 IP 83750 Radiological Protection (U2) 2 6/2-6/97 Core inspection IP 37550 Engineering 3 6/23-27/97 Core inspection 7/7-11/97 IP 92903 MOV Hot Shorts inspection 1 6/30-7/3 Followup on Unresolved items Followup IP 81700 Physical Security Program 1 7/21-25/97 Core inspection IP 71001 Requalification inspection 3 7/28-8/1/97 Core inspection IP 84750 Radwaste Effluents 1 8/25-29/97 Core inspection IP 40500 3 9/15-19/97 Core inspection 9/29-10/3/97

_ _ _ _ _ _ _ _ _ - _ . _ _ _ _ _ _ _ . _____________________-_- -___ - _- __ _ _ __ - -