Discusses 970326 Sppr of Plant for Period from Oct 1996 Thru March 1997.Detailed Insp Plan for Next 8 Months Encl
ML20138H618
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
NUDOCS 9705070232
Download: ML20138H618 (6)


Text

..

._.._..-_,_m._

._m.

__.._.m.

"* g UNITE D ST ATES

[. -

d NUCLEAR REGULATORY COMf *lSSION h

ba '

)

REGION 1V i$ -- U!

f j # b]d{ '

5

-,f fit 1 R Y AN PL AZ A DRIVE. SUlit 200 AR LiNGTON, T E X AS 7601180 tid 9

NAY - 5 1997 Mr. C. L. Terry TU Electric Group Vice President, Nuclear l

ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, Texas 76043 l

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR)- COMANCHE PEAK STEAM ELECTRIC STATION

Dear Mr. Terry:

On March 26,1997, the NRC staff completed the SPPR of Comanche Peak Steam Electric Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC i

management to facilitate planning and allocation of inspection resources. The SPPR for Comanche Peak Steam Electric Station involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from October 1996 through March 1997. SPPRs previde NRC management with a current i

summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance and Senior Management Meeting reviews.

This letter advises you of our planned inspection effort resulting from the Comanche Peak Steam Electric Station SPPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 8 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas.

Resident inspections are not listed due to their ongoing and continuous nature.

j We willinform you of any changes to the inspection plan. If you have any questions, please contact J. I. Tapia at (817) 860-8243.

i Sincerely, y

Thomas P. Gwynn, [rectr Division of Reactor ts i

Docket Nos.: 50-146 l

50-446

)\\

t 1

License Nos.: NPF-87 l

NPF-89 9705070232 970505

^

1

,m

.._--,m

~.a

1 TU Electric

Enclosure:

Inspection Plan cc w/ enclosure:

Mr. Roger D. Walker TU Electric Regulatory Affairs Manager P.O. Box 1002 Glen Rose, Texas 76043 Juanita Ellis President - CASE 1426 South Polk Street Dallas, Texas 75224 TU Electric Bethesda Licensing 3 Metro Center, Suite 610 Bethesda, Maryland 20814 George L. Edgar, Esq.

Morgan, Lewis & Bockius 1800 M. Street, NW I

Washington, D.C. 20036 G. R. Bynog, Program Manager /

Chief inspector Texas Department of Licensing & Regulation Boiler Division P.O. Box 12157, Capitol Station Austin, Texas 78711 Honorable Dale McPherson County Judge P.O. Box 851 Glen Rose, Texas 76043 Texas Radiation Control Program Director 1100 West 49th Street Austin, Texas 78756 1

1 I

l

I f

Q TU Electric 1 l

John Howard, Director Environmental and Natural Resources ?olicy Office of the Governor P.O. Box 12428 Austin, Texas 78711 i

i

(

l f

i t

I I

I i

i

TU Electric MAY - 51997 bec to DCD (IE01) bec distrib, by RIV:

Regional Administrator Resident inspector (2)

DRP Director DRS-PSB Branch Chief (DRP/A)

MIS System Project Engineer (DRP/A)

RIV File Branch Chief (DRP/TSS) i i

DOCUMENT NAME:

To receive copy of document, indicate in box: "C" = Copy without nclosures "E" = Copy with enclosures "N" = No copy PE:DRP/A A

C:DRP/A,

D:DRS@l D:DRP p

3 RAKopriva:cm/fu JITapia W ATHowell TPfiwypn (/7 )(

j 04//5/97 04/l6 /97 )

04f { /97 03/ j /97 " V OFFICIAL RECORD COPY l

I l

e i

l' TU Electric !

MAY - 51997 i

j bec to DCD (IE01) bec distrib. by RIV-l Regional Administra or Resident inspector (2) l i

DRP Director DRS-PSB i

l Branch Chief (DRP/A1 MIS System Project Engineer (DR'3/A)

RIV File l

Branch Chief (DRPTTSS)

I i

1 1

i a

i i

DOCUMENT NAME:

To receive copy of document, Indicate in box: "C" = Copy without/nclosures "E" = Copy w!th enclosures "N" = No copy PE:DRP/A A

C:DRP/A D:DRS@

D:DRP M

n RAKopriva;cmW JITapia W AT,Howell TP9wypn (j7 )(

l 04//5/97 04/$ /97 )

04f l /97 03/ j /97 ' V l

OFFICIAL RECORD COPY i

i l

COMANCHE PEAK STEAM ELECTRIC STATION INSPECTION PLAN IP - Inspection Procedure Tl - Temporary Instruction Core Inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION TITLE /

NUMBER OF DATES TYPE OF INSPECTION / COMMENTS PROGRAM AREA INSPECTORS iP 40500 Effectiveness of Licensee 3

04/21 -

Core inspection Controls in Identifying, 05/02/97 Reading, and Preventing Problems IP 84750 Radiation Protection 1

04/21-25/97 Core Inspection IP 40501 Eng. Self-Assessment 2

04/28-In lieu of Core Inspection 05/02/97 IP 71001 Requalification Inspection 3

04/28-Core inspection 05/02/97 IP 81700 Security inspection 2

04/28-Core inspection 05/02/97 IP 82301 Emergency Preparedness 5

07/21-25/97 Core Inspection Exercise IP 81700 Security 1

09/08-12/97 Core Inspection IP 62706 Maintenance Rule Baseline 7

10/06-10/97 Regional Team Inspection (reouired by NRR Program Office)

-