ML20138H585
| ML20138H585 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/24/1985 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR 5211-85-2175, NUDOCS 8510290088 | |
| Download: ML20138H585 (1) | |
Text
1 ENuclear
?!,ur,fa';fver""
Route 441 South Middletown, Pennsylvania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number October 24, 1985 5211-85-2175 Office of Nuclear Reactor Regulation Attn: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Heavy Loads - Crane Interlock Due to the volume of work required to suprort restart, it is taking longer than expected to complete the modification of the Fuel Handling Building Crane Interlock System. This was scheduled for October,1985 as discussed in our letter of December 21, 1984, however completion of the modification has been rescheduled for December,1985 Procedural changes to reflect use of the crane interlocks will be completed by March,1986. Adequate administrative controls are currently in place to centrol the movement of heavy loads in the Fuel Handling Building, and these controls will remain in effect until such time as this modification is complete and procedures are updated. Delay in the modification schedule for the Fuel Handling Building crane interlocks does not represent a safety concern.
Sincerely, H.D.E ill Director, TMI-1 HDH/MRK/:po cc:
J. Thema 8510290000 051024 R. Conte PDR ADOCK 05000209 P
PDR 0386A keel GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation