ML20138H515
| ML20138H515 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/07/1985 |
| From: | Powell M HOUSTON LIGHTING & POWER CO. |
| To: | Jacobi L HOUSTON LIGHTING & POWER CO. |
| References | |
| OL-I-CCANP-128, NUDOCS 8510290060 | |
| Download: ML20138H515 (2) | |
Text
i
[0 - Y9 fOUTH TEXAS PROJECT ELECTRIC GENERATING STA g
((7/gf TELEPHONE MINUTES CORRESPONDENCE SERIAL NUf2BER
,(
TO:
L. R. Jacobi asOc ST-HL-19067 M. E. Powell//((
SUBJECT FILE NUMBERS FROM:
DATE OF CALL:
May 8. 1981
'85 FT 10 A10 :56 PRIMARY: V-0530 SECONDARY:
SUBJECT:
Potential Re ccable 1:e s 5' CRETINGYS'EWvir.1 TELECON PARTICIPANTS:
W.
. Crossran (USSR $)CH UNCLUDE.NAME AND ORG ANIZATiON OF E ACH)
M. E. Powell (HL&P)
PAGE 1
OF p I called Mr. Crossman to infom the NRC that HL&P would like to report th-ee(3) items as beine noter.tially reportable pursuant to 10CFR50.55(e).
These items are as folices:
(1) Certain faulted condition heat loads may not have been considered in the desien of oortions of the HVAC system C'
which are desienated as safety related.
l (2) Concernino co outer orocram (code) verification - that the verification orcoram lacks visibility to the user whether or not the crocram versions in use have been ve ri fi ed.
'I informed Mr. Crossran that B&R has completed a review of 13 out of 23 ccmouter programs (codes) and the 13 are satisfactory.
(3) Concernina shieldinc analysis - that certain shielding cal-
.:4 culations affecting safety related considerations may not have-been verified consistent with the requirements for
(.
~.s'
' verification of safety-related calculations.
8510290060 850007
{DR ADOCK 0 % 8 STPOOO3 (6 731
O 6
v
,e s/ <p +
,9 A
/
[
t
'*n k
/,
J. G. White A t! Harrienn
'J. S. Phelps 1
o_ u411 3de.
H. J. Sweeney
.1 - n Av orsnn T.. J. Jordan o ;_
v,ven, P. S. Jordan.(B&R)
- n. v je ecto ( o r.oi K. Cook (B&R)
.1 n'n14vor (nto)
J. L. Hawks (B&R)d.td u e r-ete-=n (o f
W. Hubacek (US'IRC) 4 u s_ ohn147e (ng.en STP RMS BER DCC e n, ra m,e -,
e
,