Text
-
W f -[()M)g 7etr i
i
)
Brown &RootjnC. Post oriice sox Three, H'ouston. Texas 77001 A Halbbwf10M comPJN ffi y[
March 20,1981
- j 1
i
-[m ST-BR-HL-37384 o
4 SFN: A-0220
~ ~ ~
Houston Lighting & Power Company P.O. Box 1700 Houston. Texas 77001 Attention:
J. L. Blau I
Project Engineering Manager South Texas Project Electric Generating Station
Subject:
Engineering Review of Brown & Root Gentlemen:
On March 16, 1981 in a meeting between HL&P and Brown & Root, a letter containing preliminary findings of the Engineering Review of Brown &
This letter contained concerns regarding the con-Root was presented.
duct of STP ALARA reviews to date, and recomended that a vigorous ALARA Re-review Program be initiated.
As you know, recent efforts have been actively underway by both Brown
& Root and HL&P to bolster the ALARA capabilities on the South Texas Project culminating in the following actions:
Use of an HL&P reviewer (Mr. W. C. Parish) on Site, to supplement 1.
Brown & Root as an interim measure while an active hiring effort for permanent Brown & Root Site capability was achieved.
Recent integration of all Houston ALARA, efforts under Mr. 5. Brown 2.
(BAR).
Recent hiring of Mr. R. Strickland by B&R as Site ALARA Reviewer.
l 3.
In response to recomendations to speed-up the fomalization of the ALARA doctanentation and establistynent of the ALARA Team to perform the ALARA Re-review Program, we have taken the following(action with the con j
and concurrence of your Health Physics Staff.
The ALARA staff under 5. Brown will be issnediately established using the l
following personnel:
Mr. J. McAlpin and Mr. E. Goldin of HL&P. who will be on temporarily 1.
This is recommended since these assignment (matrixed) to Brown & Root.
personnel are qualified, knowledgeable to STP and available for this work at this time.
ho2pjg g4ge gc gg g g l
l
7 4
,p
[+
,,O
-4
/
.s f:#
(*
y,,h A9 Y
Y, 4' f
,s -
ce
o March 20,1981 N
Page 2 ST-BR-HL-37384 Approximately 2 NUS personnel, plus specialized back-up pers 2.
a case basis, when required.
such as Mr. J. Connley, are qualified, are familiar with STP through work extending from conceptual design efforts to present design and have assisted HL&P in similar work for Allens Creek Project.
Mr. W. C. Parish will be retained as back-up Site ALARA Reviewer.
3.
The initial task of this group will be 50 establish th lization of doczentation. -
Very truly yours.
BROWN & ROOT, INC.
A _
A_ & x J. L. Hawks Engineering Project Manager South Texas Project Electric Generating Station JLH/JAS/rj File No.: A010G cc:
S. L. Brown J. F. Pint
/d S. M. Dew E. A. Saltare111 J. R. Sumpter (HL&P)
R.
Gauny (HL&P)
J. R. Geurts D.G. Barker (HL&P)
J. W. Briskin (H J. A. Signorelli l
(
-