ML20138H448

From kanterella
Jump to navigation Jump to search
Intervenor Exhibit I-CCANP-93,consisting of Re Engineering Review of Brown & Root.Alara Staff Under Brown Will Be Immediately Established Using Listed Personnel
ML20138H448
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/18/1985
From: Hawks J
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To: Blau J
HOUSTON LIGHTING & POWER CO.
References
OL-I-CCANP-093, OL-I-CCANP-93, NUDOCS 8510290044
Download: ML20138H448 (3)


Text

-

W f -[()M)g 7etr i

i

)

Brown &RootjnC. Post oriice sox Three, H'ouston. Texas 77001 A Halbbwf10M comPJN ffi y[

March 20,1981

  • j 1

i

-[m ST-BR-HL-37384 o

4 SFN: A-0220

~ ~ ~

Houston Lighting & Power Company P.O. Box 1700 Houston. Texas 77001 Attention:

J. L. Blau I

Project Engineering Manager South Texas Project Electric Generating Station

Subject:

Engineering Review of Brown & Root Gentlemen:

On March 16, 1981 in a meeting between HL&P and Brown & Root, a letter containing preliminary findings of the Engineering Review of Brown &

This letter contained concerns regarding the con-Root was presented.

duct of STP ALARA reviews to date, and recomended that a vigorous ALARA Re-review Program be initiated.

As you know, recent efforts have been actively underway by both Brown

& Root and HL&P to bolster the ALARA capabilities on the South Texas Project culminating in the following actions:

Use of an HL&P reviewer (Mr. W. C. Parish) on Site, to supplement 1.

Brown & Root as an interim measure while an active hiring effort for permanent Brown & Root Site capability was achieved.

Recent integration of all Houston ALARA, efforts under Mr. 5. Brown 2.

(BAR).

Recent hiring of Mr. R. Strickland by B&R as Site ALARA Reviewer.

l 3.

In response to recomendations to speed-up the fomalization of the ALARA doctanentation and establistynent of the ALARA Team to perform the ALARA Re-review Program, we have taken the following(action with the con j

and concurrence of your Health Physics Staff.

The ALARA staff under 5. Brown will be issnediately established using the l

following personnel:

Mr. J. McAlpin and Mr. E. Goldin of HL&P. who will be on temporarily 1.

This is recommended since these assignment (matrixed) to Brown & Root.

personnel are qualified, knowledgeable to STP and available for this work at this time.

ho2pjg g4ge gc gg g g l

l

7 4

,p

[+

,,O

-4

/

.s f:#

(*

y,,h A9 Y

Y, 4' f

,s -

ce

o March 20,1981 N

Page 2 ST-BR-HL-37384 Approximately 2 NUS personnel, plus specialized back-up pers 2.

a case basis, when required.

such as Mr. J. Connley, are qualified, are familiar with STP through work extending from conceptual design efforts to present design and have assisted HL&P in similar work for Allens Creek Project.

Mr. W. C. Parish will be retained as back-up Site ALARA Reviewer.

3.

The initial task of this group will be 50 establish th lization of doczentation. -

Very truly yours.

BROWN & ROOT, INC.

A _

A_ & x J. L. Hawks Engineering Project Manager South Texas Project Electric Generating Station JLH/JAS/rj File No.: A010G cc:

S. L. Brown J. F. Pint

/d S. M. Dew E. A. Saltare111 J. R. Sumpter (HL&P)

R.

Gauny (HL&P)

J. R. Geurts D.G. Barker (HL&P)

J. W. Briskin (H J. A. Signorelli l

(

-