ML20138H354

From kanterella
Jump to navigation Jump to search
Forwards Vermont Yankee Cycle 18 Operating Rept, Which Describes Changes,Tests & Experiments,Including Summary of SE
ML20138H354
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/02/1997
From: Duffy J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138H358 List:
References
BVY-97-60, NUDOCS 9705070149
Download: ML20138H354 (1)


Text

- - -- . .

" VERMONT YANKEE i NUCLEAR POWER CORPORATION '

s

. Ferry Road, Brattleboro, VT 05301-7002 REPLY TO s ENGINEERING OFFICE 580 MAIN STREET BOLToN. MA 01740 (508) 779-6711 May 2,1997 BVY 97-60 United States Nuclear Regulatory Commission ATTN: Document Control Desk

Washington, DC 20555 I

References:

(a) License No. DPR-28 (Docket No. 50-271)

Subject:

Vermont Yankee Cycle 18 Operating Report Enclosed please find one copy of the Vermont Yankee Cycle 18 Operating Report, submitted in accordance with 10CFR50.59(b)(2) and 10CFR50.4. This report describes the changes, tests, and experiments, including a summary of the safety evaluation of each, which were conducted between May 3,1995 and November 2,1996 without prior NRC approval in accordance with 10CFR50.59. In addition, the summaries of two changes inadvertently omitted from the Cycle 17 Operating Report are also provided.

In accordance with 10CFR50.59(b)(2), this submittal is being made concurrent with a revision to the Final Safety Analysis Report (FSAR), being submitted under separate cover.

We trust this information is acceptable; however, should you have any questions, please contact this office.

Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION 6&l'fl <

James J. Duffy Licensing Engineer 070002 I

Enclosure:

Vermont Yankee Cycle 18 Operating Report c: USNRC Region I Administrator USNRC Resident inspector - V'(NPS USNRC Project Manager - VYNPS 9705070149 970502

'\1i!

i*Il\\\\t' R, !\.\\D=\\\1 i

PDR ADOCK 05000271 *

~ ~ ~~~~~

P PDR