Univ of Virginia Nuclear Reactor Facility 1996 Emergency Preparedness Exercise Scenario for 961119
ML20138H117
Person / Time
Site: University of Virginia
Issue date: 11/19/1996
From:
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
To:
Shared Package
ML20138H098 List:
References
NUDOCS 9705070077
Download: ML20138H117 (5)


Text

. = . . . . . ~ . . . .. .- -_- . - . - . - - .. .

l University of Virginia Emergency Preparedness Drill

+ , i Nucle' ar Reactor Facility for Tuesday, November 19,1996 l

l

-i

)

i l

l l University of Virginia Nuclear Reactor Facility 1996  ;

Emergency Preparedness Exercise Scenario l for l Tuesday, November 19,1996 l

for Exercise Evaluators only Not for General Distribution I

University of Virginia School of Engineering and Applied Science l Department of Mechanical, Aerospace, and Nuclear Engineering Nuclear Reactor Facility Charlottesville, VA 22903-2442 1

L I

\

i  :

l l l

l l

I J

l 4

4 j.

Y 9705070077 970507

PDR ADOCK 05000062 F PDR 1 i

t  ;

University of Virginia Emergency Preparedness Drill 4 Nhcle'ar Reactor Facility for Tuesday, November 19,1996 Objectives:

1. Test emergency situation assessment, job familiarity, and decision-making ability of facility personnel;
2. Functionally test communication systems and the ability of personnel to use them; ,
3. Test contamination identification and control abilities of staff, if (

it occurs;

4. Test adequacy and appropriateness of the Emergency Plan and Implementing Procedures;
5. Test response time and performance of tmiversity- and )

community-based emergency aid organizations and staff interactions with the USNRC Emergency Operations Center. )

Scope: -  ;

The 1996 Emergency Exercise for the University of Virginia Nuclear Reactor Facility is scheduled for Tuesday, November 19,1996, starting at 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> and expected to last about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

The scenario includes a breach of security by an intruder, a staff member )

injured by the intruder, and a bomb placed on-site. Local police, fire and )

rescue personnel are expected to respond appropriately.

The exercise will be terminated soon after the bomb is demonstrated to be a hoax.

All initial, follow-up, and close-out communications will be actually made, by telephone, radio, FAX, e-mail, or other means. None will be simulated.

1 1

2 i

~ ,

o University of Virginia Emergency Preparedness Drill

, s Nucitar Reactor Facility for Tuesday, November 19,19%

The response team may request state emergency services aid in:

1. radiological monitoring;

! 2. notification and evacuation of community personnel in surrounding areas.

If state emergency assistance is deemed necessary, any request for same will be noted, and state personnel will be deemed to have arrived immediately L and be available for action.

Any notification or evacuation of persons in the surrounding community will be simulated only.

Scenario victim (s') transport to the UVA Hospital will be simulated, if it l occurs, i

l

!. Scenario:

l l

Before drill action begins, a fictitious ticking bomb package will be placed j on top of the CAVALIER Room pit grate. The room door lock will be l placed nearby on the floor and labeled as i

i i

I c

4 4

4 i

3 f

University of Virginia Emergency Preparedness Drill

, d Ifuclear Reactor Facility for Tuesday, November 19,1996 bcenario Events Local Action Expected ESC Action Expected T-10 nunutes Reactor operation is actual. Staff None Tuesday mondng, UVAR and faculty arriving, perfonning operating normally at 2 MW. nonnal activities.

T=0 minutes Normal activities until some None Armouncement is made that E- indication of trouble, drill is beginning.

T=5 ndnutes None None Perpetrator gains access to facility through rear door.

T=7 minutes None None Perpetrator is in interrupted by a student, who is rendered unconscious, in the Counting Room Hallway, with a head wound, which is bleeding steadily.

T= 10 minutes Staff respond to locate cause of None Perpetrator cuts kick on Cavalier alami at T= 10 minutes, or after Room door, deposits bomb on police arrive.

top of pit grate, then leaves.

Silent door alann is triggered.

T = 15-20 ndnutes Staff curveying scene Police arrive at front UVAR door, if silent alann has not yet been noticed.

T=25 minutes Recognizing an apparent Reactor Director enters EPIP 1 Staff find Cavalier Room door intrusion, staff discuss further sets up ESC, begins event open, lock cut, action with police responders. classification. Open EPIP 1, 1 Attaciunent 3  !

Reactor is shut down, Director is (Activation / Termination leg) l called, and Supervisor takes i charge of scene. An Emergency For intrusion only, consider Staff find injured person, either Communicator at the scene is " Unusual Event", which requires immediately or later through designated. Communications initiation of EPIP 2. Activate accountability exercise. established EPIP 7, Notifications.

Call Medic-5 for assistance, Consider evacuating all or non-activate EPIP 13 when victim is essential personnel and searching found, render first aid, for perpetrator.

Make initial notifications ASAP.

4

-. . , .. . .- _ . ~.

v

'

, < Nucidar Reactor Facility for Tuesday, November 19,1996

- i T=30 minutes Relay bomb infonnation to ESC. Consider classification as up to a Ticking bomb is found on top of General Emergency, which pit prate. Sound evacuation alarm and requires activation of EPIP 5.

l announce.

initiate Personnel Accountability, EPIP 11.

, Missing person (victim) should be discovered no later than this.

i

, Search for missing person, if Make initial or follow-up newsary. Call for medical notifications.

assistance and activate EPIP 13 if not yet done. continue first aid. +

T= < 75 minutes Possible search for Perpetrator. Consider appropriate site Fictitious bomb timer continues responses to the intrusion, bomb, to tick. Set up air sampling, monitoring, and victim rescue, and contamination control equipment, in lieu of possible explosion and dispersion of Pass emergency personnel radioactive material, instructions to on-site staff about what to do about the bomb.

Continue to aid and/or evacuate victim.

Make follow-up notifications.

Follow ESC directions and continue to relay information.

T=75 minutes (Option 1)

Bomb detonates with just a puff Evacuate victim, if not done yet. Begin to take recovery actions, of smoke. It will be announced as practical, via EPIP 20.

that the bomb was obviously a Search building for intruder.

hoax. Recovery is accomplished via Assist EPIP closc-out actions. EPIP 20 Drill terminated when:

Re-entry accomplished via

1. victim is evacuated: EPIP 19
2. building declared intruder- Closed-out and document drill ,

free; via EPIP 23.

3. emergency-drill closedeut.

s i

1 5

s

s. -