t JOSEPH M. FARLEY NUCLEAR PLANT l

UNIT 1 NARRATIVE StMIARY OF OPERATIONS l

November, 1985 i

There were no unit shutdowns during the month of November.

A significant power reduction occurred on 11-15-85. Power was reduced to approximately 30% of rated thermal power to facilitate a containment entry to add oil to the IC reactor coolant pump.

The following major safety-related maintenance was performed in the month of November.

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators, i

t a

f 851217o047 851130 DR ADOCK 05000348 eor

&(l

--~

k OPERATING DATA REPORT DOCKET NO. 50-348 DATE 12-5-83 4

COMPLETED BY J. D. Woodard TELEPHONE DOS) 899-5156 s

OPERATING STATUS Joseph M. Farley - Unit 1 Notes

l. Unt h
1) Cumulative data aince
2. Reporting Penod: Nemb r - 19R5 12-1-77, date of commercial
3. I wwa=d Thennal Power (MWt): 2652 Peration 860
4. Nameplate Rating (Gross MWe):

829

5. Dessa Electncal Rating (Net MWe):

860.9

6. Maxin usa C.,

't Capacity (Gross MWe):

8ID 5

7. Maxinium Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Sin:e Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any: N/A O

~ ~

This Month Yr to.Dete Cumulative 720 8,016 70,128

11. Hours In Reportmg Period
12. Number Of Hours Reactor Was Critical 720,0 6.76 0,1 48,n89.I
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On.Line 720.0 6,637.2 47,6o1.6 i

0.0 0.0 o,o

15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1,865,690 17,021,536 120,928,111
17. Gross Electncal Energy Generated (MWH) 616.904 5.560.538 38.654.852
18. Net Electrical Energy Generated (MWH) 585.354 5.252.510 36.381.556
19. Unit Service Factor 100.0_

82.8 68.0 100.0 82.8 68.0

20. Unit Availability Factor 99.6 80.3 64.9 i
21. Unit Capacuy Factor (Using MDC Net) 98.1 79.0 62.6
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 2.0 11.8
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

N/A l

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY OR_n6 77 on-no-77 INITIAL ELECTRICITY OR-20-77 OR-1R-77 COMMERCIAL OPERATION 12-01-77 12-01-77 (9/77 )

. - ~.

50-348 DOCKETNO.

I UNIT DAE December 5,1985 l

J. D. Woodard COMPLETED BY O

TELEPHONE (205)899-5156 November 310NUI DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL QlWe Net)

(31We-Net)

I.

17 824 830 gg

__ _ _ p --

gy g9 ~.

821 3

819 4'

829 7g 796 3

831 21 823 6

832 g

7 R2 7 23 826 8

24 826 822 9

830 3

10 82 7 26 821 821 1I 825 3

825 819 12 3

818 13 825 3

820 14 823 30 15 506 3g 16 825 INSTRUCUONS On this form:r. list the 2venge daily unit puwe levelin MWe Net for each d:y in the reporting inonth. Compute to

, the neare:t whole rnegswatt.

(9p7) l l

l

O O

O DOCKETNO. _5d-348 UNIT SilU1 DOWNS ANC POWER RElH)CIlONS J. M. Farley - Unit.1 UNIT NAME DATE December 5, 1985 HEPONT MON fil Novembe r, 1985 COMPLETED uy J. D. Woodard TEIAPilONE (205)899-5156 t ui E

,7 g x5y Lkcusec

[v, E*L Cause & Corecclive c

re

.2 e 8

No.

Daic

(

gg g

Event uv i

Acigon so ji8g Repos #

$0 o

a6 E

p,,,,,,g,,,,,,,c, 6

008 851115 F

0 B

4 N/A AB P

Power was reduced to 30% to facilitato a containment entry to add oil to the 1 C reactor coolant pump. motor.

l 2

3 4

i F: Fosccd Reason:

Method:

Exhibi G. insituctions S: S(hedaded A Equipment Failure (Esplain) 1 -Manual for Pseparaison of Data B-Maintenance of Tes 2 Manual Scram.

Entey Sheets for 1.iccusee C Refueling 3 Automalic Scram.

Event Repens (1.ER) File INUREG-D Regulatiny Resitiction 4-Other (Esplaisi) 0161)

E-Operator Training A license Examination F Administrative 5

G Opesasiemal lissos (limplain)

Enlabia 1 - Same Souice (9/77) ll Othcs (Emplain) 4

    • Caiting Address Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Sen or Vice President Fimtndge Build.ng Al}{);gl))glI()ggy December 9, 1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the November 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very tr ty

[f)n lql -l

[hb f

R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)

Director, R!l (1 copy) 6 a