ML20138G668

From kanterella
Jump to navigation Jump to search
Forwards LER 97-003-01,failure to Meet Requirements of TS 4.5.2.c Re Surveillance Insp of Containment for Loose Debris
Date released: 05/31/2020 Download: ML20138G668


:on 970224,TS SR 4.5.2 Was Not Met When Loose Debris Was Discovered in Reactor Containment Bldg.Caused by Failure to Communicate Mgts Expectation.Loose Debris Was Removed
ML20138G695
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 04/28/1997
From: Head S
HOUSTON LIGHTING & POWER CO.
To:
References
Download: ML20138G695 (4)
Forwards LER 97-003-01,failure to Meet Requirements of TS 4.5.2.c Re Surveillance Insp of Containment for Loose Debris
ML20138G661
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 04/28/1997
From: Masse R
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20138G661 (2)