4 Mr. R bert E. Link, Vice President October 17, 1996 Nuclear Power Department-Wiscensin Electric Pow:sr Company 1
231 West Michigan Street, Room P379 i
j Milwaukee, WI 53201 i-
SUBJECT:
NEED FOR NRC STAFF APPROVAL 0F STEAM GENERATOR REPLACEMENT ACTIVITIES, POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Link:
i Thank you for calling to our attention the paragraph in the NRC Staff's l
Environmental Assessment (EA) on construction permit recapture, dated March 10, 1987, that indicates that before any future steam generator replacement activities take place, the NRC staff will evaluate and approve those activities for their radiological environmental effects (EA, March 10, 1987, Section 3.1.3).
The statement seems to reflect the staff's intention to track a commitment i
made by Wisconsin Electric in connection with the repair of the Unit 1 steam generators to make every reasonable effort to inaintain occupational radiation i
exposures as low as is reasonably achievable (ALARA) in accordance with 10 CFR j
20.1(c).
(See Safety Evaluation dated September 30, 1983, Section 7.0.)
As you know, since that time, 10 CFR Part 20 has been revised and, with respect to occupational dose, ALARA is now a requirement. Thus, the commitment reflected in the staff's EA on construction permit recapture (1987) and SE on steam generator repair in 1983 is no longer operative and staff evaluation and j
review prior to steam generator replacement is not necessary.
4 If you have any questions regarding the matter, please contact Linda Gundrum of my staff at (301) 415-1380.
Sincerely, j
Original signed,by:
John N. Hannon, Director Project Directorate 111-1 1
Division of Reactor Projects III/IV 1
Office of Nuclear Reactor Regulation Docket Nos. 50-266 i
and 50-301 i
l cc: See next page 1
heOl l
DISTRIBUTION:
tecketiFiley OGC U
l PUBLIC ACRS I
PD31 Reading EAdensam (E)
JRoe JCaldwell (Region 3)
}
j GGeorgiev (ECGB)
I DOCUMENT NAME: G:\\WPDOCS\\PTBEACH\\PTBSTM(iN.LTR
}
To receive a copy of this document, indicate in the box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy *See previous Concurrence OFFICE PD33:LA 1.
C PD33:PM E
OGC PD31:PM PD33:PD W NAME CJamerson
(!J /
AHansen*
AHodgdon*
LGundrum/)SJ JHannon DATE 10/ite/96
/f 10/09/96 10/10/96 10//W96 10//f/96 V
0FFICIAL LECORD COPY 9610180283 961017 NBC File CENTER COPY DR ADOCK 0500 6
)
Mr. Robert E. Link, Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos. I and 2 cc:
Ernest L. Blake, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, DC 20037 Mr. Gregory J. Maxfield, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, Illinois 60532-4531 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 l
l
-