Forwards Reply to 851115 Request for Addl Info Re Decommissioning of L-77 Research Reactor
ML20138F792
Person / Time
Site: 05000433
Issue date: 12/09/1985
From: Kroes R
CALIFORNIA, UNIV. OF, SANTA BARBARA, CA
To: Thomas C
NRC
References
NUDOCS 8512160171
Download: ML20138F792 (2)


Text

~

r

-y UNIVERSITY OF CALIFORNIA, SANTA BARBARA mLRKELEY

  • DAVIS
  • IRVINE
  • LOS ANCELES
  • RIVERSIDE
  • SAN DIECO
  • SAN FRANCISCO SANTA BARSARA
  • SANTA CRUZ DAVID PIEaroNT GARDNER President qf the Unitersity OFFICE OF THE CHANCELIDR SANTA BARBARA, CALIFORNI A 93106 ROBERT A. HUTTEN8ACK Chancellor at Santa Barbara December 9, 1985 Cecil 0. Thomas, Chief Standardization and Special Projects Branch Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket 50-433

Dear Sir:

Enclosed are twenty-one copies of the reply to the additional information request dated November 15, 1985, regarding decommissioning of the UCSB L-77 Research Reactor.

Sincerely, Robert T. Kroes Vice Chancellor Administrative Services cc: Director of Licensing U.S. NRC Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Frank Gallagher Environmental Health 6 Safety

~ Subscribed and sworn:

\M-U"$ T PbIU M cAA Gowm, won 6o d

sq 3,M% . . .. . . .. . .

OFFICIAL SEAL BETTY EUZABETH CALDERON B512160171 851209 PDR p ADOCK 05000433 PDR 9 NOTARY PUBUC SANTA BARBW COUNTY "1""" "#" " 3' #

O 3

\

V

. December 5, 1985 Docket 50-433 A.E. Profio V

I; Additional Comments on Additional Questions Regarding Decommissioning of the UCSB L-77 Research' Reactor I By letter dated. November 15, 1985, NRC' requested additional

(- information on the UCSB L-77 Research Reac' tor p Decommissioning Plan. Most of these questions were already l answered in our reply dated November 15, 1985, based on an earlier-draft request. These additonal comments are offered

- to comply with the request to respond by December 9, 1985.

l

1. Analysis of shield water: already answered. I
2. Records: already answered.
3. Radiation protection programs already answered.
4. Surface' contamination: already answered with regard to Regulatory Guide 1.86.. ~

l

5. Exposure rate meters already answered, with respect.to'

~

energy . sensitivity of.NaI de t e c t~or .

6. Termination Radiation Survey sampling.of floor areas:

UCSB.will follow whatever sampling method is required by l L NRC, but the sampling by smearing 1 sq meter out of 10 sq l- meters is. believed to be adequate. Many areas have been-l-

smeared in the periodic radiation and contamination surveys required by the Technical" Specifications, and these have been at background except for-tritium contaminated areas near the accelerator. The accelerator is being removed and the area decontaminated. This work is-expected to be. completed before'the Termination Radiation Survey for the reactor facility.

I l'