ML20138F554

From kanterella
Jump to navigation Jump to search
Forwards Cooper Nuclear Station COLR for Cycle 18
ML20138F554
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/29/1997
From: Graham P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138F559 List:
References
NLS970072, NUDOCS 9705060003
Download: ML20138F554 (2)


Text

.

~

COOPER NUCLEAR STATON g

P.O. BOX 98, BROWNVILLE, NEBRASKA 68321 Nebraska Public Power District

  • %"AMf" NLS970072 April 29,1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Core Operating Limits Report Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Cooper Nuclear Station (CNS) Technical Specification 6.5.1.G requires that core operating limits be documented in the Core Operating Limits Report (COLR) and be submitted to the NRC prior to each reload cycle for changes to the following cycle specific parameters:

1. The Average Planar Linear IIeat Generation Rate (APLHGR)
2. The Linear lieat Generation Rate (LIIGR)
3. The 14 core flow Minimum Critical Power Ratio (MCPR) adjustment factor
4. The MCPR
5. The rod block monitor upscale setpoint For Cycle 18 operations at CNS, a change has been made to the operating limits for MCPR and consequently, the COLR has been updated and it is being submitted as an attachment to this letter.

In accordance with 10 CFR 50.4 (b)(1), we are enclosing one original of the revised COLR for your use, and are transmitting one copy to the Regional Office, and one copy to the NRC Resident Inspector for CNS.

ho>OI 1

050103 9705060003 970429..

\\Q\\]h]h]&.\\h

~

PDR ADOCK 05000298 P

PDR

$&S$%k Y{fNk6WhE010$$l0[$h$f$UM$$V?&MW$

y, * ' Ql, '

==

==

==

.. ~..... -.

.. -. - -...-.-- -.~ - - - -.._-. -

1 l

t

- NLS970072 April 29,1997 l

Page 2 l

Should you have any questions concerning this matter, please contact me.

l l

' Sincerely, l

l fD8? -

l P. D. Graham j

Vice President - Nuclear i

/gs I

Attachment cc: Regional Administrator USNRC - Region IV Senior Project. Manager USNRC - NRR Project Directorate IV-1 i

2 Senior Resident Inspector USNRC r

NPG Distribution i

i

.-