Amends 176 & 172 to Licenses DPR-29 & DPR-30,respectively, Revising TSs by Increasing Load Test Values of EDGs in SR 4.9.A.8.h from Between 2625 Kw & 2750 Kw to 2730 Kw to 2860 Kw
ML20138F271
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/01/1997
From: Pulsifer R
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20138F275 List:
References
NUDOCS 9705050322
Download: ML20138F271 (6)


Text

.

omr,

[p

[1 UNITED STATES g

),j NUCLEAR REGULATORY COMMISSION o

' 1" WASHINGTON, D.C. 20666-000%

+9.....,o COMMONWEALTH EDIS0N COMP!LNY j

AND MIDAMERICAN ENERGY COMPANY DOCKET N0. 50-254 OVAD CITIES NUCLEAR POWER STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE 4

Amendment No. 176 r

License No. DPR-29 l

1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated February 17, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the l

Commission; C.

There is reasonable assurance (i) that the acuvities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR j

Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, i

and paragraph 3.B. of Facility Operating License No. DPR-29 is hereby amended to read as follows-l 9705050322 970501 PDR ADOCK 05000254 i

P PDR

B.

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 176, are hereby incorporated in the 4

4 license. The licensee shall operate the facility in accordance 4

with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and l

shall be implemented within 60 days.

i FOR THE NUCLEAR REGULATORY COMMISSION r

Robert M. Pulsifer, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: May 1, 1997 i

I I

1

1 Y%

g u

UNITED STATES g

,j NUCLEAR REGULATORY COMMISSION

's WASHINGTON, D.C. 2066H001 o

49.....,o COMMONWEALTH EDIS0N COMPANY AND MIDAMERICAN ENERGY COMPANY l

DOCKET NO. 50-265 OVAD CITIES NUCLEAR POWER STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE 1

Amendment No. 172 License No. OPR-30 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Commonwealth Edison Company (the licensee) dated February 17, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B. of Facility Operating License No. DPR-30 is hereby amended to read as follows:

B.

Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.172, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION Robert M. Pulsi er, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: May 1, 1997 i

e a

~

ATTACHMENT T0 LICENSE AMENDMENT NOS.176 AND 172 i

FACILITY OPERATING LICENSE N05. DPR-29 AND DPR-30 DOCKET NOS. 50-254 AND 50-265 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages. The revised pages are identified by the captioned amendment numbers and co'ntain marginal lines indicating the area of change.

REMOVE INSERT 3/4.9-7 3/4.9-7

ELECTRICAL POWER SYSTEMS A.C. Sources - Operating 3/4.9.A 4

3.9 - LIMITING CONDITIONS FOR OPERATION 4.9 - SURVEILLANCE REQUIREMENTS g.

Verifying that all automatic diesel generator trips, except engine overspeed and generator differential current are automatically bypassed upon sn emergency actuation signal.

h.

Verifying the diesel generator operates for ;2:24 hours. During the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to between 2730 and 2860 kW'8 and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to between 2470 and 2600 kWi". The generator voltage and frequency shall be 4160 i420 volts and 60 t 1.2 Hz, respectively, in s 10 ser onds after the start signal; the steady state generator voltage and frequency shall be maintained within these l

limits during this test. Within 5 minutes after completing this 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test, perform Surveillance Requirement 4.9. A.2.c").

i.

Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of 2860 kW.

l

)

i l

d Momentary trancients outside of the load range do not invalidate this test. Diesel generator loadings may include gradual loading as recommended by the manuf acturer/ vendor. This surveillance shall be conducted on only one diesel generator at a time, f

if Surveillance Requirement 4.9.A.2.c is r'ot satisf actorily completed, it is not necessary to repeat the preceding 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test. Instead. the oiesel generator may be operated at approximately full load ffar 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or until the operating temperature has stabilized.

l QUAD CITIES - UNITS 1 & 2 3/4.9-7 Amendment Nos. 176 & 172