Discusses How Each Project Manager Should Document Discrepancies Identified During Review of Plant Licensing Basis Requirements Re Spent Fuel Pool Cooling & Core Offload Activities
ML20138E951
Person / Time
Issue date: 03/08/1996
From: Stolz J
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
Shared Package
ML20137R957 List:
References
FOIA-96-485 NUDOCS 9603140317
Download: ML20138E951 (4)


Text

$; -

lh A R T lr01.

l  :

March 8. 1996 MEMORANDUM T0: NRR Project Managers NRR Project Directors FROM: John F. Stolz. Director Project Directorate I-2 Division of Reactor Projects - I/II

SUBJECT:

SPENT FUEL POOL LICENSING BASIS REVIEW GUIDANCE.

CLARIFICATION FOR DISPOSITIONING IDENTIFIED DISCREPANCIES

_By memos dated February 8,1996 and March 1.1996 guidance was issued to all project managers regarding a review of plant specific licensing basis requirements with respect to spent fuel pool cooling and core offload activities. These memos also provided guidance on how to document your review -

and specifically discussed what to do when discrepancies were identified.

The purpose of this memorandum is to revise how each project manager should document discrepancies identified during the review. After the project manager has completed the plant-specific review and has prepared a report (the data sheets and supporting information described in the previous guidance memoranda), he(she) should document in the report any discrepancies found between the plant refueling practices and the design bases for both past and current reloads. The discrepancies. their significance, and resolution status should be described in detail in a separate section of the report. In addition, the project manager should identify in the cover memo submitting the report to the lead )roject manager whether or not any discrepancies have been identified during t1e spent fuel pool licensing basis review.

Also, a carbon copy of the report package should be sent concurrently to the senior resident ins)ector. It is expected that the inspector will include information about t1e discrepancies in a future inspection report as appropriate.

CONTACTS: Joe Shea. NRR 415-1428-Chet Poslusny, NRR 415-1402 toa a w n

.(? ,

4

' March B, 1996 MEMORANDUM-TO: NRR Project' Managers

'NRR Project Directors FROMr John F. Stolz Director c, Project Directorate I-2 Division of Reactor Projects --I/II

SUBJECT:

-SPENT FUEL P00L' LICENSING BASIS REVIEW GUIDANCE, . -

CLARIFICATION FOR DISPOSITIONING IDENTIFIED DISCREPANCIES-By memos dated February 8,1996 and March 1,1996,- guidance was issued to 'all project managers regarding a review of plant specific licensing basis requirements with respect to spent fuel pool cooling and core offload activities. These memos also provided guidance on how to document your review and specifically discussed what to do when discrepancies were identified.

. .The purpose of this memorandum is to revise how each project manager should

' document discrepancies identified during the review. After the project manager has completed the plant-specific review and has prepared a report (the data sheets-and supporting information described in the previous guidance memoranda), he(she) should document in the report any discrepancies found between the plant-refueling practices and the design bases for both past and current reloads. ~ The discrepancies, their significance, and resolution status should.be described in detail in a separate section of the report. In addition, the project manager should identify in the cover memo submitting the report to the lead aroject manager, whether or not any discrepancies have been identified during tie spent fuel pool licensing basis review.

.Also, a carbon copy of the report package should be sent concurrently to the senior resident ins)ector. It is expected that the inspector will include information about t1e discrepancies in a future inspection report as appropriate.

CONTACTS: Joe.Shea, NRR Original signed by J.Stolz

-415-1428 Chet Poslusny., NRR 415-1402 EISTRIBUTION:

-RZimmerman JZwolinski JRoe GHubbard

. AThadani JStolz EAdensam SJones GHolahan CPoslusny CCarpenter CGratton

.SVarga JShea CMcCracken ,

Central Files PDI-2/ Reading M0* Brien ]

0FFICE PDI-2/LA PDI 2/PM PDI-2/D  !

NAME- M0* Brien CPoslusny:mw JStolz i DATi. / /96 / /96 / /96 i E CIAL RECORD COPY .  !

DOCUMENT,NAME: MARCH 8 GUI

l.)

i j PDI-2 DOCUMENT COVER PAGE DOCUMENT NAME: MARCH 8.GUI ORIGINATOR: C.POSLUSNY SECRETARY NAME: M.WOHL l-

SUBJECT:

SPENT FUEL POOL LICENSING BASIS REVIEW GUIDANCE, CLARIFICATION FOR DISPOSITIONING IDENTIFIED DISCREPANCIES 1

1

! ***** ROUTING LIST *****

1

NAME M[E
1. M0'Brien / /96 l
2. CPoslusny / /96 t

i 3. JStolz /. /96

! 4. Secretary - Dispatch i

CAN THIS DOCUMENT BE DELETED AFTER DISPATCH? yes no l