Amend 98 to License DPR-66,revising Calibr Schedule of Seismic Instruments from within 24 H to within 30 Days to Ensure Instrumentation Available to Record after-shock Data
ML20138E831
Person / Time
Site: Beaver Valley
Issue date: 10/03/1985
From: Rubenstein L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20138E830 List:
References
NUDOCS 8512130581
Download: ML20138E831 (4)


Text

.

c.

i / UNITED STATES

'o,,

.E g NUCLEAR REGULATCRY COMMISSION t

,, t .p WASHINGTON, D. C. 20555

. l'

. . . . . ,/

l DUQUESNE LIGHT COMOANY l

OHIO EDISON COMPANY

' PENNSYLVANIA POWER COMPANY l

DOCKET NO. 50-334 BEAVER VALLEY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.98 Al

. License No. DPR-66 1 1. The Nuclear Regulatory Comission (the Comission) has found that:

A. The application for amendment by Duquesne Light Company, Ohio Edison Company, and Pennsylvania Power Company (the licensees)

I dated July 12, 1985, complies with the stanoards and requirements of the Atomic Er.crgy Act of 1954, as amended (thi: Act) and the j

" omission's rtiles and regulations set forth in 10 CFR Chapter I; I

B. The facility will operate in conformity with the application,

' the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be

, t conducted in compliance with the Comission's regulations; l

l D. The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and l E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements l! have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and naragraph 2.C.(2) of Facility Operating License No. DPR-66 is hereby amended to read as follows:

~

8512130581 851203 PDR ADOCK 05000334

P PDR l

l ,- . . - . . - - . .- - ._ _ . . . - .

. _ . . . _ _ . - _ . _ .~ _ _ _ . _ . __

~

i

+ I l

! (2) Technical Specifications l The Technical Specifications contained in Appendix A, as revised through Amendment No. 98 . are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This amendment is effective on issuance, to be implemented no later
than 30 days after issuance.

FOR THE NUCLEAR REGULATORY C0petISSION l

S* ,

Lester S. Rubenstein, Director i PWR Project Directorate #2 Division of PWR Licensing-A I

Attachment:

.'* Changes to the Technical Specifications Date of Issuance: December 3, 1985

/

e t

i i

m. -- . . . - . _ . . . - - . _ . - _

i .

1- .

T .

1 i

[, ATTACHMENT TO LICENSE AMENDMENT 6

AMENDMENT NO. 98 TO FACILITY OPERATING LICENSE NO. DPR-66 i

DOCKET NO. 50-334 l

l Revise Appendix A as follows:

Remove Page Insert Page F 3/4 3-38 3/4 3-38 l

l i

l I

L I

l W~ ' . - . - - , _ .-.

INSTRUMENTATION SEISMIC INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.3 The seismic monitoring instrumentation shown in Table 3.3-7'shall be OPERABLE.

APPLICABILITY: At all times. i ACTION:

a. With the number of OPERABLE seismic annitoring instruments less than required by Table 3.3-7. restore the . inoperable instrument (s) to OPERABLE status within 30 days.
b. With one or more seismic acnitoring instruments inoperable for more than 30 days, prepare and submit a Special Report to the Comission  !

pursuant to Specification 6.9.2.within the next 10 days outlining the cause of the malfunction and the plans for restoring the instru-ment (s)toOPERABLEstatus. ,

i c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS

{ 4.3.3.3.1 Each of the above seismic monitoring instruments shall be demon-strated OPERABLE by the perfomance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST operations at the frequencies shown in Table 4.3-4. .

4.3.3.3.2 Each of the above seismic monitoring instruments actuated during a

~

seismic event greater than or equal to 0.01g shall be restored to OPERABLE

+

status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and a CHANNEL CALIBRATION perfomed within 30 days following the seismic event. Data shall be retrieved from actuated instru-ments and analyzed to determine the magnitude of the vibratory ground motion.

A Special Report shall be prepared and submitted to the Comission pursuant to Specification 6.9.2 within 14 days describing the magnitude, frequency spec- l trum and resultant effect upon facility features important to safety.

BEAVER VALLEY - UNIT 1 3/4 3-38 Amendment No. 98 i