ML20138E503
Jump to navigation
Jump to search
| ML20138E503 | |
| Person / Time | |
|---|---|
| Issue date: | 04/24/1997 |
| From: | Craig Gordon NRC |
| To: | NRC |
| Shared Package | |
| ML20138E502 | List: |
| References | |
| NUDOCS 9705020275 | |
| Download: ML20138E503 (1) | |
Text
-.
il" From:
Craig Gordon To:
WND1.WNP9.TJO I
Date:
4/24/97 4:39pm
Subject:
Comments on ASPO procedure 1
Comments on procedure B.XX, ASPO i
The procedure should be acceptable provided item lil A. 2 is emphasized-that the l
ASPO will be used "when reauested by the Reaion". Except for item B.6, the ASPO responsibilities noted are potentialitems of regional support. For Appendix A, two or three (vs. 6 for RI and RIV) assigned ASPOs per region would provide easier coordination.
Craig CC:
RLW, JLL2, JWH3, PHL, ARB, FMC, CMY 4
4 9705020275 970428 PDR STPRG ESGLAPDR L
i