ENGINEERING ASSURANCE CORRECTIVE ACTION STATUS REPORT MILLSTONE UNIT 3 PROJECT NORTHEAST UTILITIES SERVICE COMPANY November 18, 1985 D (h D A D. Nordquist (NUSCOP Manager of Quality Assurance i

e

/$

/

1%L. Malohe (SWEC)

. Audit Team Leader W.M.}EifertkSWECT -

Chiet Engineer Engineering Assurance Engineering Assurance l

8512130313 851203ADOCK 05000423 1

PDR PDR c

P L

1.0 INTRODUCTION

1.1 General This report is an update of Reference 3 and provides the status of the actions necessary to resolve the Audit Observations and Action Items resulting from the Technical Audit of Millstone Unit 3 Proj ect performed - June 3 - July 30, 1985 (Reference 1).

This report also provides the status of items resulting from the follow-up reviews in the Environmental Qualification area as reported in the Corrective Action Status Report issued September 30, 1985 (Reference 2).

1.2 Reference 1.

Engineering Assurance Technical Audit Report, Millstone Unit 3 Proj ect, Audit No. 59, dated August Ib, 1985; including Errata dated August 22, 1985.

2.

Engineering Assurance Corrective Action Status Report, Millstone Unit 3 Project, dated September 30, 1985.

t i

3.

Engineering Assurance Corrective Action Status Report, Millstone Unit 3 Project, dated November 1,1985.

i d

O l

i i

1 1-1 c-,.

4 2.0-STATUS

SUMMARY

Table I identifies the audit items that were open at the time of issue of the Corrective Action Status Report, dated November 1, 1985.

(Reference 3).

Forty-nine items are listed. The action required to resolve these items have been satisfactorily completed and verified by the audit team. All items reported in Reference 1 are now closed.

s n

i i

j i

i

)

1

.i

[

2-1 e

E

TABLEI

'i MILLSTONE UNIT 3 TECHNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.O.

Action.

Number Subject Item No. Status Code 161, item 2 Assumptions of setpoint C-046, Closed-Satisfactorily C,2 E

calcs. not address' g Item I resolved m

requirements 161, Item 4 Method used in setpoint C-046, Closed -

C,2 calc. does not address Item 3 Satisfactorily adverse environmental resolved effects 161, Item 5 Seismic effects on C-011, Closed -

C,2 instrument performance Item 4 Satisfactorily not used in calc. from resolved source document.

164, Item 2 Not apparent that RSS P-006, Closed-C,2 design temp. envelopes P-031 Satisfactorily completed range.

sensitivity studies.

164, Item 3 Basis for compliance P-031 ^

Closed -

C,2 with RG 1.141 not Satisfactorily completed established 2-2 T

3

TABLEI MILLSTONE UNIT 3 TECilNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS

- A.O.

Action Number Subject Item No. Status Code 164, Item 4 Not apparent that RSS P-Oll, Closed-Action C,2 design pressure P-013, Satisfactorily considered pump shutoff P-006, Complete.

pressure or "as tested" P-031 164, Item 7 Not apparent how SRP P-026 Closed-Action C,2 6.2.4 is satisfied Satistactorily regarding leakage Comp 1.ete.

detection.

164, item 8 Initial design P-026 Closed - donsideration C,2 consideration to maintain i;lemonstrated subatmospheric conditions for 30 days under failure of isolation valve not -

demonstrated.

b 164, item 9 Justification for not P-027 Closed-Action C,2 adding relief valve to Satisfactorily RSS because of Problem Complete.

Report PR-149 not provided.

i 2-3 A

TABLEI MILLSTONE UNIT 3 TECHNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.O.

Action Numig Subject item No. Status Code 164, Item 10

. Cales. prepared refer P-033 Closed -

C,3 to earlier revisions Satisfactorily of flow diagrams than resolved specified in the Stress Data Package 165, Item i Pressure Drop Required P-007 Closed-Satisfactorily C,3 (Calc. 610 PCR) for 3RSS-complete.

R039A/B Orifice Concerns with Calc P(R)-1115 P-009 Containment Recire.

Spray Head Calculation Concerns with System P-Oli

~ Design Pressure (Calc. 551P)

Concerns with Setpoints P-012 within Containment Recirc.

Pump Manifold Recirc.

Calc. 659P(R)

Method of Calc. not appropriate 165, Item 11 E&DCR F-C-02358, P-023 Closed - Project C,3 Concern with the issued memo on justification E&DCR justifications.

2-4 w

TABLEI MILLSTONE UNIT 3 TECHNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.O.

Action Number Subject Item No. Status Code 166, Item 1 Thermal & torsional S-051 Closed-Action C,2 Loads on steel beams satisfactorily are not addressed in complete.

calculation 166, Item 2 Calculation not S-048 Closed-Action C,2 performed for certain satisfactorily doors in the ESF Building complete.

166, Item 4 Tornado effects on design S-047 Closed-Action C,2 of shield doors support satisfactdrily not documented complete.

l 166, Item 5 No evidence of impact S-046 Closed-Implementation C,1 i

loads from pipe rupture to be followed under AO transmitted by EMD to 171, Item 10.

Structural discipline.

1 167, Item 1.b.

No documentation for R-009 Closed-Action C,1 conclusion of not satisfactorily performing HELB/MELB in complete.

ESF Building 2-5

TABLEI MILLSTONE UNIT 3 TECHNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.O.

Action Number Subject item No. Status Code 167, item 2 Local environments P-029 Closed-satisfactorily C,3 beyond those of NETM 26 resolved.

not apparently considered for some equipment.

163, item 2 No indication could be 3-014 Closed-Confirmed C,2 found where computer verification of program was scheduled computer program.

for qualification.

163, Data Equipment seismic J-055 Closed-Procedure C,2 Transmittais qualification concern (NETM 59) issued.

with the interface between disciplines.

169, item 2 Allowable stresses used 3-052 Closed - Satisfactorily C,2 not in agreement with resolved.

FSAR, Table 3.9B-7.

1 2-6

TABLEI MILLSTONE UNIT 3 TECHNICAL AUDIT AUDIT NO. 39 AUDIT OBSERVATION (AO) STATUS A.O.

Action Number Subject item No. Status Code 169, item 3 Loads not in agreement 3-053 Closed - Satisfactorily C,3.

for embedments by the completed Structural Group. Nozzle load revisions not factored in mechanical and vendor calculations.

169, Item 5 Documentation review for3-062 Closed - Documentation C,3 3RSS*MOV23A, B, C, D 12" complete valve / torque tube / actuator revealed several concerns.

169, item 7 Cales. need review to 3-025 C;losed - Satisfactorily C,3 assure references to dompleted PSAS nozzle load cales.

are valid and current 169, Item 12 Equipment Qualification-3-053 Closed - Satisfactorily C,2 Review of Nozzle Loads completed on component qualification basis.

169, Item 13 Updating of design 3-015 Closed - Generic E&DCR C,2 specifications in issued.

regard to seismic section requirements.

2-7

,,,,._,.-.i.m

.___.._._______.____._..m TABLEI MILLSTONE UNIT 3 TECHNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS i

i.

A.O.

Action Number Subject item No. Status Code j

170, item I Ilazard report lacks 11-2 3, Closed-Action C,1 references to criteria IIA.I.2 satisfactorily and design documents complete.

that support FMEA l

conclusions 170, Item 2 flazard report lacks the

!!-23, Closed - Action C,1 ba.;is of a controlled II.A.3 satisfactorily completed.

document, no review and approval.

170, Item 4 The Hazard FMEA not 11-021, plosed-At n

C,1 suf ficiently documented H-23, satisfactorily complete.

to ensure conclusions II.A.1 are readily substantiated.

171, Item I.5 -

Hazard report interaction H-019 & Closed-Action C,1 evaluations do not H-023 satisfactorily complete.

address missile potential hazards associated with resolutions.

2-8 l

.__ _ m.. _. _ _ ___. _ _ _. _ -.

1 l

TABLEI MILLSTONE UNIT 3 TECHNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.O.

Action i

Number -

Subject Item No. Status Code 171, Item I.6a Single active failure H-013, Closed-LCN issued.

C,1 criterion implemented H-018 (749) j by the Hazard Report l

dit'ers from the FSAR-l

'clectrical components.'

l i

171, Item 1.7 Ilazard report lacks H-0!!

Closed-Action C,1 review criteria for satisfactorily ensuring only Seismic complete.

I CAT I systems and l

components are utilized.

171, item I.9 Hazard report lacks H-023, Closed-Action C,1 review criteria for I.D. &

satisfactorily ensuring containment complete.

isolation system piping l

and components are protected from LOCA.

171, Item 1.10 Hazards report does not S-026 &

Closed-Action C,1 document structural 5-052 satisfactorily evaluaton of IlELB complete.

effects.

i O

2-9 l

.._y

-.r..

TABLEI

. MILLSTONE UNIT 3 TECilNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.O.

Action Number SuLiect Item No. Status Code 171, Item I.11 Ilazards interaction 11-021 & Closed-Action C,1 summaries lack analysis 5-052 satisfactorily summaries documenting completed.

review of items which may be targets of hazards.

171, item I.12 Review criteria and H-002 Closed - LCN issued C,1 FMEA results for jet impingement ef fects on i

systems, components, etc.

not evaluated by the 11azards program.

171, Item I.13 tiazard evaluation of 11-018 Closed-Action C,1 missiles and ilELBC satisfactority eifect should confirm compteted.

design basis assumptions remain valid.

171, Item I.14 Classification of 11-020 & Closed-Action C,1 certain lines as11-021 satisfactorily moderate energy lines completed.

alters hazards evaluation where lines traverse.

2-10 m -

e,

..c,

. _ _. _ -. ~ _ _ _ _

. ~_.

TABLEI MILLSTONE UNIT 3 TECilNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.O.

Action Number Subject Item No. Status Code 171, item I.16 Ilazard report systems11-004 Closed - NEAM revised C,1 interaction tables have not identified all CAT I systems contained in NETM-74.

~

f 172, item i Flooding analysis does P-015 Closed-Action C,3 not identify the means satisfactorily l

available to terminate completed.

piping failures for flood mitigation-flazard Report.

\\

172, item 2 Use of appropriate flow P-016 Closed - Calculations C,3 coef ficient for flow revised.

under doors should be evaluated.

I 172, Item 3 Flooding analyses do not P-017 Closed-Action C,3 i

address flooding sources satisfactorily originating from the floor completed.

drainage system.

172, Item 4 Fluid discharge rate used P-014 Closed - Flooding calc.

C,3 in calc. inconsistent with revised.

guidance of SRP 3.6.1.

2-11 l

t

-, ~ -

,.-..,,a

-. -,..,. - -. ~, -

r TA13LE I MILLSTONE UNIT 3 TECilNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.o.

Action Number Subject Item No. Status Code 172, item 5 Moderate energy pipe Il-005 Closed-Action C,1 crack criterion used

- satisfactorily for all piping systems complete.

may not be limiting t

l for high energy subcooled liquid systems.

l Action items Resulting from Environmental Qualification Follow-Up Minor discrepancies in E-043 Closed-Action C,3 SCEW sheets. Values Rev.I satisfactorily differ from Test Reports.

omplete.

l Minor discrepancies E-045' Closed-Action C,3 i

Project EQ Checklists.

satisfactorily complete.

Error shif t (LOCA) of E-047 Closed - Action C,3 3RCS*PT403 input to satisfactorily Westinghouse setpoint completed.

calculations.

i 2-12

TABLE 1 HILLSTONE UNIT 3 TECilNICAL AUDIT AUDIT NO. 59 AUDIT OBSERVATION (AO) STATUS A.0 Action Number Subject item No.

Status Code Action Items Resulting from Environmental Qualification Follow-up Discrepancies in the low E-048 Closed-Action C,3 voltage splicing materials satisfactorily (type WSCF-N) noted in completed.

SCEW sheets differing from the EQ reports were noted.

Sealing and potting of E-049 Closed-Action C,3 3RCS*TE4/3C was not satisfactorily demonstrated.

(This completed.

action item was generated after issue of Reference 2.)

Cod s:

C = Closed subsequent to issue of Corrective Action Status Report dated November 1, 1985.

(Reference 3) 1 = Hazards Program Related 2 = liigh Priority 3 = Others l

l l

2-13 i

1