B11906, Forwards Engineering Assurance Corrective Action Status Rept, Updating 851101 Rept Re Corrective Actions Resulting from S&W Technical Plant Audit.All Open Audit Items Considered Closed

From kanterella
(Redirected from ML20138D827)
Jump to navigation Jump to search
Forwards Engineering Assurance Corrective Action Status Rept, Updating 851101 Rept Re Corrective Actions Resulting from S&W Technical Plant Audit.All Open Audit Items Considered Closed
ML20138D827
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/03/1985
From: Mroczka E, Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20138D833 List:
References
B11906, NUDOCS 8512130309
Download: ML20138D827 (3)


Text

e NORTHEAST UTILITIES cenerei Ome... seicen street. Bernn, connecticut 14 mcweuc,, o we c.owa=

1

.ina see ns eac=c cowu.-

P.O. BOX 270

.<x.o s..ria ac <a ccw-HARTFORD, CONNECTICUT 06141-0270 J *,c,[', [*,*,' ","*0'$'*,

(203) 665-5000 L

L December 3,1985 Docket No. 50-423 B 11906 Mr. J. Milhoan Chief of Licensing Quality Assurance Branch U.S. Nuclear Regulatory Commission Inspection and Enforcement Mail Stop EWS-305B Washington, D.C. 20555

References:

(1) Engineering Assurance Tecnnical Audit Report, Millstone Unit No. 3 Project, Audit No. 59, dated August 16, 1985; including Errata, dated August 22, 1985.

(2) Engineering Assurance Corrective Action Status Report, Millstone Unit No. 3 Project, dated November 1,1985.

Enclosure:

(1) Engineering Assurance Corrective Action Status Report, Millstone Unit No. 3 Project, dated November 18, 1985.

Dear Mr. Milhoan:

Millstone Nuclear Power Station, Unit No. 3 Design Verification Activities Enclosure (1) provides the final report on corrective actions resulting from the Stone & Webster Engineering Corporation, Engineering Assurance (EA) Technical Audit of Millstone Unit No. 3 as reported in Reference (1). Enclosure (1) is an update to the Corrective Action Status Report issued November 1, 1985 (Reference (2)).

Forty-nine (49) audit items were open at the time Reference (2) was submitted.

The actions required to resolve these items have been completed and verified by the EA audit team.

All items resulting from the. EA Technical Audit are considered closed.

\\

g2gggg$%8,ljia p

P

.J

m

. Five (5) copies of Enclosure (1) have been sent under separate cover to Mr. T. DelGaizo of WESTEC Services.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY et. al.

BY NORTHEAST NUCLEAR ENERGY COMPANY Their Agent I F Owen J. F. Opeka Senior Vice President

/L Vice PrlesidentE. ( Mroczkag By:

B. 3. Youngblood, NRC Licensing Branch Chief cc:

T. A. Rebelowski, NRC Senior Resident Inspector E. C. McCabe, Chief, Reactor Projects Section 3B, NRC-Region 1 STATE OF CONNECTICUT )

) ss. Berlin COUNTY OF HARTFORD

)

Then personally appeared before me E. 3. Mroczka, who being duly sworn, did state that he is Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Licensees herein and that the statements containe d in said information are true and correct to the best of his knowledge and belief.

7M.

Not'ary Public

/

My Comm!:3ica Exp'res f.krefi 3019M