ML20138D655

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/93-02 & 50-423/93-02 on 930111- 15.No Violations Noted
ML20138D655
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/11/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20138D659 List:
References
NUDOCS 9302230031
Download: ML20138D655 (2)


See also: IR 05000245/1993002

Text

-.

.. ..

_

.

6

FEB 111993

Docket No.

50-245

50423

hir. John F. Opeka

i

Executive Vice President Nuclear

Northeast Nuclear Energy Company

P. O. Box 270

Hartford, Connecticut 06141-0270

Dear hir Opeka:

SUBJECT: COhiBINED INSPECTION REPORT NOS. 50-245/93-02 AND 50-423/93 02

This refers to the safety inspection conducted by Mr. R. .A. McBrearty of this office on

January 11 - 15, 1993, at the Millstone Nuclear Power Station, ~Waterford, Connecticut. The

results of the inspection were discussed with Mr. C. Clement and others of your staff at the

conclusion of the inspection.

Areas of the inservice inspection (ISI) program including procedures, documentation and

recent changes examined during this inspection are described in the NRC Region I Inspection

Report, which is enclosed with this letter. Within these areas, the inspection consisted of

selective examinations of representative records and interviews with personnel.

Within the scope of this inspection, we concluded that the areas of the ISI program examined

during this inspection are being conducted in accordance with requirements and no violations

were observed.

We noted you initiated prompt, extensive, and decisive action regarding NRC concerns

identified during a previous inspection at hiillstone Unit 1 in regard to training of NDE

contractors on NDE procedures and the data sheet review process. We feel that those

actions will enhance and strengthen the inwuice inspection program at each of the Northeast

Utilities nuclear facilities.

A reply to this letter is required. Your cocoeratien with us in this matter is appreciated.

Sincerely,

0 t ens tw, u h s

m eto 7. Ex -

9302230031 930211

Jacque P. Durr, Chief

'

PDR

ADOCK 05000245

Engineering Branch

G

PDR

Division of Reactor Safety

3

Enclosure: Combined Inspection Report Nos. 50-245/93-02 and 50-423/93-02

l

i :..

0

FEB 111993

,

'

hir., John F. Opeka

2

cc w/cael:

W. D. Romberg, Vice President - Nuclear, Operations Services

,

S. E. Scace, Vice President, Millstone Nuclear Power Station

C. H. Clement, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licer-inc,

'

D. O. Nordquist, Director of Quality temw:-

. Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

K. Abraham, PAO,(2)

Public Document R6om (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut SLO

bec w/ encl:

Region I Docket Room (with concurrences)

DRS/EB SALP Coordinator

R Blough, DRP

L. Doerflein, DRP

W. Raymond, SRI, Haddam Neck

P. Swetland, SRI, Millstone

V. McCree, OEDO

V. Rooney, PM, NRR

R. Barkley, DRP

.

._

RI:DRS

RI:DRS

RI:DRS

Gra

Durr

McBrearty

(( fi,%

t{ y

2/fr/93

2/ /93

2////93

OFFICIAL RECORD COPY

A: MIL 93-02/RM

-

-

_

_

-.