ML20138D638

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-317/92-32 & 50-318/92-32 on 921130- 1203.No Violations Noted
ML20138D638
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/11/1993
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Stoiber C
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20138D640 List:
References
NUDOCS 9302230026
Download: ML20138D638 (3)


See also: IR 05000317/1992032

Text

w

v

+

FEB 111993

Docket Nos. 50-317

50-318

Mr. Carlton Stoiber

Vice President - Nuclear Energy

Baltimore Gas and Electric Company

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, Maryland 20657 - 4702

Dear Mr. Stoiber:

SUBJECT: INSPECTION REPORT NOS. 50-317/92-32 and 50-318/92-32

This letter refers to the safety inspection of enginaring and technical support activities

related to the Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2, conducted by

Mr. A. Lohmeier of this of6ce during the period November 30 - December 3,1992 at-

Lusby, Maryland. At the conclusion of the inspection, findings were discussed with

members of the Calvert Cliffs engineering staff.

The scope of this inspection included the assessment of engineering organization personnel

changes, design engineering and plant engineering performance, fatigue cycle monitoring

program, emergency diesel generator anti-missile door bolting adequacy, POSRC activity,

i

modiGcation package review, welding program control, and the 10 CFR 50.59 screening

process.

Engineering activity at Calvert Cliffs continues to improve through good management

r

l

oversight of engineering operations utilizing target goals and performance measurement

l

against these goals. The effectiveness has the potential to be further enhanced through recent

changes in management through cross switching of engineering management assigmrants.

It was noted that the fatigue cycle monitoring program at Calvert Cliffs has been developed -

l

toward providing assurance that fatigue life usage of primary system components has not

exceeded the limits provided for in the ASME Boiler and Pressure Vessel Code for Nuclear

Vessels - Section III. Plant operation within the fatigue capability of component materi Js is

essential for the safe and efficient generat on of nuclear power.

i

l

!

l

9302230026 930211

PDR

ADOCK 05000317

O

PDR

pI

I

fV

.

-

.

.

..

-

4

FEB 111993

- Mr. Carlton Stoiber-

_

21

It was noted that the bolting on the emergency diesel generator doors was not installed in a

workmanship-like manner consistent with nuclear. plant construction. You should determine

the adequacy of the installation and initiate any necessary corrective actions.

o

Within the scope of this inspection, no violations were observed. No response to this letter-

is necessary.

Sincerely,

0. !e.inal sis.wih t

h.e rw r., hrr.

4

Jacque P. Durr, Chief

,

Engineering Branch

Division of Reactor Safety

,

Enclosure:

NRC Region I Inspection Report Nos. 50-317/92-32 and 50-318/92-32

cc w/ encl:

,

G. Detter, Director, Nuclear Regulatory Matters (CCNPP)

j

R. McLean, Administrator, Nuclear Evaluations

l"

J. Walter, Engineering Division, Public Service Commission of Maryland

K. Burger, Esquire, Maryland People's Counsel -

R. Ochs, Maryland Safe Energy Co:lition

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

bec w/ encl:

Region I Docket Room (with concurrences)

l

C. Cowgill, DRP

J. Yerokun, DRP -

L. Nicholson, DRP

j

P.: Wilson, SRI - Calvert Cliffs

V. McCree, OEDO

R. Capra, NRR

D. Mcdonald, NRR

DRS/EB SALP Coordinator

J. Strosnider, .NRR

l

R. Kirkwood, RES

R. Parkhill, NRR

l

L

l

i-

i

t

,

. . .

..

. .

.

. . . .

. .

.

. . . . . . .

.

. . . . . . . . . . .

.

.

. . . . . . .

, --

' FEB 11l1993:

.

Mr. Carlton Stoiber

3-

-

_-

-

>)

.

.4

=

'

---

--

._

_ . _ _

.)

dP

RI:DRS

RI:DRS

RI:DRS

Lo, *r

Gray

Durr

'

(th -

1 1/93

1/d/93

2//f/93

OFFICIAL RECORD COPY

A:CC9232.AL

. .. - . . . . .. ..

. .

..

.

..

.

--

-

'