Text
..
a
l
FEB 101993
Docket Nos. 50-334
50-412
Mr. J. D. Sieber
Senior Vice President
Chief Nuclear Officer
Duquesne Light Company
Post Office Box 4
Shippingport, Pennsylvania 15077
Dear Mr. Sieber:
SUBJECT: Combined Inspection Report Nos. 50-334/92-28 and 50-412/92-27
This letter transmits the report of the inspection conducted by Mr. R. Paolino of this office
on December 15-18,1992 at the Beaver Valley Power Station, Units 1 and 2 in
Shippingport, Pennsylvania. Mr. Paolino discussed the findings of the inspection with senior
staff members of Duquesne Light Company, on December 18, 1992.
The purpose of the inspection was to assess the adequacy of the engineering and technical
support provided for the operation of .ne Beaver Valley Power Station. Within these areas,
the inspection focused on issues important to public health and safety, and consisted of
selective examinations of relevant procedures, representative records, plant design changes,
modifications, and observations by the inspector. Areas inspected are discussed in the
enclosed report.
The inspector concluded that overall engineering and technical support to the plant was of
good quality and was adequate to support plant operations. Supervisory staff additions in the
electrical and instrument / control group areas of corporate engineering staff appeared to have
enhanced the design control process and support to plant operations.
Within the scope of this inspection, no violations were identified.
930223o022 930210
DR
ADOCK 0500
4
d
i
,
FEB 101993
Mr. J. D. Sieber
2
No reply to this letter is required. Your cooperation with us in this matter is appreciated.
Sincerely,
ofigi e.1 si c:3.1 By t'
Jec que P. N2T.
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure: Combined Inspection Report Nos. 50-334/92-28 and 50-412/92-27
cc w/ encl:
G. S. Thomas, Vice President, Nuclear Services
N. R. Tonet, Manager, Nuclear Safety
T. P. Noonan, General Manager, Nuclear Operations
K. D. Grada, Manager, Quality Service Unit
i
H. R. Caldwell, General Superintendent, Nuclear Operations
K. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
,
NRC Resident Inspecar
'
Commonwealth of Pennsylvania
State of Ohio
bec w/ encl:
Region 1 Docket Room (with concurrences)
DRS/EB SALP Coordinator
J. Linville, DRP
W. Lazarus, DRP
L. Rossbach, SRI - Beaver Valley
SRI, Perry, Region III
W. Butler, NRR
G. Edison, NRR
V. McCree, OEDO
.
FEB 101993
p.
Mr. J. D. Sieber
3
!
El: RS
RI:DRS
RI:DRS
P.
R
Durr
-
,
1/4f93
2/1/93
2fC/93
OFFICIAL RECORD COPY