ML20138D323

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Application for Renewal of Certificate of Compliance 5492 for Model RMG-181-I Package
ML20138D323
Person / Time
Site: 07105492
Issue date: 02/12/1993
From: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Maxin A
NUCLEAR FUEL SERVICES, INC.
References
NUDOCS 9302170263
Download: ML20138D323 (3)


Text

- - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

s -

, .- S

  • - IMTB:MGB FEB 121993 71-5492

,1 Nuclear Fuel Services, Inc.

ATTN: Mr. Andrew M. Maxin:

P. O. Box 337, MS 123 Erwin, TN 37650

Dear Mr. Maxin:

This refers to your application dated December 8,1992, requesting renewal of Certificate of Compliance No. 5492 for the Model No. RMG-181-1 package. Since an application was subniitted at least 30 days prior to the expiration of the -_

Certificate of Compl'ance, the Certificate of Compliance will not.be deemed to have expired until the application ha; finally been determined.

In connection with our review, we need the information identified in the enclosure to this letter.

This information should be provided within 60 days from the date of this latter. Additional information requested by this letter should be submitted in the form of revised pages. If you have any questions regarding this matter, we would be pleased to meet with you and your staff. Ms. Marissa- #

Bailey is the project manager for our review of your application. Ms. Bailey-may be contacted at (301) 504-2181.

Sincerely, nM B; Charles E. MacDonald, Chief Transportation Branch Division 'of Industrial and Medical Nuclear Safety, NMSS

Enclosure:

As stated 1

D_i stribution:

NRC FC NMSS r/f NRC PDR IMTB r/f f 0FC IMTBM4B E IMTB M E IMTB 4 IMTB- C IMTB,, . /V IMTB NAME MGBailey NL0sgood ERZM[eI C p(11 CEkd(nald (DATE 2 / 9 /93 _j / [C /93 2 / 7 /93 f,////93 J //p /93 / /93 C = Cover E = Cover & Enclosure H = No Copy 0FFICIAL RECORD COPY

~

9302UO263 930212 f PDR ADOCK 07105492 C PDR .w;m g/vspy

. (( ,j'hy,, ($Cdd & ! g bW h

_ _ 1

e 71-5492 FEB 121993 Encl. to ltr. dtd.:

General Certificate of Compliance No. 5492 is designated as a Type AF package; however, the amount of radioactive material per package can exceed a Type-A quantity. Either limit the radioactive material per package to a Type A :

quantity, or submit an application which shows that the package meets the requirements of 10 CFR " rt 71 for a Type B(V)F package.

The-application for a Type B(U)F package must be complete it itself and in the format of Regulatory Guide 7.9. _ Include engineering. drawings of the package design, a complete description of the contents and materials of construction, operating procedures, acceptance tests, and a maintenance program. Show that-the package meets the cor.tainment provisions of 10 CFR 971.51, and discuss the leak tests that will be performed prior to each shipment and at periodic intervals. Also, show that the materials used to fabricate the centainment vessel have adequate fracture toughness.

Drawinos Revise Nuclear Fuel Services, Inc., Drawing No. RMG :.4-1, dated November 22, 1982, to include the following information:

a. dimensions, material specifications, and applicable codes and standards for the outer drum and inner container -
b. density of the vermiculite
c. location of the~ tamper-proof _ feature
d. maximum weight of a loaded and empty package-Criticality It appears that the. criticality analysis presented in consolidated application dated August 25, 1982, as supplemented December 10,-1982,-did not consider the-most reactive fuel loading, optimum water in-leakage, and optimum interspersed moderation. Show that under optimum fuel loading and moderating conditions, the K for thr arra.y of-packages does not' exceed 0.95 (ircluding bias and-uncerYa'inty). The NPC staff's analysis indi:ates that the array of. packages may not be sufficiently subcritical under optimum conditions.

c

~

1 0  ?

71-5492 Operatina Procedures. Acceptance Tests, and Maintenance Procram

1. Revise the operating procedures to include application of a tamper-proof-device prior to shipment.  ;
2. Revise the maintenance program to include periodic testing and inspection of the packaging. Include periodic inspection of the vermiculite for moisture, voids, and movement. State the acceptance criteria for each test and inspection, and the action to be taken if noncompliance is encountered.

t

&