Ack Receipt of Transmitting Rev 23 to Physical Security & Contingency Plan.Changes Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan
ML20138D226
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/05/1993
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
References
NUDOCS 9302160154
Download: ML20138D226 (3)


Text

-

i r

y 1

9 TD

' S Dda L

[

Docket Nos.- 50-424, 50-425 l

License Nos. NPF-68, NPF-81 Georgia Power Company l

ATTN:

Mr.-W. G. Hairston, III-L Senior Vice President Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 l:

Gentlemen:

SUBJECT:

DOCKET NOS. 50-424 AND 50-425 This acknowledges the receipt of your letter of January 5,1993, which l

transmitted Revision 23 to the Vogtle Physical Security and Contingency Plan, i-L Our' review of the changes has found them to be consistent with the provisions

(

of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the-l plan.

The enclosure to your letter is being withheld from public disclosure because-it contains Safeguards-Information and must be protected in accordance'with the provisions of 10 CFR Part-73.21.

Should you have any-questions concerning this letter, we will be glad to-discuss them with you, i

Sincerely,

$Ap'ar&

b.

ll tz,L f

ggJ'atk L

, h Douglas M. Collins, Chief Nuclear Materials -Safety and Safeguards Branch Division of Radiation. Safety and Safeguardt L

cc:

R. P. Mcdonald Executive Vice President Nuclear' Operations Georgia Power Company P. O. Box 1295 Birmingham, AL 35201-(cc cont'd - See page 2) 9302160154 #362'05

^^

hl I F

PDR-J h.

PDR ADOCK 05000424 n

, Georgia Power Company 2

FEB 5 H233 (cc cont'd)

C. A. McCoy Vice President-Nuclear Georgia Power Company P. O. Cax 1295 Birmingham, AL 35201 W. B. Shipman General Manager, Nuclear Operations Georgia Power Company P. O. Box 1600 Waynesboro, GA 30830 J. A. Bailey Manager-l.icensing Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 Nancy G. Cowles, Counsel Office of the Consumer's Utility Council 84 Peachtree Street, NW, Suite 201 Atlanta, GA 30303-2318 Office of Planning and Budget Room 6158 270 Washington Street, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 (cc cont'd - See page 3) h%

e j

.Seorgia Power Company 3

FEB 5 1993 (cc cont'd)

Dan H. Smith Vice President Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW Washington, D. C.

20036 bec: S. Sparks, RII

0. Hood, NRR P. Skinner, Rll A. Herdt, Rll S. Vias, Ril NRC Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 572 Waynesboro, GA 30830 Document Control Desk (RG01), 42-P Chief, Safeguards Branch, NRR, 90-24 Region 11 Licensing File, (50-424) (50-425), TAB 2 RII 0RSS RI! DESS RI SS Rll f

kDibiK:JC T

lh)

CG IRE SKINNER 02/ /93 fg02/6^/93 02/(/93 02/4 /93

_