OPERATING DATA REPORT 50-348 DOCKET NO.
DATE 10 8 ')
COMPLETED BY J.D.Woodard TELEPHONE ons3noo_sl56 OPERATING STATUS Ol'8 I. Unit Name: Joseph M. Fa rl ev l'nft 1
- 2. Reportug Period Sentember. 1985 12-1-77, date of 2652
- 3. I le===d Thermal Power (MWt):
consnercial operation.
860
- 4. Nameplate Rating (Gross MWe):
- 5. Demen Electrical Rating (Net MWe):
A 9
- 6. Maximum Dependable Capacity (Gross MWe):
860 9 816.5
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A N/A
- 10. Reasons For Restrictions,if Any:
This Month Yr..to Dete Cumulative
- 11. Hours in Reporting Period 720 6.551 68,663
- 12. Number Of Hours Reactor Was Critical 720.0 5,295.1 47,424.I 0.0 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours 120.0 5,172.2 46,196.6
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,671,312 13,207,765 117,108,340
- 17. Gross Electrical Energy Generated (MWH) 617,622 4.299.552 17.191.866
- 18. Net Electrical Eneri;y Generated (MWH) 585,878 4.055,676 35,184,722
- 19. Unit Service Factor 100.0 79.0 67.3
- 20. Unit Availability Factor 100.0 79.0 67.3 99 7 75.8 64.1
- 21. Unit Capacity Factor (Using MDC Net) 98.2 74.7 61.8
- 22. Unit Capacity Factor (Using DER Net) 0.0 2.6 12.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77
[p 8510220101 850930 PDR ADOCK 05000348-
/
gg R
PDR (9/77
._--__._m._
~
DOCXIT NO. 50-348
)
l UNIT I l
DAR In/02/ss J.D.We dard 1
COStPLETED BY
]!
TELEPHONE (70 s) 899-s i s6 l
4 September, 1985 310NT11 DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE Net)
(31We Net) 791 823 g7 i
785 gg 824
~gl 3'
-- - - - ~
g 9.-
822
+
y
~
4 816
- g 82n I
}
a,?
- g a,n 827 819 f
6 g
821 817 7
3 g
817
- 4 656 9
816 25' 817 10 821 26 815 822 826 gg g
l g;
82s
- g 829
.i g3 821
- g 824
]
g4 30 830 8I9 g
I 15 R2s 3g j
826 1
16 1
I INSTRUCDONS On this format. fist the avenge daily unit power levet in MWe Net for each d:y in the reposting anonth. Compute io
, the neare:t whule me;2 watt.
1 (907)
- O i
i
'~
O O
O UN8T $40U1 DOWNS AND POWER REIMN DOCKETNO. 50 348 UfeTNAME J. M. Farley - Unit I DATE 10-2-85 REPORT heONill september. 1985 COMPT.ETED sY T-D W odard TER.LP900NE (205) 899-5156 1
)
e.
'5 5
~
c r.
f g.,
gg, 1
k
]3x eu h
4 Ca# M & Custectivc Ewns y, y 4,, g,,,,
jE{
Rep.ise s g}
g IJ f
p,,,,,,g,g,,,,,c, O-d i
THE (E k'ERE NO UN IT SH JTDOk3S < IR SIC KIFICA.V ? P0k'ER REDUCTI 1NS DID ING THE MO sTH OF SEPTEMBER i
1 t
l L
4 I
2 3
4 F: Fawced Meason:
Method:
Enhatas G. Insasuctions S: SsheduleJ A E.guapemens Fasiuse(Emplaia)
I-Manual for Psepasasi m of Data s.Maissemance W Test 2 Manual Sesam.
Enasy Sheces fos liensee C Ref.achug 3 Ausuematic Scsasa.
Event Rep.w (l.ER) file (NUREG-D Regulasosy Reusicssam 4-Oslees (Emplain) 0108)
E-Operatar Tsaiaing & license Emananasion F Adminausasive 5
j G Opesasi.wiallas.. (Eng.lasa)
Estabia 1 - Same Sinuce rsf77)
Il Othes (E mplain)
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE StMtARY OF OPERATIONS SEPTEMBER, 19f6 i
There were no unit shutdowns or significant power reductions during the month of September.
i The following major safety-related maintenance was performed in the month of September.
1.
Miscellaneous corrective and preventive maintenance was performed on diesel generators.
j I
i s
il
y i
Mamng Address Atboma Power Company 4'
600 North 18th Street Post Office Box 2641 Bermingham, Alabama 35291 J Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Building dlOb3$300WCf re wav nwei s,
October 17, 1985 Docket No. 50-348
. Director, Office of Resource l Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant -
Unit 1 Monthly Operating Data Report Attached are two (2) copies of the September 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.
If you have any questions, please advise.
Yours very truly,
&hS R. P. Mcdonald RPM /SNK:nac/F-2 Enclosures xc: Director, IE (10 copies)