Monthly Operating Rept for Sept 1985
ML20138B964
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/30/1985
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8510220101
Download: ML20138B964 (5)


Text

'

OPERATING DATA REPORT 50-348 DOCKET NO.

DATE 10 8 ')

COMPLETED BY J.D.Woodard TELEPHONE ons3noo_sl56 OPERATING STATUS Ol'8 I. Unit Name: Joseph M. Fa rl ev l'nft 1

2. Reportug Period Sentember. 1985 12-1-77, date of 2652
3. I le===d Thermal Power (MWt):

consnercial operation.

860

4. Nameplate Rating (Gross MWe):
5. Demen Electrical Rating (Net MWe):

A 9

6. Maximum Dependable Capacity (Gross MWe):

860 9 816.5

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted. lf Any (Net MWe):

N/A N/A

10. Reasons For Restrictions,if Any:

This Month Yr..to Dete Cumulative

11. Hours in Reporting Period 720 6.551 68,663
12. Number Of Hours Reactor Was Critical 720.0 5,295.1 47,424.I 0.0 0.0 3,650.0
13. Reactor Reserve Shutdown Hours 120.0 5,172.2 46,196.6
14. Hours Generator On.Line
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,671,312 13,207,765 117,108,340
17. Gross Electrical Energy Generated (MWH) 617,622 4.299.552 17.191.866
18. Net Electrical Eneri;y Generated (MWH) 585,878 4.055,676 35,184,722
19. Unit Service Factor 100.0 79.0 67.3
20. Unit Availability Factor 100.0 79.0 67.3 99 7 75.8 64.1
21. Unit Capacity Factor (Using MDC Net) 98.2 74.7 61.8
22. Unit Capacity Factor (Using DER Net) 0.0 2.6 12.1
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status iPrior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77

[p 8510220101 850930 PDR ADOCK 05000348-

/

gg R

PDR (9/77

._--__._m._

~

DOCXIT NO. 50-348

)

l UNIT I l

DAR In/02/ss J.D.We dard 1

COStPLETED BY

]!

TELEPHONE (70 s) 899-s i s6 l

4 September, 1985 310NT11 DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (SIWE Net)

(31We Net) 791 823 g7 i

785 gg 824

~gl 3'

-- - - - ~

g 9.-

822

+

y

~

4 816

g 82n I

}

a,?

g a,n 827 819 f

6 g

821 817 7

3 g

817

4 656 9

816 25' 817 10 821 26 815 822 826 gg g

l g;

82s

g 829

.i g3 821

g 824

]

g4 30 830 8I9 g

I 15 R2s 3g j

826 1

16 1

I INSTRUCDONS On this format. fist the avenge daily unit power levet in MWe Net for each d:y in the reposting anonth. Compute io

, the neare:t whule me;2 watt.

1 (907)

O i

i

'~

O O

O UN8T $40U1 DOWNS AND POWER REIMN DOCKETNO. 50 348 UfeTNAME J. M. Farley - Unit I DATE 10-2-85 REPORT heONill september. 1985 COMPT.ETED sY T-D W odard TER.LP900NE (205) 899-5156 1

)

e.

'5 5

~

c r.

f g.,

gg, 1

k

]3x eu h

4 Ca# M & Custectivc Ewns y, y 4,, g,,,,

jE{

Rep.ise s g}

g IJ f

p,,,,,,g,g,,,,,c, O-d i

THE (E k'ERE NO UN IT SH JTDOk3S < IR SIC KIFICA.V ? P0k'ER REDUCTI 1NS DID ING THE MO sTH OF SEPTEMBER i

1 t

l L

4 I

2 3

4 F: Fawced Meason:

Method:

Enhatas G. Insasuctions S: SsheduleJ A E.guapemens Fasiuse(Emplaia)

I-Manual for Psepasasi m of Data s.Maissemance W Test 2 Manual Sesam.

Enasy Sheces fos liensee C Ref.achug 3 Ausuematic Scsasa.

Event Rep.w (l.ER) file (NUREG-D Regulasosy Reusicssam 4-Oslees (Emplain) 0108)

E-Operatar Tsaiaing & license Emananasion F Adminausasive 5

j G Opesasi.wiallas.. (Eng.lasa)

Estabia 1 - Same Sinuce rsf77)

Il Othes (E mplain)

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE StMtARY OF OPERATIONS SEPTEMBER, 19f6 i

There were no unit shutdowns or significant power reductions during the month of September.

i The following major safety-related maintenance was performed in the month of September.

1.

Miscellaneous corrective and preventive maintenance was performed on diesel generators.

j I

i s

il

y i

Mamng Address Atboma Power Company 4'

600 North 18th Street Post Office Box 2641 Bermingham, Alabama 35291 J Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Building dlOb3$300WCf re wav nwei s,

October 17, 1985 Docket No. 50-348

. Director, Office of Resource l Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant -

Unit 1 Monthly Operating Data Report Attached are two (2) copies of the September 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.

If you have any questions, please advise.

Yours very truly,

&hS R. P. Mcdonald RPM /SNK:nac/F-2 Enclosures xc: Director, IE (10 copies)