B ALTIMORE GAS AND ELECTRIC CHARLES CENTER R O. BOX 1475 BALTIMORE, MARYLAND 21203 JostpH A.TICRNAN Vict PassioEN(
NUCLEAm ENERGY March 24,1986 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C. 20555 ATTENTIDN:
Mr. Ashok C. Thadani, Director PWR Project Directorate #8 Division of PWR Licensing-B
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & $0-318 Generic Letter 83-28, items 3.1.3 and 3.2.3, Post-Maintenance Testing
REFERENCES:
(a)
Letter from Mr. D. G. Eisenhut, to All Licensees dated July 8,1983,
" Required Actions Based on Generic Implications of Salem ATWS Events" (b)
Letter from Mr. A. E. Lundvall, Jr., to Mr. D. G. Eisenhut dated February 29,1984, same subject as Reference (a)
Gentlemen:
In response to Reference (a), the Baltimore Gas and Electric Company submitted Reference (b) which addressed items 3.1.3 and 3.2.3 regarding post-maintenance testing. As a result of the telephone conversation held on January 28, 1986, with Messrs. Dave Jaffe and Don Lasher of your staff, we realized that we misinterpreted the intent of items 3.1.3 and i
3.2.3 of Reference (a). Subsequently, we agreed to review existing Technical Specifications and identify, if applicable, any post-maintenance test requirements which can be demonstrated to degrade rather than enhance safety.
We have completed our review of existing Technical Specifications and identified those that require post-maintenance testing (see Attachment). None of the identified testing require-ments, that have not already been addressed in previous license amendment submittals, have been perceived to degrade rather than enhance sarety. Therefore, we consider no further action to be necessary regarding these items of Generic Letter 83-28.
i i
8603250230 860324 y
i PDR ADOCK 05000317 IU l 1
P PDR i
Mr. A. C. Thadani March 21,1986 Page 2 Should you have further questions regarding this reply,~ we would be pleased to discuss them with you.
Very truly yours 6M JAT/SRC/ dim Attachment cc: _ D. A. Brune, Esquire
- 3. E. Silberg, Esquire D. H. Jaffe, NRC T. Foley, NRC l
J
~
0 ATTACHMENT i
POST-MAINTENANCE TESTING SURVEILLANCE REQUIREMENT NO.
SUBJECT 4.1.3.4.b CEA Drop Time 4.5.2.g.2 ECCS Operability 4.5.2.h ECCS Operability 4.6.3.1.b Iodine Removal System 4.6.3.1.g Iodine Removal System 4.6.4.1.1 Containment Isolation Valves 4.6.6.1.b Pen. Room Exhaust Air Filtration 4.6.6.1.g Pen. Room Exhaust Air Filtration 4.7.6.1.c Control Room Emergency Ventilation 4.7.7.1.b ECCS Pump Room Exhaust Air Filtration 4.7.7.1.g ECCS Pump Room Exhaust Air Filtration i
4.7.11.3.e Halon Systems 4.7.12.b Penetration Fire Barriers 4.9.12.b Spent Fuel Pool Ventilation 4.9.12.g Spent Fuel Pool Ventilation 4