Monthly Operating Rept for Sept 1985
ML20138B580
Person / Time
Site: Maine Yankee
Issue date: 09/30/1985
From: Embry K, Whittier G
Maine Yankee
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
652OL-AJP, GDW-85-257, MN-85-175, NUDOCS 8512120337
Download: ML20138B580 (5)


Text

_ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ - _ _ _

DocIet Ne. 50-709 Unit Maine YanEce Date 051004 OPERATING DATA REPORT Completed De M.L. Embry Telephone 207-902-6321 l

l 1. Unit Name................. Maine Yankee j 2. R2 porting Period.......... September, 1985 l

3. Licenued Thermal Power (MWt)............. 2600
4. Nemeplate Rating (Gross MWe)............. 864 l 5. Dacign Electrical Rating (Net MWe)....... 025 i
6. Maximum Dependable Capacity (Gross MWo).. 050
7. Maximum Dependable Capacity (Not NWo).... 810
9. If Changes Occur in Capacity Ratings-(Items Number 3-7)

Since Last Report, Give Reasons:.....

9. Power Lcvel to Which Rostrictod, If Any (Not MWo) ____________________

l 10. Reasons for Restrictions, If Any......

  • l THIS MONTH YR.-TO-DATE CUMULATIVE ,
11. Hours in Reporting Period 720 6,551.00
12. Number of Hours Reactor Was Critical 0.00 5,400.01 90,708.55 1". Reactor Reserve Shutdown l Hours 0.00 0.00 0.00
14. Hours Generator On-Line 0.00 5,579.47 08,009.17 i
10. Unit Reserve Shutdown '

Hourn 0.00 0.00 0.00

16. Gross Thermal Energy Generated (MWH) 0.00 13,045,792.00 199,054,706.00 i
17. Gross Electrical Energy Generated (MWH) 0.00 4,030,600.00 65,003,910.00
18. Net Electrical Energy  !

Generated (MWH) 0.00 4,174,921.00 62,006.013.00

19. Unit Service Factor 0.00 02.12 77.94
20. Unit Availability Factor 0.00 02.12 78.76 l 21. Unit Capacity Factor (Using MDC Net) 0.00 70.60 69.60
22. Unit Capacity Factor (using DER Net) 0.00 77.25 67.75
20. Unit Forced Outage Rate 0.00 0.94 6.90 24 Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration):

An eight week refueling shutdown started August 17, 1985.

25. If Shutdown at End of Report Period, Estimated Date of Startup October 14, 1905
26. Units in Test Status (Prior to Commercial Operation):

For ecar,t Achieved Initial Criticality ________ ________

Initin! C1ectricity ________ ________

Commercial Operation ________ ________

G512120337 950930 l PDH ADOCK 05000309 4 e g 'l-]

N PDH lll

1 AVERAGE DAILY UNIT POWER LEVEL  :

Doci.ct No. 50-309 ,

l Unit Maine Yankcq l Qalg 051004 ,

Completed By K.L. Embry Telephone 207-882-6321 i

MONTH September, 1985 i

Day Average Daily Power Level Day Average Daily Power Level (MWe-Net) (MWe-Net) 1 ...................... 0 16...................... 0 2....................... 0 17...................... O r 3....................... 0 18...................... O .

4.....'.................. 0 19...................... 0 t 5....................... 0 20...................... 0 .

6....................... 0 21...................... 0 7....................... 0 22...................... O B....................... 0 20...................... 0 9....................... 0 24...................... O  ;

10...................... 0 25...................... 0  :

I 11...................... 0 26...................... 0 12...................... 0 27...................... 0

  • 13...................... 0 28...................... O L

{

14...................... 0 29...................... O 15...................... 0 30...................... O

{

i

+

I h

UNIT SHUTDOWNS AND F OWER RCDUCllONS Docket No. $n~;n2 Unit rian_ne ypnjfo j l Date QSEKt4 l Completed By !kk, Embr.y.

I Telephone 207-QQO-6321 Report Month gep_tf_mttog_ L?(g l

No. I 4-05-0 1 I

______________!_____________________l____________________l___________-________

i  ! i Date I 050816 1 1

______________!_____________________!____________________I____________________ i I  ! I i Typo (1) 1 G I 1

______________!_____________________!____________________I________________.___

i  ! i r Duration (Hrs)I 720 1 1 ,

l ______________I_____________________!____________________!_______________I____!

l  ! I I l Reason (2) i C I  !

l ________._____!_____________________I______________- ____!____________________

l 1 1 I Nethod(0) i 1 i i

______________!_____________________l_______..____________l.___________________

! l I i LER # 1 N/A i 1 l ______________!_____________________l.___________________l____________________

l  !  !

System Code (4) ZZ l I i i t i I I Component  ! ZZZZZZ l I Code (5)  ! I I l

______________I_____________________I____________________I____________________ ,

I I i 1 Scheduled unit i  !

I shutdown for Core I  !

! O/9 refueling.  !  !

I I I Cause and i I I Corrective I I i Action  !  !  !

I l  ! >

l  ! I i  ! I 1 1 1 I I I I i 1 ,

                                                                                                                                                            • s
1. F: Forced 2. Reason: 3.Mothod S: Scheduling A-Equipment Failuro 1-Nanual D-Maintenanco or Toct 2-Nanual Geram C-Rofueling 3-nutomatic Scram
4. Exhibit G-Instructions D-Rooulatory Restriction 4-Othor (CHplain) for Preparation of Data E-Operator Training 24 Entry Shoots for Licenso Enamination Liconnea Event Roport F-Administrativo 5. Exhibit l_

(LER) File (NUREG.Ol61) G-Ooorational Ceror bemo Sourco

i Daci:et No. 50-309 l Unit tjel ne_ yjnt c:e  ;

D.ste Q01004~

Completed by th,Lt Cstri Telephonu 207_rPO2-632_1 f Report Month Septembez,1905

  • l

SUMMARY

QE QfERATINQ EXPERIENCFS >

l The plant was shutdown at the beginning of the month for the core 0/9 refueling shutdown.

The plant was shutdown for the entire month .

Estimated return to power is October 14, 1905.

i i

I t

t i

i-o I

I l

f

?, '

l I i

r t

s I

O e o EDISON DRIVE MAIRE HARHEE ATOMMPOWER00MPARUe suausrx ux,neo<aaa

g. (207) 623-a521 O

October 11, 1985 MN 85-175 GDW-85-257 Office of Resource Marugement United States Nuclear Regulatory Comission Wasnington, D. C. 20555 Attention: Mr. Richard A. Hartfield, 011ef K1nagement Information Oranch

References:

(a) License No. O)R-M (00Cket No. 50-309)

( b) NUREG-0020, Licensed Operating Reactors Status Summary Report

Subject:

Kilne Yankee H rthly Statistical Report Gentlemen:

Enclosed you will find the Winthly Statistical Report for the Kline Yankee Atomic Power Station for September,1985.

Very truly yours, MAINE WXEE ATOMIC POWER COM)ANY AJA AV G. D. Whittler, Manager Nuclear Eryincering & Licensing CDW/Dja Enclosures cc: Mr. Edward J. Butcher, Jr.

Dr. Thomas E. H;rley Mr. Cornelius tblden l l 6520L-AJ)