ML20138B289

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1985
ML20138B289
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 09/30/1985
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
References
NUDOCS 8512120259
Download: ML20138B289 (5)


Text

.

~

^,

d P

A j -

df

  1. - /

J ',

/,#

NAREATIVE

SUMMARY

OF OPERATING EXPERIENCE t

a DOCKET NO.

50-263______

DATE 10- 1-85.___

COMPLETED BY A. L. Myrabo l

/

TELEPHONE 612/295-5151 I

MONTH ______ SEPTEMBER _______

9-1-95 to Power operation.

9-30-85 l

l l

l I

i SPENT FUEL STORAGE UPDATE I

Fuel assen.hLies in core 484 Fuel assemblier in spent fuel storage pool 484 Licensed depacity 2237 Date of,last refueling that can be 2000 l

discharge wIth present capacity.

e 1

f Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specIfIed survelL. lance testing.

i l.

f n512120259 050930 L

ADOCK050g3 ppft C

R e

i i

1 g

3l).

AVERAGE DAILY UNIT POWER LEVEL DOCXET NO.

50-263______

UNIT Monticelto__

DATE 10- 1-85____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ SEPTEMBER _______

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1'

__________540____________

17

__________551____________

2

__________547____________

18

__________549.___________

3

__________546____________

19

__________544____________

4

__________547____________

20

__________546____________

5

__________543____________

21

__________550____________

6

__________545____________

22

__________547____________

7

__________541____________

23

__________548____________

8

__________540____________

24

__________553____________

9

__________546____________

25

__________549____________

10

__________543____________

26

__________554____________

ii

'__________547____________

27

__________549____________

1o

__________549____________

,8

__________55o_____________

13

__________549____________

29

__________548.___________

14

__________551____________

30

__________553____________

15

__________546____________

31 16

__________550____________

INSTRUCTIONS 1

On this format, list the average dally unit power Levet in NWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

/

i g

e OPERATING DATA REPORT DOCKET NO.

50-263______

DATE 10- 1-85 ___

COMPLETED BY A. L. Myrabo

'(

TELEPHONE 612/295-5151 OPERATING STATUS,'

l Notes I

t'.

Unit Name : ________________________Monticalto

^ l l

2. Reporting period: ___________________ SEPTEMBER l

l

3. Licensed Thermal Power (MWt):

____________1470 l

l

4. Nameplate Rating (Gross MWe):

_____________569 l

1

/s

,5.

Design Electrica L Rat ing (Net MWe): _____545.4 l

l

6. Maximum Dependable Capacity (Gross MWe): __564 1-l 75 Maximum Dependable Capacity (Het MWe):

..___536 l__________________________l

8. If Changes Occur in Capacity Ratings (Items. Number 3 Through 7) Since Last Report, Give Reasons:

___________1______________________________________

9. Power Level To Which Restricted, If Any (Net MWe):

___N/A___________*________

10. Reasons For Restrictions, If Any: __N/A_____________________________________

_________e_____________________________________________-___--___--_-----

This Month Yr.-to'-Date Cumulative

11. Hours In Reporting Period-

_____720

_____655i

____124944

12. Number Of Hours Reactor Was Cri t ica l

___720.0

___5973.1

__ 96059.3

13. Reactor Rdserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hourp Genera tor On-Line

___720.0

___5851.3

__ 93838.0

13. Unit Reserve Shutdown Hours

_____0.0

______0.0

__.____0.0

16. Gross Therma L Energy Generated (MWH)

_1200497

_ 9506644

_142301190

17. Gross Electrical Energy Generated (MWH) __410332

__3249123

__48434176

18. Net Electrical Energy Generated (MWH)

__394108

__3116155

__46301208

19. Unit Service Factor

'__100. 0%

___ 89.3%

____ 75.1%

20. Unit Availability Factor

__100.0%

___ 89.3%

____ 75.1%

21. Unit Capacity Factor,(Using MDC Net)

__102.1%

___ 88.7%

____ 69.1%

22. Unit Capacity Factor (Using DER Net)

__100.4%

___ 87.2%

____ 67.9%

23. Unit Forced Outage Rate 0.0%

0.8%

5.0%

(

<1

24. Shutdowns Scheduled _0ver Nex t 12 Months (Type, 'Da te, and Duration of Each) l

__May 10, 1986 - 1986 refueling outage - 41 days _________________________

b

25. If Shut Down At End Of Report Period. Estimated Date Of Startup:____________
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved l

INITIAL CRITICALITY f

J' INITIAL ELECTRICITY COMMERCIAL OPERATION J_______

1 k\\

c F

1-bT

_ =. _ _

l t

b' UNIT SilUIDOWNS AND POWER REDUCI3ONS DOCKET NO.

50-263 UNIT N A*,lE h arfeelin DATE 10-1-85 COMPLETED llY A. L. Myrabo REPORT MONIH Sent==k-r l'

T ELEPHONF. 612/295-sist No

?

r.

u. -

E,9.,

. = ~1e s

sX Le.sensee g-(

E Cause & C..eresine n

55 No.

Date k

3?

4

E'7 f-?

Ats...n su

. Incus

~ C.

5 j f. j Repans

  • E "'"

Psetine Resurren.e d

l None l

l I

L I

l 1

2 3

4 F: Forced Reason.

Method :

Edubis G-Insisuses ms 5: SchedulcJ A Equipment FailureIEsplaml 14tanual l'or Pseparati. n i.I~ Data Bataintenance of Test 2-Manual Sesam.

Ents) Sheets for lxensee C. Refueling

3. Autonusic Sstam.

Esen Rep.us LI RI File:NURLG-D-Regulator) Restristion 4-Other IE splaini 0161I E-Operator Training & Li enw Eumination i

F-AJnunistrative 5

l G Operational Esnor IEsplaml Estubs I - Sanw Source l'8!77) 11Other IEsplaint

O.

Northem States Power Company 414 Nicollet Mail Minr.eapons. Minnesota 55401 Telephone (612) 330-5500 October 9, 1985 Direc ar, Office of Resource Management U S Nuclear Regulatory Com:nission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report September, 1985 Attached are twelve copies of the Monthly Operating Report for September, 1985 for the Monticello Nuclear Generating Plant.

Qs L,

David Musolf Manager of Nuclear Support Services DMM/MMV/le cc: Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment o,

I