ML20138B289
| ML20138B289 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 09/30/1985 |
| From: | Musolf D, Myrabo A NORTHERN STATES POWER CO. |
| To: | |
| References | |
| NUDOCS 8512120259 | |
| Download: ML20138B289 (5) | |
Text
.
~
^,
d P
A j -
df
- - /
J ',
/,#
NAREATIVE
SUMMARY
OF OPERATING EXPERIENCE t
a DOCKET NO.
50-263______
DATE 10- 1-85.___
COMPLETED BY A. L. Myrabo l
/
TELEPHONE 612/295-5151 I
MONTH ______ SEPTEMBER _______
9-1-95 to Power operation.
9-30-85 l
l l
l I
i SPENT FUEL STORAGE UPDATE I
Fuel assen.hLies in core 484 Fuel assemblier in spent fuel storage pool 484 Licensed depacity 2237 Date of,last refueling that can be 2000 l
discharge wIth present capacity.
e 1
f Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specIfIed survelL. lance testing.
i l.
f n512120259 050930 L
ADOCK050g3 ppft C
R e
i i
1 g
3l).
AVERAGE DAILY UNIT POWER LEVEL DOCXET NO.
50-263______
UNIT Monticelto__
DATE 10- 1-85____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ SEPTEMBER _______
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1'
__________540____________
17
__________551____________
2
__________547____________
18
__________549.___________
3
__________546____________
19
__________544____________
4
__________547____________
20
__________546____________
5
__________543____________
21
__________550____________
6
__________545____________
22
__________547____________
7
__________541____________
23
__________548____________
8
__________540____________
24
__________553____________
9
__________546____________
25
__________549____________
10
__________543____________
26
__________554____________
ii
'__________547____________
27
__________549____________
1o
__________549____________
,8
__________55o_____________
13
__________549____________
29
__________548.___________
14
__________551____________
30
__________553____________
15
__________546____________
31 16
__________550____________
INSTRUCTIONS 1
On this format, list the average dally unit power Levet in NWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
/
i g
e OPERATING DATA REPORT DOCKET NO.
50-263______
DATE 10- 1-85 ___
COMPLETED BY A. L. Myrabo
'(
TELEPHONE 612/295-5151 OPERATING STATUS,'
l Notes I
t'.
Unit Name : ________________________Monticalto
^ l l
- 2. Reporting period: ___________________ SEPTEMBER l
l
- 3. Licensed Thermal Power (MWt):
____________1470 l
l
- 4. Nameplate Rating (Gross MWe):
_____________569 l
1
/s
,5.
Design Electrica L Rat ing (Net MWe): _____545.4 l
l
- 6. Maximum Dependable Capacity (Gross MWe): __564 1-l 75 Maximum Dependable Capacity (Het MWe):
..___536 l__________________________l
- 8. If Changes Occur in Capacity Ratings (Items. Number 3 Through 7) Since Last Report, Give Reasons:
___________1______________________________________
- 9. Power Level To Which Restricted, If Any (Net MWe):
___N/A___________*________
- 10. Reasons For Restrictions, If Any: __N/A_____________________________________
_________e_____________________________________________-___--___--_-----
This Month Yr.-to'-Date Cumulative
- 11. Hours In Reporting Period-
_____720
_____655i
____124944
- 12. Number Of Hours Reactor Was Cri t ica l
___720.0
___5973.1
__ 96059.3
- 13. Reactor Rdserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hourp Genera tor On-Line
___720.0
___5851.3
__ 93838.0
- 13. Unit Reserve Shutdown Hours
_____0.0
______0.0
__.____0.0
- 16. Gross Therma L Energy Generated (MWH)
_1200497
_ 9506644
_142301190
- 17. Gross Electrical Energy Generated (MWH) __410332
__3249123
__48434176
- 18. Net Electrical Energy Generated (MWH)
__394108
__3116155
__46301208
- 19. Unit Service Factor
'__100. 0%
___ 89.3%
____ 75.1%
- 20. Unit Availability Factor
__100.0%
___ 89.3%
____ 75.1%
- 21. Unit Capacity Factor,(Using MDC Net)
__102.1%
___ 88.7%
____ 69.1%
- 22. Unit Capacity Factor (Using DER Net)
__100.4%
___ 87.2%
____ 67.9%
- 23. Unit Forced Outage Rate 0.0%
0.8%
5.0%
(
<1
- 24. Shutdowns Scheduled _0ver Nex t 12 Months (Type, 'Da te, and Duration of Each) l
__May 10, 1986 - 1986 refueling outage - 41 days _________________________
b
- 25. If Shut Down At End Of Report Period. Estimated Date Of Startup:____________
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved l
INITIAL CRITICALITY f
J' INITIAL ELECTRICITY COMMERCIAL OPERATION J_______
1 k\\
c F
1-bT
_ =. _ _
l t
b' UNIT SilUIDOWNS AND POWER REDUCI3ONS DOCKET NO.
50-263 UNIT N A*,lE h arfeelin DATE 10-1-85 COMPLETED llY A. L. Myrabo REPORT MONIH Sent==k-r l'
T ELEPHONF. 612/295-sist No
?
r.
- u. -
E,9.,
. = ~1e s
sX Le.sensee g-(
E Cause & C..eresine n
- 55 No.
Date k
3?
4
- E'7 f-?
Ats...n su
. Incus
~ C.
5 j f. j Repans
- E "'"
Psetine Resurren.e d
l None l
l I
L I
l 1
2 3
4 F: Forced Reason.
Method :
Edubis G-Insisuses ms 5: SchedulcJ A Equipment FailureIEsplaml 14tanual l'or Pseparati. n i.I~ Data Bataintenance of Test 2-Manual Sesam.
Ents) Sheets for lxensee C. Refueling
- 3. Autonusic Sstam.
Esen Rep.us LI RI File:NURLG-D-Regulator) Restristion 4-Other IE splaini 0161I E-Operator Training & Li enw Eumination i
F-AJnunistrative 5
l G Operational Esnor IEsplaml Estubs I - Sanw Source l'8!77) 11Other IEsplaint
O.
Northem States Power Company 414 Nicollet Mail Minr.eapons. Minnesota 55401 Telephone (612) 330-5500 October 9, 1985 Direc ar, Office of Resource Management U S Nuclear Regulatory Com:nission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report September, 1985 Attached are twelve copies of the Monthly Operating Report for September, 1985 for the Monticello Nuclear Generating Plant.
Qs L,
David Musolf Manager of Nuclear Support Services DMM/MMV/le cc: Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment o,
I