ML20138A318
ML20138A318 | |
Person / Time | |
---|---|
Issue date: | 10/22/1985 |
From: | Gillen D NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
To: | Martin D NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
References | |
REF-WM-41 NUDOCS 8512110650 | |
Download: ML20138A318 (3) | |
Text
Y W{dR2cordfde wr.! PrcML .
Domt Na.
. (JMl' ,
PDR C # --
OCT 2 g 125
' "' " ~ ~
.DMriS tin _y_
f
@.wa to tii .i e3 5[~ - - - - - -
QJ3-Distribution:
C WM s/f/ DE Martin WMLU s/f S Smykowski NMSS s/f Ted Johnson DM Gillen LB Higginbotham J0 Bunting MEMORANDUM FOR: Dan E. Martin, WMLU MJ Bell PD$--
RE Browning FROM: Daniel Gillen, WMLU
SUBJECT:
TRIP REPORT; MEETING WITH DOE / UTAH ON SALT LAKE CITY PROJECT Enclosed for your information is a summary of an October 2,1985 meeting on the Salt Lake City project that I attended at DOE's Albuquerque office following my construction review of the Shiprock site (see my October 10, 1985 memo to you).
Daniel Gillen, WMLU
Enclosure:
As stated 8512110650 851022 PDR WASTE WM-41 PDR DFC :WMLU:rb h..__:..__gMN__:___________:..._________:____________.:.___________:_________..:___________
NAME :DM Gillen : : : : : :
DATE :85/10/22 : : : : : :
l
3 o
007 2 2 ._
MEETING WITH DOE / STATE OF UTAH ON SALT LAKE CITY PROJECT DATE: October 2, 1985 LOCATION: DOE Office, Albuquerque, New Mexico PARTICIPANTS: NRC DOE / TAC STATE OF UTAH Daniel Gillen Mark Matthews Mark Day Ron Rager Charles Judd Bob BearJen PURPOSE:
To discuss NRC's review of proposed RAP modifications and the Remedial Action Inspection Plan (RAIP) for the Salt Lake City site.
DISCUSSION:
The first portion of the meeting addressed the two RAP modifications, which have been proposed by the State of Utah and transmitted by DOE to the NRC for review and concurrence. The results of the NRC review were conveyed to DOE and Utah (formally transmitted by letter dated October 7,1985) as follows: Note DOE and the TAC had been informed of NRC's position through earlier telephone discussions with our staff,
- a. Modification of rock absorption criterion - The staff has approved the proposed change, in part based on the stockpiled rock being larger than specified in the RAP. DOE / Utah were informed, however, that use of this rock would constitute another RAP modification and may affect the design of the filter layer. The State of Utah will re-check the actual gradations and provide information on the effects on filter design.
- b. Elimination of moisture specification for tailings material - The staff 3
has identified the need for additional information regarding the effects of higher moisture contents on the strength and compressibility of the tailings. The TAC agreed that further justification is necessary and will work with Utah personnel to prepare the analysis for NRC review.
i
. - _ - - - . . . . . , . - - - - - ~ - . . -
y .
1
. _ 2 twb The second topic of the meeting involved the NRC review comments on the State of Utah's draft RAIP (see September 18, 1985 letter from Higginbotham to Themelis). The comments were discussed individually and all issues were resolved. The State will revise the RAIP accordingly and transmit the final version to 00E. DOE will then send the document to NRC for concurrence.
l 1