Summary of Operating Reactors Events Meeting 85-23 on 851118.List of Attendees,Events Discussed & Assignments Encl
ML20138A305
Person / Time
Issue date: 11/22/1985
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Thompson H
Office of Nuclear Reactor Regulation
References
OREM-85-023, OREM-85-23, NUDOCS 8512110648
Download: ML20138A305 (23)


Text

.

NOV 2 21l185 4

MEMORANDUM FOR:

Hugh L. Thompson, Jr., Director Division of Licensing FROM:

Dennis M. Crutchfield, Assistant Director for Safety Assessment Division of Licensing

SUBJECT:

SUMMARY

OF THE OPERATING REACTORS EVENTS MEETING ON NOVEMBER 18, 1985 - MEETING 85-23 On November 18, 1985, an Operating Reactor Events meeting (85-23) was held to brief the Office Director, the Division Directors and their representatives on events which occurred since our last meeting on November 4,1985. The list of attendees is included as Enclosure 1.

The events discussed and the significant elements of these events are presented in Enclosure 2.

In addition, the assignment of follow-up review responsibility was discussed. The assignments made during this meeting and the status of previous assignments are presented in Enclosure 3.

Completion dates have been assigned for items in Enclosure 1. Each assignee should review Enclosure 3 with regard to their respective responsibilities.

Note that several assignees are approaching the due date. Please be responsive and advise ORAB (D. Tarnoff, x29526) if the target completion date cannot be met.

(0]l Dennis M. Crutchfield, Assistant Director for Safety Assessment Division of Licensing

Enclosures:

DISTRIBUTION As stated Central Files ORAB Reading cc w/ encl:

NRC#PDR See next page ORAB~ Members D-DL RAB D[

DL b, c / i D

ff:lb RWessman GH6 an DM teld 11/g/85 11/4/85 f

/

9 11/ A/85 11/27185

/g

') >

,p 1'

1hp h2M640 851122 7^,

i SC PDR p

vt t'

6 Hugh L. Thompson, Jr. cc:

H. Denton R. Hernan R. Bernero F. Schroeder 2

J. Knight D. Silver T. Spets J. Lyons C. Heltemes D. Brinkman T. Novak E. Weiss W. Russell R. Baer J. Taylor J. Stolz E. Jordan E. Butcher F. Rowsome D. Vassallo W. Minners B. J. Youngblood L. Shao D. Wigginton T. Ippolito D. Sells 4

G. Lainas S. Long E. Sullivan G. Rivenbark G. Edison D. Clark K. Seyfrit D. Lynch T. Murley, RI M. Fairtile J. Nelson Grace, RII P. Tam J. Keppler, RIII D. Mcdonald R. D. Martin, RIV L. Kintner J. B. Martin, RV E. Adensam R. Starostecki, RI S. Varga R. Walker, RII C. Stahle C. Norelius, RIII R. Hernan E. Rossi, IE W. Long i

P. Baranowski, NMSS F. Kantor D. Kirsch, RV D. Mathews R. Denise, RIV i

I s

- -. _.. ~., _.,,... - -

.,_,_,...,,..m

.___.-_,,._,__m-,,_

-.._,,_m,,

OPERATING REACTOR EVENTS BRIEFING 85-23 LIST OF ATTENDEES NAME OFFICE H. R. Denton NRR Wm. H. Regan DHFS F. Kantor IE/DEPER M. Caruso NRR/0RAB W. P. Haass IE/VPB M. J. Clausen OCM R. O. deCastongrene IE/DEPER J. N. Hannon NRR/0RAB D. J. Zukor AE0D/ROAB i

E. W. Merschoff IE/VPB V. D. Thomas IE/DEPER D. B. Vassallo NRR/DL R. Singh IE/DEPER C. Miller NRR/DL D. Crutchfield NRR/DL J. E. Lyons NRR/PPAS J. J. Stefano NRR/DL E. J. Weinkam NRR/DL S. Black NRR/DL G. Gears NRR/DL S. Long IE/DEPER E. Weiss IE/DEPER A. W. Dromerick IE/DEPER K. Seyfrit AE00 M. D. Lynch NRR/DL D. Clark NRR/DL C. Berlinger NRR/DL E. Murphy NRR/DL I.

T. S. Rotella NRR/DL J. T. Beard NRR/DL G. Holahan NRR/DL T. M. Novak NRR/DL T. P. Speis NRR/ DST R. M. Bernero NRR/DSI F. J. Miraglia NRR/DL S. Varga NRR/DL C. E. Rossi

-IE/DEPER/EAB E. Jordan IE/DEPER H. L. Thompson NRR/DL D.~Tarnoff NRR/0RAB 4

l O

i OPERATING REACTOR EVENTS BRIEFING (85-23) i NOVEMBER 18, 1985 GRAND GULF UNIT 1 TDI DIESEL GENERATOR OVERSPEED FERMI UNIT 2 ENGINE FAILURE OF EMERGENCY DIESEL ST. LUCIE UNIT I INTERNALS LIFTING RIG FAILURE I

HATCH UNIT 2 FUEL ASSEMBLY LIFTING RIG FAILURE BROWNS FERRY OFFSITE CONTAMINATION INCIDENT DURING EMERGENCY PLAN EXERCISE 1

OTHER EVENTS OF INTEREST HATCH UNIT 1 CRACK IN THE DRYWELL INERTING AND PURGE LINE i

D. C. COOK UNIT 2 REACTOR TRIP BREAKER FAILURES (UPDATE) 1 l

i i

[

=

N GRAND GULF UNIT 1 - TDI DIESEL GENERATOR OVERSPEED NOVEMBER 6, 1985, (L. L. KINTNER, NRR)

PROBLEM:

TDI DIESEL. GENERATOR II OVERSPEED EVENT DAMAGED MAJOR COMP 0NENTS OF THE ENGINE SIGNIFICANCE:

l POSSIBLE GENERIC CONCERN REGARDING MAINTENANCE PROCEDURES FOR WOODWARD GOVERNOR.

OVERSPEED TRIP FUNCTION MAY NOT PROTECT AGAINST EXCESSIVE OVERSPEED DURING FAST ENGINE STARTUP IF ELECTRIC GOVERN 0R IS INOPERABLE.

CIRCUMSTANCES:

ENGINE OPERABILITY POST-MAINTENANCE TEST DURING PLANT OUTAGE FOLLOWING SCHEDULED PREVENTIVE MAINTENANCE OF GOVERN 0R UNEXCITED START - NO ELECTRIC GOVERNOR FUNCTION PER 2

PROCEDURE, FUEL RACK FULL OPEN, TRIPPED ON OVERSPEED AND MANUALLY, TOTAL RUN TIME 45 SEC, SEVERE VIBRATIONS.

t CAUSE:

WOODWARD MANUALS IN USE AT GGNS DID NOT SPECIFY VENTING /

BLEEDING AIR FROM GOVERNOR DURING P/M.

VENTING / BLEEDING IS SPECIFIED IN LATEST WOODWARD MANUALS.

MECHANICAL GOVERNOR WAS INCORRECTLY SET TO 470 RPM DURING TEST RATHER THAN TO 350 RPM AS CALLED FOR BY NORMAL POST-PM PROCEDURE.

l i

. 2 FOLLOWUP PEAK ENGINE SPEED UNDER INVESTIGATION ENGINE DISASSEMBLY AND INSPECTION BEING PERFORMED, NUMEROUS PARTS IN DAMAGED OR DISTRESSED CONDITION: PARTICULARLY CONROD BEARINGS, MAIN BEARINGS, LINK PIN BUSHINGS, AND ENGINE BASE, WILL REPLACE ALL CONROD AND MAIN BEARINGS, ONE CONROD, AND OTHER PARTS AS NECESSARY/ PRUDENT, SIGNIFICANCE OF ENGINE BASE CRACKS ARE UNDER EVALUATION SENT GOVERNOR TO MANUFACTURER (WOODWARD) FOR TESTS IN AS-FOUND CONDITION (INCLUDING INSUFFICIENT OIL),

TDI OWNERS GROUP INFORMED OF INCIDENT BY NRC STAFF AND LICENSEE, SENT REPRESENTATIVES TO SITE TDI PROJECT GROUP OBSERVED DISASSEMBLED UNIT AND WILL F0LLOW-UP ON PLANNED INSPECTIONS AND REPAIR.

A DIESEL CONSULTANT WILL VISIT SITE THIS WEEK REGION II AND RESIDENT INSPECTOR WILL FOLLOW-UP ON REPAIRS AND RESTART IE EVALUATING NEED FOR IE NOTICE 1

e

E a a i ^) E ISAsE 0FAC k 5 D6Prp 12' p etra - I,3 "

/

/

s s

L pgprH-0'/'

0(A$I4(?

CAP Syv D JJoLE (2. )

Z)0 v)E L fl A) )}6 L E

,-,,,,,,n--__.~,

,---,--,,,-v-

FERMI UNIT 2 - ENGINE FAILURE OF EMERGENCY DIESEL NOVEMBER 13, 1985, (M. D. LYNCH, DL)

PROBLEM:

FAILURE OF MAIN BEARINGS IN EDG NO. 13 (DIV.2) CAUSED SEVERE DAMAGE SAFETY SIGNIFICANCE:

LOSS OF AN EDG WILL CAUSE LOSS OF ONE DIVISION OF ON-SITE POWER SUPPLY CASTS DOUBT ON RELIABILITY OF ON-SITE POWER SUPPLY CIRCUMSTANCES:

EDG FAILURE OCCURRED 2 1/2 HRS. INTO A 24-HOUR LOAD TEST OPERATOR SECURED EDG UNIT UPON HEARING " UNUSUAL" NOISES BACKGROUND:

UNIT HAD A NUMBER OF INADVERTENT STARTS WITHOUT PRELUBE SINCE LAST INSPECTION IN FEBRUARY 1985 3 0F 4 EDG's WERE INADVERTENTLY STARTED WITHOUT PRELUBE ON 11/10/85 EDG NOS. 11 AND 12 (DIV.1) HAD SIMILAR FAILURES IN JANUARY 1985 HOWEVER, LOWER BEARING HAS FAILED IN THIS EVENT, NO LOWER BEARING FAILURE OBSERVED PREVIOUSLY FOLLOWUP:

REGION III, NRR, FAA, AND DECO ARE SENDING SAME PERSONNEL WHO INVESTIGATED PREVIOUS FAILURES N0. 3 UPPER MAIN BEARING FAILED NO. 4 LOWER MAIN BEARING FAILED NO. 13 UPPER BEARING (THRUST) IS " DISTRESSED" DISASSEMBLY IS CONTINUING

ST, LUCIE UNIT 1 - INTERNALS LIFTING RIG FAILURE NOVEMBER 6, 1985 (S. LONG, IE)

PROBLEM:

WHILE REMOVING THE UPPER INTERNALS GUIDE STRUCTURE 1 0F 3 BOLTS CONNECTING THE STRUCTURE TO THE LIFTING RIG FAILED WITH THE STRUCTURE STILL OVER THE CORE SIGNIFICANCE:

THE 50 TON LOAD COULD FALL BACK INTO REACTOR VESSEL, POSSIBLY CONTACTING AND DAMAGING FUEL, RESULTING IN RELEASE OF RADI0 ACTIVE GASES TO THE CONTAINMENT CIRCUMSTANCES:

WHILE LIFTING INTERNALS, LIFT WAS STOPPED WHEN RIG WAS SEEN TO BE SLIGHTLY TILTED DYNAMIC FORCE FROM STOPPING LIFT CAUSED 1 0F 3 BOLTS ATTACHING RIG TO INTERNALS TO FAIL.

RIG CANTED -se N6" UP AND STRUCTURE s' N6" DOWN ATTEMPT WAS MADE TO LOWER INTERNALS TO INSTALLED POSITION, BUT LOAD CELLS INDICATED BINDING LICENSEE DECLARED AN UNUSUAL EVENT, ENHANCED CONTAIN-MENT INTEGRITY AND IMPLEMENTED PROCEDURES TO MONITOR LOAD STABILITY SECONDARY LIFTING RIG WAS DESIGNED, TESTED AND INSTALLED ASSEMBLY WAS JACKED LEVEL AND THEN MOVED TO ITS NORMAL POSITION IN REFUELING P0OL ON 11/9 FOLLOWUP:

UNDERWATER CAMERA SURVEY INDICATED THAT FAILED BOLT WAS ONLY INSERTED ABOUT THREE TURNS, AND STRIPPED DURING LIFT CE PROCEDURES FOR RIG ATTACHMENT INCLUDE VERIFICATION OF THREAD ENGAGEMENT; THIS WAS OMITTED FROM LICENSEE'S PROCEDURES KNOWN DAMAGE:

LIFTING RIG IS BENT.

SOME VESSEL GUIDE PINS ARE BENT, 3 INSTRUMENT THIMBLES ARE DAMAGED, NRR PROJECT MANAGER IS ON-SITE TO OBSERVE LICENSEE'S i

INSPECTION OF DAMAGE l

IE CONSIDERING INFORMATION NOTICE.

)

EXPANSION e

COMPENSATING HL M

RING 8

8

,q%,; p.n'sk-s e -c es q.p<?

r

,,i a

s s

s 1,

s e

j 2

s

.e-eFd -s;b8 M

bc

!Y

?t '3b -l f b

P e

cy s

Qef

=Q L't.

sMb

)

h i

i$$ h ' h4(GE p

e O fiMij{

J cr" po iG r TH 4 0 iO W

/

OUD O'

GRID W M V.

ASSEMBLY -

~

M-i i

O' h.

i CEA SHROUDS

.'i 5

d,4 p,

T m,

o l

l l

g I

I

.M l

{

w\\

l

\\

l J 0'

U y

?

s j

f' e

l@N l p u

v N

y v

h i

f I %

(H* * :

L.:

a

  • b

, v p

e t

q r i

1 r!

i n

.[

    • L V

i l

NM i i

L

.au..t.ht B:.

rm r

FUEL ASSEMBLY AUGNMENT PLATE FLORIDA 8"

PCWER & LIGHT co.

St. Lucie Plant Upper Gu.ide Structure Assembly 4 2-10 ll

1

+

UPPER GUIDE i

EXPANSION -

C PENSATING i-STRUCTURE SUPPORT

)

O O

O O

O O

O PLATE

~

~

i

-m i

- { '"l

]'

.j

g ALIGNMENT

.i.

.l.

l l KEY l l l

CEA SHROUD m.

i..

i.-

l j

IN CORE i..

i.

[

INSTRUMENTATION OUTLET NOZZLE GUIDE TUBE i..

i,,,,

e I

m o

d ALIGNMEN i,,

i.,

PINS CORE

't vli

  1. "m i
  1. 4:n # a26 #4:n

( "-A #42) z 1

SUPPORT I

BARRR s -

l/

k{

,d FUEL l

l5 ALIGNMENTd l

k l

PLATE

}

[ {

l CORE

--i! <

SHROUD W

i s

h,

1 b '

s k '

i k '

l l

FUEL s

CORE

[

ALIGNMENT

[ PINS SUPPORT 7

N PLATE s

a I s t

/l&

y 7_.

m..

m.,

d

...'[

CORE

),l- ---SUPPORT

{

ll

.,C

.$ l I;3 IPI f{l tv

+

ASSEMB LY-

,l

' 31 '..in

Esi, e

1 SNUBBE R -> k,' l l

l l

{

{

{

[. '

s' s

+

s jg 6.

0

.. 6...

wn!,.. m.

a n

Am. 3-7/85 FLORIDA Figure POWER & LIGHT CO.

St. Lucie Plant REACTOR INTERN ALS ASV.MBLY r

4.2 7 Unit 1

=

~

~)

ICI-H01ST H ASSEMBLY LIFT POINT FOR CRANE HOOK qv, i

7 UPPER CLEVIS ASSEMBLY k\\

LIFTING BOLT TORQUE TOOL s

-WORKING PLATFORM bQh I

7

\\

ICI-SUPPORT N

'I BEAM (FOR

.j UP-POSITION)

)

)t

^

i 8

9

'IL

-} %)g m

m lNSTRUMENT STALK OPENING

, N b$$

f,'

/

____l j L i M

SPREADER BEAM

/ / N j\\

~

SUPPORT

/

V 5TRUCTURE

% fz -

0

'N

\\

180

- COLUMN ICl.- ADAPT 0R -

N rGUIDE BUSHING FOR

/ R.V. GUIDE PIN ATTACHMENT POINT p

r E PLACES)

O PLACES) 4-

'~

=

\\

0 LIFT BOLT ~

0

)

POWE &

TCO.

Upper Guide Structure Ufting Rig 9.1-8 St. Lucia Plant l

7,,--

-,,...n.

,,,., -, ~,

-n N

HATCH UNIT 2 - FUEL ASSEMBLY LIFTING RIG FAILURE NOVEMBER 8, 1985 (D TARNOFF, NRR) v PROBLEM:

STRIPPING 0F EYE BOLT FROM THE CABLE TERMINAL ASSEMBLY CAUSES NEW FUEL BUNDLE TO DROP INTO SPENT FUEL P0OL SAFETY SIGNIFICANCE:

POTENTIAL FOR DROP ON SPENT FUEL ASSEMBLY AND RELEASE OF FISSION PRODUCTS POTENTIAL GENERIC SIGNIFICANCE CIRCUMSTANCES:

i FAILURE OCCURRED DURING TRANSFER OF NEW FUEL ASSEMBLY FROM FUEL INSPECTION RACK TO FUEL PREPARATION MACHINE j

A 7/16" EYE BOLT THREADED INTO A 1/2" H0LE'0KcCAB.LE TERMINAL STRIPS FUEL ASSEMBLY FALLS FROM SURFACE TO BOTTOM 0F SPENT FUEL P0OL AND COMES TO REST AGAINST RACK NO RELEASE OF RADI0 ACTIVITY OPERATOR GUIDING BUNDLE FROM PLATFORM 0F PREPARATION MACHINE

^

SUFFERS MINOR CONTUSIONS J

FOLLOWUP:

INSPECTIONOFSIMILARGECABLETERMINAL-ASSEMBLIES \\INSTORAGE REVEALS 3 OUT OF 11 ARE MISLABELED ALL 7/16" AND 1/2" CABLE TERMINAL ASSEMBLIES WERE' ENGRAVED WITH THE SAME PART NUMBER v

THE PROPER SIZE OF PARTS TO BE USED AT H TCH HAS NOT BEEN DETERMINED YET

. UNDERWATER CAMERA EXAMINATION OF FUEL ASSEMBLY HAS REVEALED DAMAGE TO THE NOSE PIECE AND THE THE BAIL HANDLE LICENSEE HAS HALTED ALL FUEL HANDLING ACTIVITIES AND IS INVESTIGATING TO ASSESS THE EXTENT OF PROBLEM GE HAS DISPATCHED A FUEL REC 0VERY SPECIALIST TO SITE AND INFORMED OTHER PLANTS OF CONCERN THROUGH GE OPERATIONS ENGINEER OR SERVICE REPRESENTATIV$'

,I i

0382

'{

',s

.e r

/

ff/

/

/

9

/

/

lf

/

b i

6.".

s j

I

/

UPPER PRAMF s

p.-

N LOutER FRA4EE c4anmu I

I e

l

'\\

/

FIGURE 12.3-6 FUEL PREP AR ATION M ACHINE T

12.3-29 r

- ~ ~

~~ '

f

_ C f A ir E Hook z

7

?

SL/ NG s

l P

t SHACKLE i.

fAiLUff

(

5yg l} n Y 2-9 a

C A6 LE Y E A ??t N A L

,1,l 83

~&

'GE NER AL l'un h S E O

GB A PPic

,frb-Q d

)

(,L,'9 b4 L M A k.p 4 E N

g...

FUEL A SS EM/3 Ly H Arch urir 2 lifting 19 (c

T BROWNS FERRY - 0FFSITE CONTAMINATION INCIDENT DURING EMERGENCY PLAN EXERCISE NOVEMBER 13, 1985 (F. KANTOR, IE)

PROBLEM:

CONTAMINATION OF INDIVIDUALS DURING EMERGENCY DRILL SAFETY SIGNIFICANCE:

PERSONNEL CONTAMINATION DISCUSSION:

TVA WAS SUPPORTING A STATE OF ALABAMA MEDICAL DRILL DURING AN EXERCISE OF THE BROWNS FERRY EMERGENCY PLAN.

SCENARIO CALLED FOR A MONITORING TEAM TO RESPOND TO A CONTAMINATED CASUALTY OFFSITE.

CONTAMINATION WAS SUPPOSED TO BE CONTAINED SOURCES.

A STATE OF ALABAMA EMPLOYEE WHO WAS ACTING AS AN EXERCISE CONTROLLER DRIPPED ABOUT ONE MILLICURIE OF LIQUID TECHNETIUM 99M ON THE BANDAGE OF A TVA EMPLOYEE WHO WAS PLAYING THE ROLE OF THE CASUALTY, ANOTHER MILLICURIE OF TE-99M WAS DRIPPED ON TO A LAB C0AT.

TE-99M IS A LOW ENERGY GAMMA EMITTER WITH A HALF-LIFE OF SIX HOURS THE SIMULATED CASUALTY ALONG WITH FOUR OTHER TVA EMPLOYEES ON THE RESPONSE TEAM BECAME CONTAMINATED IN THE COURSE OF HANDLING THE CASUALTY, THE INCIDENT TOOK PLACE ABOUT ONE AND A HALF MILES OFFSITE.

THE CONTAMINATION OCCURRED ABOUT 12:30 PM.

INDIVIDUALS RETURNED TO PLANT FOR DECONTAMINATION.

A NOTICE OF UNUSUAL EVENT WAS DECLARED AT 5:28 PM.

ONE INDIVIDUAL HAD CONTAMINATION TO 30,000 CPM ON HIS FACE AND 500,000 CPM ON ONE HAND, CONTAMINATION LEVELS RANGED FROM 800 TO 40,000 CPM ON THE OTHER FOUR INDIVIDUALS, THE ALABAMA STATE EMPLOYEE RECEIVED CONTAMINATION ON HIS SHOES.

A 200 SQUARE FOOT AREA 0F GROUND WAS ALSO CONTAMINATED.

SOME CONTAMINATION WAS INGESTED, INITIAL LICENSEE REPORT INDICATED ONE INDIVIDUAL RECEIVED ABOUT A 4% BODY BURDEN, TVA PERFORMED WB COUNTS AND IS COLLECTING URINE AND FECAL SAMPLES.

THE 200 SOUARE FOOT AREA WAS POSTED AS A CONTAMINATED AREA, FOLLOWUP:

TVA IS PLANNING TO MEET WITH THE STATE AND IS PREPARING AN INTERNAL REPORT.

NOT CONSIDERED A REPORTABLE EVENT, STATE OF ALABAMA IS PREPARING A REPORT.

ALABAMA IS AN AGREEMENT STATE.

A PREVIOUSLY SCHEDULED REVIEW 0F THEIR PROGRAM BY REGION II IS TO TAKE PLACE THIS WEEK, NO ADDITIONAL ACTIONS CONTEMPLATED AT THIS TIME, i

i i

UNPLANNED REACTOR TRIPS

  • TRIP FREQUENCY FOR PAST THREE WEEKS IS 9 TRIPS / WEEK, WHICH l

IS ABOUT THE AVERAGE WEEKLY FREQUENCY BREAKDOWN OF REPORTED CAUSES:

j AUTOMATIC EQUIPMENT FAILURES 61%

PERSONNEL ACTIVITIES 35%

MANUAL 4%

l TEST 0%

  • BASED ON 10 CFR 50.72 REPORTS FOR PLANTS WITH LICENSES FOR FULL POWER OPERATION l

I j

l F

f I

r i

4 OTHER EVENT OF INTEREST HATCH UNIT 1 - CRACK IN THE DRYWELL INERTING AND PURGE LINE DECEMBER 15, 1984, (P, TREMBLAY, NRR) i PROBLEM:

CRACK IN N2 INJECTION LINE FOUND DURING ISI AFTER VISUAL AND LIMITED MT CONDUCTED IN RESPONSE TO GE SIL 402 SAFETY SIGNIFICANCE:

GENERIC IMPLICATIONS INSPECTIONS OF N2 INJECTION LINES CONDUCTED BY LICENSEES C0VERED BY GE SIL 402 MAY NOT HAVE BEEN ADEQUATE P0TENTIAL LOSS OF CONTAINMENT INTEGRITY DISCUSSION:

HATCH ATTRIBUTED EVENT TO GROWTH OF PRE-EXISTING WELD DEFECT GROWTH COULD HAVE BEEN INDUCED BY THERMAL STRESSES RESULTING FROM USING CAD SYSTEM IN ADDITION TO NORMAL INERTING SYSTEM

)

FOR START UP INERTING SINCE OUTSIDE AIR TEMPERATURE WAS 22* F DURING THE DAY AND THE CAD USES AN AMBIENT VAPORIZER, THERE WAS THE POSSIBILITY OF COLD NITROGEN INJECTION, THUS INDUCING THERMAL STRESSES NRC FOLLOWUP ACTION:

CONSIDERING IE INFORMATION NOTICE TO BE SENT TO INDUSTRY CONSIDERING LETTER TO BWROG DISCUSSING POSSIBLE INADE00ACIES OF GE SIL AND VOLUNTARY CORRECTIVE ACTION 4

,y-

--g-,,----r

-e, e-m---

,--w>s--~

w

---w-

,mr n

,-g----y-we m

g--,-,

w-w

--v-ye w www e

w w

4 OTHER EVENT OF INTEREST D, C, COOK UNIT 2 - REACTOR TRIP BREAKER FAILURES i

OCTOBER 29, AND NOVEMBER 3, 1985 UPDATE - J T

BEARD, NRR PROBLEM:

UVTA/RTB-A FAILED TO TRIP DURING OCTOBER 29, 1985 ACTUAL SCRAM DEMAND UVTA/RTB-B FAILED UVTA FORCE MARGIN TEST ON NOVEMBER 3, 1985 SIGNIFICANCE:

UNKNOWN DEGRADATION / FAILURE MECHANISM FOR NEW UVTA IN WESTINGHOUSE DB-50 RTB 1

DISCUSSION:

IN-PLANT TESTING SHOWED PROBLEM TO BE LOSS OF FORCE IN UVTA BULLETIN 85-02 ISSUED NOVEMBER 5, 1985, TO REQUIRE SPECIAL TESTS FOR CURRENTLY OPERATING PLANTS, (KEWAUNEE, BEAVER j

VALLEY 1, AND TURKEY POINT 4) WITHOUT AUTO SHUNT TRIP, 2 TEST FAILURES AT KEWAUNEE, OTHERS SUCCESSFUL FAILURE ANALYSIS TESTING STARTED AT WESTINGHOUSE NOV. 11, 1985 --

VISUAL INSPECTIONS, FORCE MEASUREMENTS, ELECTRICAL TESTS, CYCLIC PERFORMANCE TESTS -- RESULTS NOT IN YET -- NRC/FRC MONITORING LICENSEE MAY DECIDE TO DO SUPPLEMENTAL TESTS -- PERFORMANCE

^

TESTS, DISASSEMBLY AND EXAMINATION IE/ VENDOR BRANCH CONDUCTING SPECIAL INSPECTION OF UVTA MANUFACTURING (DEC 1983) AND RTB REFURBISHMENT (JULY, 1985)

P i

i

Page No.

1 OPERAi!NS REACTORS EVENTS MEE11NS FDLLOWUF ITEMS AS OF MEET!h5 85-23 DN NOVEMBER 18,1995 (IN ASCENDING MEETINS DATE, NSSS VE GOR, FAtillif ORCER)

MEETING FACILITY RESPCNS!)LE TASK DESCRIPT!0N SCHEDULE CLOSED DATE CC'"'ENTS N'.H'IER/

NSSS VECCR/

DIVISIONI COMFLET. 8Y DOCUMENT, MEET!h6 EVENTDESCRIP.

IEIV! DUAL DATE(S)

MEETING,ETC.

DATE CRYSTAL RIVER 3

!CSI/RCSA,F.

CONSIDER NEED FOR AtDITIONAL 12/30/85 CPEN

/ /

ICSI CCN!! DER!hs 01/03/85 Id / TEMP. LCSS

/

REQUIREMENTS ON ALARMS /

09/30/85 OC0 HEE 1 LOSS OF OF NNI 12/28/84 ANNUCIATORS 07/30/85 AhNUCIA.

(4/25/95) IN ANAL.

OF REQUIRER.ENTS.

35-11 OYSTER CREEK 1 DHFS/CLAYTON I.

DETERMINE EFFICACY OF EPG/

11/19/85 CLOSED 11/20/85 07/01/85 EE /

/

DPERAIOR ACTION AND EICESS!VE 09/15/95 MV.4,19E5 MEM UNCCNTROLLED RESPONSE TIME.

08/30/85 N 6 KENNEDY TO LEAKAGE OF u i RUSSELL REACTOR COOLANT DUTS!DE CCNTAINMENT 6/12/85 85-12 SEA 8 ROCK DSI/ MARSH ANALYTE SAFETY IMPLICAil0NS OF 12/06/95 DPEN

/ /

07/23/85 N / CRC $lf RAIN

/

VALVEFLOWDEFICIECT IC/30/85 STEAMSAFEff 09/30/85 VALVEFLCu MFICIECY 12/84 85-13 FORE!6N IE /RCSSI, E.

C0hSIDER ISSUACE OF IE 11/20/85 CLOSED 11/20/85 C/13/85 NA / PRjlf!PLE

/

INFORMAfl0N N0f!CE.

09/30/85 IE MT!CE WILL FEEId4TER 09/03/85 OT BE ISS. NO FAILURES GEN.APFL.

85-13 POINT BEACH IE /LONS, S.

DRAFT !E ET!CE ON PT.8EACH 11/27/95 OPEN

/ /

DFAFT lE M ilCE IN ~

C/13/85 u / SAFETY C8Al/ CARUS 0,M.

EVENT. CONS!LERTEMP. INSTR.FOR 10/18/85 CCC'.1RECE.NKR INJECTION RES.!NSPECTCRREGARDING 09/13/85 IN'UTCC9LETE

~-

MIN!-FLCuRECIRC CCMFLIANCEWITHAPP.t CSS!GN IEFIC!EhCY 85-13 TURrEYPO!NT3 DS!/PARR,O.

REVIEN AIECUACf 0F 63VERNCR 01/05/86 0 FEN

/ /

C/13/85 W /FCST-TRIP

/

M S!6h CN TURl!ht LRIVEN AFW 10/13/85 LCSS OF AFW PU55

//

B5-14 SEGUOYAH DL /STAHL C INITIATESTAFFREVIEWOFTVA 12/30/85 OPEN

/ /

C/26/85 N / UN!iS 1 4 2

/

SOMITTALS 09/30/85 VOLUNTARY

//

SHUTLCNNSYTVA BECAUSEOFE8 INADEGUAtlES 95-15 PEACH MTTOM 3 DE ILIAN 8 D DETERM!NEWHATFUTUREAti!ON 11/30/85 OPEN

/ /

09/09/85

/ NEW P!PE M /H4!ELTON N NEEDED ON GENERIC BASIS 10/15/85 CRACK

//

INDICAi!ONS

Pa(e 2

OPERAi!h6 REACTORS EVENTS MEETINS FOLLOWUF ITEMS AS OF PEET!NS 95-23 ON NOVEMEER 18,1995 (IN ASCENDING MEETING DATE, NSSS VENDOR, FACILITY ORDER)

KETING FACILITY RESPONSIBLE TASK DESCRIP110N SCHEDULE CLOSEDBATE COMENTS NUMERI NSSSVENDORI DIVISION /

COMPLET. If DOCUMENT, EETING EVENT DESCRIP.

INDIVICUAL DATE(S)

MEETING, ETC.

DATE 95-17 PALO VERDE 1 DL /KNIGHTON 6 KTERMINE NHETHER FRCBLEM IS 11/26/95 CLOSED 11/18/05 09/13/95

/ REACTOR

/

GENERIC TO NATERFORD AND SAN 11/08/85 6 KNIGHTON HAS TRIP, SAFETY ONOFRE

//

DET.PR0ll.15 N01 E N. TO INJECTION, LOSS DrPRESSURi!ER NATERFORD AND AUI!LIARY SPRA SAN ONDFRE SYSTER 35 1B RULTI CST / CBIN A SST N!LL FACT ** EIPERl[NCE INTO 11/14/85 CLOSET 11/20!B5 09/30/I5

/ NURRICANE

/

COMMIS$10N BRIEFINS ON STATION 10/30/05 CCMMISSION 6LORIARESPCNSE BLACKDUT

//

REETING ON 11/14/85 85-19 M uhSu!CK 2 BL 1610TENWIS M FOLL0s $ HIEFING NMEN CAUSE 12/15/85 OPEN

/ /

10/0T/95

/ R$1Vs

/

AND IM8LICAi!ONS OF EVENT ARE

//

FA!LUE 10 CLCSE FULLY UhtERSTOCD

//

95-21 PALOVERIE DL /MIFA6LIA F DISCUSS NiiH REGION 5 11/15/05 CLOSED 11/20/85 10/28/15

/ UNPLA wet

/

ACCEPTA!!LITV 0F RESTART

//

T NOVACK REACTCR TRIP

//

DISC.N!THRE6.5 IMl!N6 TESTING ACCEPT.CF RESTART 85-21 PERRY DL /ST[TANO J DETER't!NE !F PIP!h5 IS ADEQUATE 12/30/85 CLOSED 11/19/B5 10/20/15

/ TEST RETURN

/

DEFORELICENS!NSDEC!$10N

//

II/2t/I5MEMSJ L!htP!P!N6

//

STEFAN3TOIJ DVERfRESSURl!ATI YOUnilLOOD ON B5-21 TR3JAN CSI INERMIEL J REEIAMINE NEED FOR TH15 01/31/86 0'E4

/ /

10/20/85

/ thC0aRECT

/

INSTALLATION AND SEKERIC

//

SETPO!NTSFOR APPLICAl!LITY

/ /

TR!P OF AFN PUPSSONLON Scti!0NPRESSUFE B5-22 SPAND SULF CE /MAIELTCN N FOLLCWUP REGARO!N6 6ENERIC 12/04/85 DPEN

/ /

!!/04/15

/

/

IMPLICAfl0NS AND ADEBUACY OF

//

RECIRCULATION INSI

//

PIPECRACK 8522 MC SulPE 1 6 2 IE /R $1N6H CONSIDER !$5UANCE OF AN lE 12/20/15 OPEN

/ /

!!I04/85

/ SUAL UNii

/

N0flCE 11/20/05 TRIPDNLOSSOF

//

INSTRCPENTAIR

Pa;e No.

3 OPERATIN6 F.IACTORS EVENTS MEETING FOLLOFJP ITEMS AS OF MEETINS B5-23 ON NOVEMBER 18,1985 (IN ASCENDING Eti!N6 DATE, NSSS VENDOR, FACILITY ORDER)

KETING FACILITY RESPONS!ILE TASr ESCRIFi!DN SCHEDULE CLOSED BATE CO9MENTS i

NL?tERI NS;SVENDOR/

DIV!$!DN/

COMPLET. SY SOCUMENT, EETING EVE %i MSCRIP.

INDIVIDUAL DATE(Si EETIN6,ETC.

DATE B5-23 BRONNSFERRY IE /F KANTOR DISCUSS WITH FEMA NRC POSITION 12/18/65 0 FEN

/ /

11/11!B5

/ OFFSITE

/

N!THRE6ARDTOEMER6ENCYPLAN

//

CONTAMIN.

EIERCISE

//

INC! KN1 DURING E9ERBENCY PLAN EIERCISE B5-23 51LUCIEI DNFS/N H REGAN ETERM!NE IF SRO SUPERVISION 15 11/30/85 CLOSED 11/20/85

!!/11/95

/ INTERNALS

/

REQUIRED

//

BY TECH SPEC LIFilh5 RI6

//

6.2.2.0 (A;M FAILURE CTRU SRO SlPERV. 15 REQU.

e e

P..

i l

-.