ML20138A247

From kanterella
Jump to navigation Jump to search
Forwards Final TER for Remedial Action Plan & Site Design at Maybell U Mill Tailings Site Maybell,Co
ML20138A247
Person / Time
Issue date: 04/21/1997
From: Joseph Holonich
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Rael G
ENERGY, DEPT. OF
Shared Package
ML20138A252 List:
References
REF-WM-69 NUDOCS 9704280024
Download: ML20138A247 (1)


Text

,,_ u Mr. George Rael, Acting Director April 21, 1997

')

Environmental Restoration Division i

Uranium Mill Tailings Remedial i

Action Project Albuquerque Operations Office U.S. Department of Energy P.O. Box 5400 l

Albuquerque, NM 87185-5400

SUBJECT:

FINAL TECHNICAL EVALUATION REPORT FOR THE MAYBELL, COLORADO, URANIUM MILL TAILINGS SITE

Dear Mr. Rael:

)

The U.S. Nuclear Regulatory Commission staff has completed its review of the final Remedial Action Plan and Site Design (RAP) and the Remedial Action Inspection Plan (RAIP), Revision 0, for the inactive uranium mill tailings sites at Maybe11, Colorado. The staff's review is documented in the enclosed final Technical Evaluation Report (TER).

Based on this review, the NRC staff concurs in the Maybell RAP and RAIP.

The Department of Ei.argy (D0E) has proposed no groundwater cleanup at the Maybell site.

This proposal is based on the following:

DOE's characterization of the uppermost aquifer as " limited use," containing wide-spread ambient contamination not related to uranium milling activities; no current or i

projected future water use of the aquifer within a 4.8 km (3 mile) radius of the site; no apparent discharge of tailings contaminated groundwater to surface-water bodies or deeper aquifers in the vicinity; and continued groundwater monitoring of the existing contamination to assure conditions remain unchanged.

Based on its review of DOE's proposal, the NRC staff agrees with DOE's findings and concludes that DOE has demonstrated compliance with all groundwater protection provisions of 40 CFR 192, Subparts A through C.

As 4

a result of the staff's concurrence, NRC is prepared to sign the signature pages for the Maybell RAP, following their submittal by D0E.

j If you have any questions concerning this subject, please contact the NRC Project Manager, Robert Carlson, at (301) 415-8165.

Sincerely, (fo"sep? 3. S 9"o'd T, %"$W M. Gillen for) i9 Hoi ic Uranium Recovery Branch 9704200024 970421 Division of Waste Management WM-69 PDR and Safeguards Nb v[!

PDR WASTE Office of Nuclear Material Safety pp M

Enclosure:

As stated cc:

W. Woodworth, DOE Alb S. Hamp, DOE Alb E. Artiglia, TAC Alb qf63 DISTRIBUTION w/ Encl.:

File Center NMSS r/f URB r/f PUBLIC AGarcia CCain CNWRA AC.@)

w/o Encl.-

""~h MFederline DOCUMENT NAME:

S:\\DWM\\ URB \\RDCMAYTER.LTR OFC urb E

yRIl a /

f-l%A C

dtkb DGYen JHo N NAME DATE 04/2l/97 H

04/ti/97 4

04/u/97 H

OFFICIAL RECORD COPY

.