ML20138A234
| ML20138A234 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 03/06/1986 |
| From: | Johari Moore NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
| To: | Gallo J, Guild R GUILD, R., ISHAM, LINCOLN & BEALE |
| Shared Package | |
| ML20136F875 | List: |
| References | |
| CON-#186-374 OL, NUDOCS 8603140138 | |
| Download: ML20138A234 (1) | |
Text
f: F V$ N No.E 0$Yc..S....'. A%., _4, 57 OL a,,, g'o,
- g UNITED STATES NUCLEAR REGULATORY COMMISSION u
o a
WASHINGTON. D. C. 20555
\\... + + p[
DdM..ED CORRES,PO]NDg,Cg C
G Ql G
4 g
ra w q
m MAR 1019R6* I-March 6,1986 9'
bocan:a s 8IWict rnr oc'r E1:CENr. -
/N 4
O Joseph Gallo, Esq.
Robert Guild, Esq.
Isham, Lincoln & Beale 109 North Dearborn Street Suite 1100 Suite 1300 1150 Connecticut Avenue, N.W.
Chicago, IL 60602 Washington, DC 20036 l
l Gentlemen:
l Enclosed are copies of two documents which you requested during l
l the deposition of Messrs. Stein, Ford and Roe.
The first document is a memorandum from R.L.
Spessard, Director, Division of Engineering, Region Ill to D.G. Eisenhut, Director, Division of Licensing, NRR, dated August 8,
1983 along with its accompanying attachment.
The second l
document is NRC Inspection and Enforcement Manual Chapter 2920 entitled
" Construction Appraisal Team Inspection Program".
Sincerely,
\\N I
I Janice E. Moore l,
Counsel for NRC Staff
(
e r
Enclosure:
As Stated cc w/ encl.:
Service List l
B603140J'18 860306 PDR ADOCM 05000454 0
-- - - -