Suppls 840604 Response to Generic Ltr 84-11 Re Augmented Inservice Insp Plan.Min Sample of 33 Welds Will Be Required to Be Inspected During Outage
ML20138A223
Person / Time
Site: LaSalle 
Issue date: 10/02/1985
From: Massin H
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
0721K, 721K, GL-84-11, NUDOCS 8510080484
Download: ML20138A223 (2)


Text

.

)

Commonwealth Edison

@ One First National Plaza. Chicago. flhnois o

Address Reply to: Post Office Box 767 Chicago tilinois 60690 October 2, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 c

Subject:

LaSalle County Station Unit 1 Augmented Inservice Inspection Plan NRC Docket No. 50-373 References (a):

D. G. Eisenhut letter to All Licensees dated April 19, 1984 (Generic Letter 84-11).

(b):

B. Rybak letter to H. R. Denton dated June 4,1984 - Response to G.L. 84-11.

Dear Mr. Denton:

This letter supplements our response (Reference (0)) to Generic Letter 84-11 (Reference (a)).

LaSalle Unit 1 is scheduled for a Fall 1985 outage. Unit I has a total of 180 Class 1 stainless steel welds (Attachment), 43 of which were solution annealed. Using guidance from NUREG-1061 these 43 welds are classified as resistant to IGSCC, therefore the remaining 137 welds will fall uncjer the 84-11 criteria. The minimum sample for Generic Letter 84-11 is 33 welds and these welds will be required to be inspected this outage. The

" projected sample" are welds that are scheduled to be inspected during this outage.

If you have any further questions regarding this matter, please contact this office.

One signed original and ten (10) copies of this transmittal and its attachment are provided for your use.

Very truly yours, t

b H. L'. Massin Nuclear Licensing Administrator 8510080484 051002 PDR ADOCK 05000373 Attachments a

PDR cc: Region III Inspector - LSCS A. Bournia - NRR kOSq 0721K l

l ATTACHMENT LASALLE UNIT 1 FALL 1985 AUGMENTED ISI 1

2 3

4 5

6 7

SOLUTION ANNEALED 84-11 MINIMUMB PROJECTED SYSTEM SIZE TOTAL WELDS TOTAL SAMPLE SAMPLE RECIRCULATION l 24" l 46 l

6 l

40 l

8 l

40A 16" l 16 l

8 l

8 l

4 l

8 12" l 60 I

21 1

39 1

8 1

39A N

SDC l

20" l 11 l

0 l

11 1

4 l

11 12" I 17 1

2 1

15 1

4 l

15 RECIRCULATION,l l

l l

l l

REACTOR WATER 4"

30 l

6 l

24 l

5 l

18 CLEAN UP, l

l l

l l

JET PUMP H

l l

l l

l 180 l

43 l 137 l

33 l

131 NOTES:

A.

NOZ-SE WELDS WILL BE INCLUDED IN THE INSPECTION SAMPIE.

B.

THE MINIMUM SAMPLE IS THE COMMITMENT FOR 84-11.

_ COLUMN 3 - TOTAL VELDS ON A PARTICULAR SYSTEM OR SIZE.

4 - TOTAL WELDS THAT WERE SOLUTION ANNEALED. USING GUIDANCE FROM NUREG 1061, THESE WELDS WILL BE INSPECTED UNDER SEC. XI REQUIREMENTS.

5 - TOTAL WELDS FOR GENERIC LETTER 84-11 SAMPLE.

6 - MINIMUM 84-11 SAMPLE.

7 - TOTAL WELDS THAT ARE SCHEDULED TO BE INSPECTED THIS REFUEL OUTAGE IN CONJUNCTION WITH IHSI. THE NUMBER OF WELDS COULD BE REDUCED IF IHSI IS NOT PERFORMED ON ALL WELDS.

32115/15

.