ML20138A060

From kanterella
Jump to navigation Jump to search
Forwards List of NRC Prof Hours & Contractual Costs for Completed Review of CNSI-DW-11118-01-P, Chem-Nuclear Sys, Inc,Dewatering Control Process Containers Topical Rept
ML20138A060
Person / Time
Issue date: 12/05/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Poppe L
CHEM-NUCLEAR SYSTEMS, INC.
References
56720, NUDOCS 8512110529
Download: ML20138A060 (2)


Text

-

DISTRIBUTION w/ encl.:

" PDR Reg Records l HBernard, SSPB LSolander, PRAB DEC 5M RRa , A MRodriguez,RM/A LFMS SP Actual M/P LFMS Topical Chem-Nuclear Systems Inc.. CJHolloway ATTN: .Mr.- L. K. Poppe RMDiggs

- Corporate Health Physicist LFMS R/F 240 Stoneridge Drive - Suite 100 '

Columbia. South Carolina 29210 Gentlemen:

Consistent with the . requirements of 10 CFR 170.12(f) and 170.21.J. we have detemined the professional staff hours and contractual costs for the completed review (s)-of the topical report (s) listed on the enclosed sheet. . The Office of Resource Management has been notified to bill you -

for these completed reviews. When making payment, please make reference to the bill number. In those cases where your company has made payment-for some portion of the report review based on the Comnission's periodic billing method, these payments are shown as a credit on the enclosure.

Under the provisions of.10 CFR 170.21.J, fees are detemined based on SWper professional staff hour for review time expended between filing of the report and June 23,1984 (the ending period of the first full-week after the revised rule became effective on June 20,1984). From June 24, 1984 through completion of the review, the professional staff rate is $62 billed for $per hour.because 20,000 Where review that is the costmaximun exceedswhich $20,000, yoer can be company charged underis Part 170 for the review of a topical report or for each revision or amendment to an accepted topical report.

If you have other report reviews that have been completed or are under review, but are not on the enclosed sheet, they will be billed at a later date when cost data are available. Any questions relating to your bills should be directed to Mrs. Reba M. Diggs on 301/492-7225.

Sincerely, l Original signany Wm.O. h ,

85 William O. Miller, Director

$y 21$$ !Nhs1 I

'2/

PDR License Fee Management Staff Office of Administration b ju t.

~

L

Enclosure:

l l' List of Reports _

l l and Costs

'" ( f}[

d'

..LFM - . M .. .LFMS:ADM.. .r -

~~"*

..RMD . . .. CJ ay. .WOMil1er- .

==> 7 ~

7 12/f/85 12 _ 85.. 12/ D/85  : 7 .

- wac rom m oo-soi nnew one OFFICI AL RECORD COPY

c-JNCLOSURE 1

_ LIST OF TOPICAL REPORTS AND REVIEW COSTS Company name and address: Chem-Nuclear Systems, Inc.

ATTN: Mr. L. K. Poppe -

Corporate Health Physicist 240 Stoneridge Drive - Suite 100 Columbia, South Carolina 29210 NRC Report No. and Title Control No. Review Status Review Costs CNSI-DW-llll8-01-P "CNSI Dewatering 56720 Completed $5,208 Controi Process Containers Topical 6/11/85 Report" (12/23/83). (84 hrs. x 562)

TOTAL AMOUNT DUE: 55,208