ML20138A051
| ML20138A051 | |
| Person / Time | |
|---|---|
| Issue date: | 12/05/1985 |
| From: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Chandler J SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER |
| References | |
| 56619, NUDOCS 8512110524 | |
| Download: ML20138A051 (2) | |
Text
.
A PDR Reg Records am HBernard, SSPB LSolander, PRAB
-CHarwood, PRAB DECL 51985 RRakowski, RM/A MRodriguez,RM/A LFMS SP Actual M/P LFMS Topical CJHolloway Exxon Nuclear Company, Inc.
RMDiggs-
~ ATTN: Mr. 'J. C. Chandler, Lead Engineer LFMS R/F Reload Licensing Liaison 2101 Horn Rapids Road P.O. Box 130
.R1chland, Washington 99352 Gentlemen:
Consistent with the requirements of 10 CFR.170.12(f) and 170.21.J. we i
have determined the professional staff hours and contractual costs for
-the completed review (s) of the topical report (s) listed on the enclosed
. sheet. The Office of Resource Management has been notified to bill your Company for these completed reviews. When making payment, please make l
reference to the bill number.. In those cases where your Company has I
made payment for some portion of the report review based on the Commission's l
. periodic billing method, these payments are shown as a credit on the enclosure.
Under the provisions of 10 CFR 170.21.J. fees are determined based on L
$39 per professional staff hour for review time expended between filing of the report and June 23,1984 (the ending period of the.first full l
week after the revised rule became effective on June 20,1984).
From June 24, 1984 through completion of the review, the professional ::taff rate is $62 per hour. Where review cost exceeds $20,000, your Company i
is billed for $20,000 because that is the maximum which can be charged i
under Part 170 for the review of a topical report or for each revision or amendment to an accepted topical report..
If you have other report reviews that have been completed or are under review, but are not on the enclosed sheet, they will be billed at a later date when cost data are available. Any questions relating. to your bills should be directed to Mrs. Reba M. Diggs on 301/492-7225.
Sincerely, L
Ortdan1 Signed by 8512110524 851205 Wm.O. 3Duer PDR TOPRP EMVE William 0. Miller Director
() 7/ -
C
, D, },
License Fee Management Staff Office of Administration
/
0l
Enclosure:
1-List of Reports and Costs L
,,, LFM M
. LFMS.: ADM..
..RMyiggs:(p.
CJHo ay.
" " " ~ *
- W
.. OM. iller...
' 85, 11/3/85 a=>
12/ 2-/85 l)./
/
ome ronu na no somacu eno OFFICI AL RECORD COPY
~
~
ENCLOSURE 1 LIST OF TOPICAL REPORT REVISIONS AND REVIEW COSTS Company:name and address:
Exxon Nuclear Company, Inc.
ATTN: Mr. J. C. Chandler, Lead Engineer Reload Licensing Liaison 2101 Horn Rapids Road P.O. Box 130 Richland, Washington 99352 NRC Report No. and Title Control No. Review Status Review Costs Revision 2 to XN-NF-81 56619 Withdrawn
$2,795*
" Generic Mechanical Design for 2/22/85 Exxon Nuclear det Pump BWR Reload Fuel (submitted 8/2/64)
- 47.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> x $62 = $2,945 less $150 appl. fee paid 8/22/84 by Check No. 54776.
6 TOTAL AMOUNT DUE:
$2,795
_