ML20138A051

From kanterella
Jump to navigation Jump to search
Forwards List of NRC Prof Hours & Contractual Costs for Completed Review of Rev 2 to XN-NF-81-21, Generic Mechanical Design for Exxon Nuclear Jet Pump BWR Reload Fuel
ML20138A051
Person / Time
Issue date: 12/05/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Chandler J
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
56619, NUDOCS 8512110524
Download: ML20138A051 (2)


Text

. . _ _ . . _ _

A PDR am Reg Records HBernard, SSPB LSolander, PRAB

-CHarwood, PRAB RRakowski, RM/A DECL 51985 MRodriguez,RM/A LFMS SP Actual M/P

, LFMS Topical CJHolloway Exxon Nuclear Company, Inc. RMDiggs-

~ ATTN: Mr. 'J. C. Chandler, Lead Engineer LFMS R/F Reload Licensing Liaison  !

2101 Horn Rapids Road .

P.O. Box 130

.R1chland, Washington 99352 Gentlemen:

Consistent with the requirements of 10 CFR.170.12(f) and 170.21.J. we i have determined the professional staff hours and contractual costs for

-the completed review (s) of the topical report (s) listed on the enclosed

. sheet. The Office of Resource Management has been notified to bill your Company for these completed reviews. When making payment, please make ,

l reference to the bill number. . In those cases where your Company has I made payment for some portion of the report review based on the Commission's l

. periodic billing method, these payments are shown as a credit on the enclosure.

Under the provisions of 10 CFR 170.21.J. fees are determined based on L $39 per professional staff hour for review time expended between filing of the report and June 23,1984 (the ending period of the.first full l week after the revised rule became effective on June 20,1984). From June 24, 1984 through completion of the review, the professional ::taff rate is $62 per hour. Where review cost exceeds $20,000, your Company i

is billed for $20,000 because that is the maximum which can be charged i under Part 170 for the review of a topical report or for each revision l or amendment to an accepted topical report..  !

If you have other report reviews that have been completed or are under l review, but are not on the enclosed sheet, they will be billed at a later date when cost data are available. Any questions relating. to your l bills should be directed to Mrs. Reba M. Diggs on 301/492-7225.

Sincerely, L

, Ortdan1 Signed by Wm.O. 3Duer 8512110524 851205 TOPRP EMVE PDR C

William 0. Miller Director License Fee Management Staff

() 7/ -

, D , },

Office of Administration /

1-

Enclosure:

. 0l List of Reports and Costs , ,

'"'"> L ,,, LFM M . LFMS.: ADM.. .

" " " ~ * * ..RMyiggs:(p. CJHo ay. ..WOM. iller... ,

a=> 12/ 2-/85 , l)./ ' /85, 11/3/85 ome ronu na no somacu eno OFFICI AL RECORD COPY

- . ~

~ ' -

  • ENCLOSURE 1 LIST OF TOPICAL REPORT REVISIONS AND REVIEW COSTS Company:name and address: Exxon Nuclear Company, Inc.

ATTN: Mr. J. C. Chandler, Lead Engineer Reload Licensing Liaison 2101 Horn Rapids Road P.O. Box 130 Richland, Washington 99352 NRC Report No. and Title Control No. Review Status Review Costs Revision 2 to XN-NF-81 56619 Withdrawn $2,795*

" Generic Mechanical Design for 2/22/85 Exxon Nuclear det Pump BWR Reload Fuel (submitted 8/2/64)

  • 47.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> x $62 = $2,945 less $150 appl. fee paid 8/22/84 by Check No. 54776.

6 TOTAL AMOUNT DUE: $2,795

_