r V. ER.MONT YANKEE NUCLEAR POWER CORPORATION FVY 85-89 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301
,,,L, 70 ENGINEERING OFFICE y
1671 WORCESTER ROAD FRAMINGHAM, MASS ACHUSETTS 01701 TELEPHONE 6 0-8MM September 26, 1985 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcement Region I 631 Park Avenue King of Prussia, PA 19406 Attention:
Mr. Thomas T. Martin, Director Division of Radiation Safety and Safeguards
References:
a)
License No. DPR-28 (Docket No. 50-271) b)
Letter, USNRC to VYNPC, IEE Inspection No. 50-271/84-11, dated 9/17/84 c)
Letter, VYNPC to USNRC, FVY 84-114, dated 9/24/84 d)
Letter, USNRC to VYNPC, NVY 84-254, dated 12/11/84 e)
Letter, VYNPC to USNRC, FVY 85-1, dated 1/9/85 f)
Letter, VYNPC to USNRC, FVY 85-08, dated 1/25/85 g)
Letter, USNRC to VYNPC, NVY 85-140, dated 7/16/85 h)
Letter, USNRC to VYNPC, NVY 85-195, dated 9/11/85 e
Dear Sir:
Subject:
Response Requested Under 10CFR50.54(f) Concerning Installation of Vermont Yankee Containment High Range Radiation Monitors As part of an inspection of Vermont Yankee's implementation of task actions identified in NUREG 0737 (Reference b)], you found that "the licensee's installation of high radiation monitoring channels in the drywell is insuf-ficient in that the detectors are not widely separated...."
This resulted in the exchange of correspondence of References c) through f) and resulted in your direction to respond to the original Notice of Violation in accordance with the requirements of 10CFR50.54(f) (Reference g)]. We requested, and you arranged, the opportunity for our respective technical experts to meet regarding their differing viewpoints. As a result, this letter, which constitutes Vermont Yankee's response to the above described request, was deferred until this time as acknowledged in Reference h).
During the course of our September 4, 1985 meeting at the Region I offices, our respective interpretations of the "widely separated" criterion provided in NUREG 0737 were discussed. Vermont Yankee now understands the basis for your determination that our high radiation monitor installation deviates from the NUREG 0737 Item II.F.1-3 criterion. However, as pointed out in our presentation to you, we believe that the existing high radiation monitor locations, when viewed in the context of the NUREG 0737 Item II.F.1-3 requirements more fully meet the requirements than would be the case in alternative, more widely separated locations.
8510080390 850926 O
PDR ADOCK 05000271 o
G PDR g
r VEllMONT YANKEE NUCLEAft POWElt COltI*OllATION
.c 8 U.'S. Nuclear Regulatory Commission September 26, 1985 Page 2 Accordingly, to permit closeout of this issue, Vermont Yankee will submit, to NRR, a request for technical deviation from the criterion of NUREG 0737, Table II.F.1-3 which states:
" REDUNDANT - A minimum of two physically separated monitors (i.e., monitoring widely separated areas in the containment)." This submittal will provide details of our installation, and will substantiate the bases upon which Vermont Yankee believes the existing high radiation monitor installation is acceptable. The document will be mailed to NRR no later than November 30, 1985.
Vermont Yankee believes that this violation, being cited to NUREG criteria based upon a Confirmatory Order, is unique to TMI Action Plan items. We are reviewing both the unresolved item list and our NUREG 0737 closecut status to verify no similar items exist.
If any items requiring discussion and resolution are identified, we will pursue closeout with NRR.
We trust this information satisfactorily responds to your request; however, should you require further information concerning this matter, please contact us.
Very truly yours, l
l VERMONT YANKEE NUCLEAR POWER CORPORATION f
Warren P. Murphy v Vice President and l
Manager of Operations
/dm STATE OF VERMONT)
)ss WINDHAM COUNTY )
l Then personally appeared before me, Warren P. Murphy, who, being duly sworn, did state that he is Vice President and Manager of Operations of Vermont Yankee Nuclear Power Sorporation, that he is duly authorized to execute and file
,focqgoing document in the name and on the behalf of Vermont Yankee Nuclear F
ration and that the statements therein are true to the best of his knowledg a belief.