%j

\\

UNITED STATES y

' LNUCLEAR REGULATORY COMMISSION

'i

' "g'

~,

WASHINGTON, D.C. sesse eept

. April 22, 1997

,, g l

l Mr. l Charles M. Dugger Vice President Operations.

Entergy Operations, Inc.

i P. 0. Box B:

i Killona,!LA 70066 l

~

SUBJECT:

- COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 92-08, "THERMO-LAG ~

330-1 FIRE BARRIERS," DATED DECEMBER 17, 1992, FOR WATERFORD STEAM ELECTRIC' STATION, UNIT 3 (TAC NO. M85621) 1

Dear Mr.:

Dugger:L

Byiletters dated April-16, 1993; February ll, May 18, and December 21, 1994;-

l and March 29, August 4, and November 9, 1995, Entergy Operations, Inc.

1 responded to Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers,"

)

dated December 17, 1992, and follow-up requests' for additional information dated December,21, 1993; and September 23 and December 29, 1994 in regard to-l Thermo-Lag 330-1 fire barriers installed at Waterford Steam Electric Station, Unit 3 (Waterford 3).

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your letters.

Your responses stated that Waterford 3 has only seven applications of Thermo-Lag in the plant. None of the seven applications are protecting' electrical components or raceways.

By letter. dated November 9, 1995, you stated that

~

testing conducted'at an independent test laboratory concluded that the Thermo-Lag samples were consistent with other Thermo-Lag samples in terms of chemical

. composition and-that your own engineering evaluation concluded that the installed configuration was acceptable. Based on the results.of your updated engineering evaluation, you determined that the seven Thermo-Lag fire damper duct applications were to be dispositioned'as " accept-as-is" with no necessary modifications. Sections of the Thermo-Lag installations that were disturbed

~to obtain samples for destructive testing will be repaired.

In addition, you stated that Waterford 3 would discontinue the imposed compensatory actions j

. since' the actions were no longer necessary. On the basis of its review, the staff has determined that you have provided the information requested in GL 92-08 and the actions taken to disposition the Thermo-Lag applications at Waterford 3.are acceptable. Therefore, the actions tracked by TAC No. M85621 c

are complete.

(You should retain all documentation related to the resolution of the concerns Lwith Thermo-Lag 330-1. fire barrier systems for future NRC audits or

inspections.

j i

pai Woolic NRCIEE CENTER COPY 97042401 % 970422 L '-y PDR ADOCK 05000 m W@

F PDR g

l

. ~

..u

. n

@y(

i f

(3 l

4 o

b._f t

\\

,.j 3

l 3'

' Mr. Charles' N. Dugger L";,

A -2 ':

~

4 7 _,g_

s

, ~

' ' * *~ "3 i,

. as

's s

'i j,

,4

'If you have ani questions ~.regarding' this matter, please-contact Chandu Patel

'i at 301-415-3025.f y

,a '

j e.g-Si.ncerely,. "*

x i n.

_ ^l L

i y

1

'ORIdINAL6SIGNEDBY

g

.J

~

i i"

,,.*Chandu P.'Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV

~

Office lof Nuclear Reactor Regulation Docket No. 50-382 cc: See next page DISTRIBUTION:

Docket File:

PUBLIC PD4-1 r/f J. Roe E. Adensam-(EGAl)

W. Beckner

.C.

Hawes C. Patel-L'.-Tran M"#

D. Oudinot et*

m OGC-l(D Y

ACRS-I A. Howell,'RIV

./,

Document'Name:

WAT85621.LTR W,

OFC-PM/PD4-1 LA/PD4-1 BC/SPLB BC/EELB, w PM/PD4-1 NAME

'JKennedy/vw '

CHawes C/Md TMarsh0 JCalvo # "

CPatel @

DATE'

'4l / 1 /97 1//'7/97 4/I/97 f /2//97 Ll /?2/97 COPY.

$ES)NO YES/NO YES/NO YESh

' IES)N0 0FFICIAL" RECORD COPY dioOg 4

i p

s a

,/~p o

,I t D ~% N

't -

, R. y.

fr F,^

+,, j$ % ple%l,

' A,,

?-

,"* \\ ja.

f;* * ' ^' ', ' #

j

,W" i( *%;

i; t.

,-h;

  • q k iL, ;
  • yy llt w

i -

.X

,... f :; a

.r, t ).

' ; r,,

  • e s

7,4; s

$(

J.

g_p p

.-y.

7

[;

.;u'.

a,43-.

-1 t :

+Lv k

Mr. Charles M. Dugger i If you have any questions regarding this matter, please contact Chandu Patel at 301-415-3025.

Sincerely, f

Chandu P.. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation l

Docket No. 50-382 cc:.See next page

s 11 Mr. Charles M. Dugger Entergy Operations, Inc.

Waterford 3 cc:

Administrator Regional Administrator, Region IV Louisiana Radiation-Protection Division U.S. Nuclear Regulatory Commission Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884-2135 Arlington, TX 76011 Vice President, Operations Resident inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc.

Killona, LA 70066 P. O. Box 31995 Jackson, MS' 39286 Parish President Council St. Charles Parish Director P. O. Box 302 Nuclear Safety & Regulatory Affairs-Hahnville,'LA 70057 Entergy Operations, Inc.

P. O. Box B Executive Vice-President Killona, LA :70066 and Chief Operating Officer Entergy Operations, Inc.

Wise, Carter, Child & Caraway P. O. Box 31995 P. O. Box 651 Jackson, MS 39286-1995 Jackson,.MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Commission Entergy Operations, Inc.

One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697 Killona, LA 70066 i

Licensing Manager Entergy Operations, Inc.

P. O. Box B Killona, LA 70066 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 6

4 e

d t'

~-

-