Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Plant & That Actions Taken to Disposition Thermo-Lag Application,Acceptable
ML20137Z405
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/22/1997
From: Chandu Patel
NRC (Affiliation Not Assigned)
To: Dugger C
ENTERGY OPERATIONS, INC.
References
GL-92-08, GL-92-8, TAC-M85621, NUDOCS 9704240146
Download: ML20137Z405 (4)


Text

'

%j y \" UNITED STATES

'i

.- ' LNUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. sesse eept

' "g'

~,

,, g . April 22, 1997 l

l Mr. l Charles M. Dugger Vice President Operations.

Entergy Operations, Inc. i P. 0. Box B: ~

i Killona,!LA 70066 l

SUBJECT:

- COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 92-08, "THERMO-LAG ~

330-1 FIRE BARRIERS," DATED DECEMBER 17, 1992, FOR WATERFORD STEAM  ;

ELECTRIC' STATION, UNIT 3 (TAC NO. M85621) 1

Dear Mr.:

Dugger:L

Byiletters dated April- 16, 1993; February ll, May 18, and December 21, 1994;- l and March 29, August 4, and November 9, 1995, Entergy Operations, Inc. 1 responded to Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers," )

dated December 17, 1992, and follow-up requests' for additional information 1 dated December,21, 1993; and September 23 and December 29, 1994 in regard to- l Thermo-Lag 330-1 fire barriers installed at Waterford Steam Electric Station, Unit 3 (Waterford 3).

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your letters.

Your responses stated that Waterford 3 has only seven applications of Thermo-Lag in the plant. None of the seven applications are protecting' electrical By letter. dated November 9, 1995, you stated that

~

components or raceways.

testing conducted'at an independent test laboratory concluded that the Thermo-Lag samples were consistent with other Thermo-Lag samples in terms of chemical

. composition and-that your own engineering evaluation concluded that the installed configuration was acceptable. Based on the results.of your updated engineering evaluation, you determined that the seven Thermo-Lag fire damper duct applications were to be dispositioned'as " accept-as-is" with no necessary modifications. Sections of the Thermo-Lag installations that were disturbed

~to obtain samples for destructive testing will be repaired. In addition, you ,

stated that Waterford 3 would discontinue the imposed compensatory actions j

. since' the actions were no longer necessary. On the basis of its review, the  ;

staff has determined that you have provided the information requested in .

GL 92-08 and the actions taken to disposition the Thermo-Lag applications at c

Waterford 3.are acceptable. Therefore, the actions tracked by TAC No. M85621

. are complete.

(You should retain all documentation related to the resolution of the concerns Lwith Thermo-Lag 330-1. fire barrier systems for future NRC audits or

inspections.

j i

pai Woolic NRCIEE CENTER COPY 97042401 % 970422 L '-y PDR ADOCK 05000 m gW@

F PDR l

. .u

_ ._n ,

i

@y( .

f l

, (3 4 o b._f t ., \ 3 l 3'

.. ,.j

' Mr. Charles' N. Dugger - L"; ,

~ A -2 ':

. 4 7 _ ,g_

s .. , ~

' ' * *~ "3 i,

. as *

. 'i j, 's s

,4

'If you have ani questions ~.regarding' this matter, please-contact Chandu Patel at 301-415-3025.f y

,a ' > '

'i j -

e.g- ,:

x Si.ncerely,. "*

. . i n. .. . . . . . '

L , y i

  • 1

_ ^l

'ORIdINAL6SIGNEDBY

> , .,. . , g i .J i" ,,.

~

  • Chandu P.'Patel, Project Manager Project Directorate IV-1

~ -

Division of Reactor Projects III/IV Office lof Nuclear Reactor Regulation Docket No. 50-382 cc: See next page '

DISTRIBUTION:

Docket File:

PUBLIC PD4-1 r/f J. Roe . .

E. Adensam-(EGAl)

. W. Beckner

.C. Hawes C. Patel-L'.-Tran M"#

D. Oudinot Y et* m OGC- l(D ACRS- I A. Howell,'RIV ./,

Document'Name: WAT85621.LTR W, OFC- PM/PD4-1 _, LA/PD4-1 BC/SPLB BC/EELB , w PM/PD4-1 _

NAME 'JKennedy/vw ' CHawes C/Md TMarsh0 JCalvo # " CPatel @

DATE' '4l / 1 /97 1//'7/97 4/I/97 f /2//97 Ll /?2/97 COPY. $ES)NO YES/NO YES/NO YESh '

' IES)N0 4 0FFICIAL" RECORD COPY

i dioOg p <

, s a

,/~p o ,

,I t D ~% N 't - , _

, R. y . fr F,^ ,' -

+ ,, j$ % ple%l,  ?-

' A ,,

,"* \ ja. f;* * ' ^' ', ' #

,-h; '.

,W" w i( *%;* q k iL , ;

i; t.

j "

  • yy llt
  • .X ' ' '

!-- 7,4; a,43-.

s

, . .. f :; a .r, i -

tt ).:

' ; r, ,

  • e g_p p .-y.

s

[; .;u' .

7 $( -1 J.

+Lv ,

"' k

Mr. Charles M. Dugger i

, If you have any questions regarding this matter, please contact Chandu Patel at 301-415-3025.

Sincerely, f

Chandu P.. Patel, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation l

Docket No. 50-382 cc: .See next page

s 11 ,

Mr. Charles M. Dugger Entergy Operations, Inc. Waterford 3 cc:

Administrator Regional Administrator, Region IV Louisiana Radiation-Protection Division U.S. Nuclear Regulatory Commission '

Post Office Box 82135 611 Ryan Plaza Drive, Suite 1000 Baton Rouge, LA 70884-2135 Arlington, TX 76011 Vice President, Operations Resident inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc. Killona, LA 70066  :

P. O. Box 31995 Jackson, MS' 39286 Parish President Council  ;

St. Charles Parish Director P. O. Box 302 Nuclear Safety & Regulatory Affairs- Hahnville,'LA 70057 Entergy Operations, Inc.

P. O. Box B Executive Vice-President Killona, LA :70066 and Chief Operating Officer Entergy Operations, Inc.

Wise, Carter, Child & Caraway P. O. Box 31995 P. O. Box 651 Jackson, MS 39286-1995 Jackson,.MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Commission Entergy Operations, Inc. One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697 Killona, LA 70066 i Licensing Manager Entergy Operations, Inc.

P. O. Box B

Killona, LA 70066 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 6

4 e

d t'

, ~- - -