ML20137Z117
| ML20137Z117 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 09/26/1985 |
| From: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| To: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CNSS854196, NUDOCS 8510080168 | |
| Download: ML20137Z117 (1) | |
Text
_ _ _ _,
f a
Nebraska Public Power District
" '" *khbk!!!kkh!skh$h^ "
CNSS854196 September 26, 1985 SAFEGUARDS INFORMATION Mr. Robert D. Martin h $ Q,? Q' ',f Regional Administrator
~~ ~
U.S. Nuclear Regulatory Commission i
Region IV OCT 41985
,1 611 Ryan Plaza Drive Suite 1000 h' ; o Arlington, Texas 76011
~
j i
Subject:
Cooper Nuclear Station Safeguards Plan;
/
Report of Change-Revision Number Thirteen b ol 3 8 0 8 I I
/
Dear Mr. Martin:
The Physical Security Plan (Volume I of the CNS Safeguards Plan) is being revised to incorporate a restructuring of the Security Organization.
This chart now correlates with previous revision to reflect the current relationship between NPPD and the contract guard force.
Accordingly, Nebraska Public Power District is submitting, in accordance with the provisions of 10CFR Part 50.54(p), a Report of Change to the Cooper Nuclear Station Safeguards Plan, Revision Twelve.
Upon incorporation of this change, the current Safeguards Plan becomes Revision Thirteen.
We believe, the enclosed change, annotated by a sidebar, does not decrease the safeguards effectiveness of the plan.
The material enclosed herewith contains Safeguards Information as defined by 10CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited.
Therefore, we request the material, with the exception of the cover letter, to be withheld from public disclosure.
M J.
. Pilant Technical Staff Manager Nuclear Power Group JMP:HTH:bs 8510000168 850926 PDR ADOCK 05000298 F