ML20137Y048

From kanterella
Jump to navigation Jump to search
Discusses Safety Evaluation of B&W Owners Group Repts Dealing W/Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Exemption from GDC 4 & Demonstration That Leakage Sys in Compliance W/Reg Guide 1.45 Needed
Date released: 05/31/2020 Download: ML20137Y048


Topical Rept Evaluation of Rev 1 to BAW-1847, Leak Before Break Evaluation of Margins Against Full Break for Rcs.... Rept Presents Acceptable Justification to Eliminate Dynamic Effects of Large Ruptures in Piping
ML20138M389
Person / Time
Site: 05000000
Issue date: 12/12/1985
From:
Office of Nuclear Reactor Regulation
To:
References
TASK-A-02, TASK-OR
Download: ML20138M389 (10)
Forwards Topical Rept Evaluation of B&W Owners Group Topical Repts Dealing W/Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Acceptable Basis Provided to Eliminate Effects of Large Ruptures in Main Loop Piping
ML20137Y069
Person / Time
Site: 05000000
Issue date: 12/12/1985
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: OAKES L C
BABCOCK & WILCOX OPERATING PLANTS OWNERS GROUP, WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
Download: ML20137Y069 (2)
Discusses Safety Evaluation of B&W Owners Group Repts Dealing W/Elimination of Postulated Pipe Breaks in PWR Primary Main Loops.Exemption from GDC 4 & Demonstration That Leakage Sys in Compliance W/Reg Guide 1.45 Needed
ML20137Y043
Person / Time
Site: 05000000
Issue date: 02/18/1986
From: Stolz J
Office of Nuclear Reactor Regulation
To: WILGUS W S
FLORIDA POWER CORP.
References
RTR-REGGD-01.045, RTR-REGGD-1.045
Download: ML20137Y043 (3)