ML20137X947
| ML20137X947 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 04/16/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| References | |
| GL-95-06, GL-95-6, NUDOCS 9704220260 | |
| Download: ML20137X947 (6) | |
Text
e.
(# 4%,
UNITED STATES j
1((gt.f NUCLEAR REGULATORY COMMISSION f
i R EGloN iv t fM [/f 611 RYAN PLAZA DRIVE, SUITE 400 h
W g
AR LINGToN, T ExAS 76011 8064 1
APR l 61997 Charles M. Dugger, Vice President Operations - Waterford 3 Entergy Operations, Inc.
P.O. Box B Killona, Louisiana 70066
SUBJECT:
OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP
Dear Mr. Dugger:
In recent weeks, after an internal audit, Region IV has recognized the need for enhanced expectations for the quality of initial licensing examinations developed under the pilot process of Generic Letter 95-06 or the " Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. These new expectations represent a significant increase in NRC expectations regarding initiallicensing examination quality than has been previously communicated by the Region to facility licenseu. In several recent meetings with Rep; ion IV f acility licensee representatives from operations and training crganizations, regional management has presented these clarified expectations with regard to facility 1
licensee-developed initiallicensing examinations.
Additionally, chief examiners have been communicating these expectations at the staff level to individual facility licensee personnel for facility licensees that have initial examinations scheduled to be administered over the next few months. The thrust of these expectations is that f acility licensees will be held to a higher level of quality at the individual test item level than has been previously required. In response to these communications, facility licensee representatives have requested that the NRC provide a forum in which facility licensee personnel involved in examination development can better understand how these expectations translate into actual test items.
On May 29 and 30,1997, Region IV will host a workshop in its Arlington, Texas, office on test item and examination development to meet agency expectations of facility licensee-developed initiallicensing examinations. The workshop will start at 8:30 a.m. on May 29 and conclude by 1 p.m. on May 30. A tentative workshop agenda is attached. Comments are welcome. This workshop will be open to the public.
\\
0.00013 h
9704220260 970416
?
g]){$l}lli,Ilhgl R ADOCK OSOO 2, b m
- g..,-
-~ 1 l
- Entergy Operations, Inc. r You are invited and encouraged to send representatives from your organization who are
' likely to be directly. involved in initial licensing examination development. Our facility can accommodate a large number of attendees. However, if you expect to send more than four attendees, please inform us so that we may ensure the room arrangement is appropriate. Please direct comments or questions to John Pellet, Chief, Operations Branch, Division of ' i Reactor Safety at (817)860-8159 or Stephen McCrory, Workshop Coordinator, Operations Branch at (817)860 8265, or via electronic mail to jlp@nrc. gov and sim@nrc. gov, respectively. Sincerely, d /2 0 dia// cc. hate Arthur T. Howell Ill, Director Division of Reactor Safety Docket No.: EO-382 License No.: NPF-38
Enclosure:
Tentative Workshop Agenda cc w/
Enclosure:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc. P.O. Box 31995 Jackson, Mississippi 39286-1995 i Vice President, Operations Support Entergy Operations, Inc. P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations .Waterford 3 SES Entergy Operations, Inc. P.O. Box B Killona,; Louisiana 70066
.~. E ~ 3-3; .Entergy. Operations l Inc. i .. Manager - Licensing Manager - Waterford 3 SES Entergy Operations, Inc. L P.O. Box B Killona, Louisiana. 70066 : 8 ' Chairman : ~ Louisiana Public Service Commission One American Place, Suite'1630 - Baton Rouge, Louisiana 70825-1697' -. Director, Nuclear Safety &. Regulatory. Affairs .Waterford 3 SES l ' Entergy Operations,.inc. P.O. Box B l . Killona,; Louisiana 70066 a William H. Spell,- Administrator'. ' Louisiana Radiation Protection Division ? LP.O. Box 82135 Baton Rouge, Louisiana 70884-2135 l i Pailsh President l St. Charles Parish P.O. Box 302 ' -Hahnville, Louisiana 70057 t Mr. William A. Cross ~ Bethesda Licensing Office 3 Metro Center Suite 610 ~ Bethesda, Maryland 20814 Winston & Strawn 1400 L Streeti N.W. ~ Washington, D.C.-. 20005-3502' A \\ p &s - 3 a w, n +,,e.
~ I i 4:- l Entergy Operations, Inc. -4. .c e 4 .i bec to DCD (IE42)- r .bec distrib.-.by AlV: 11 ' Regional Administrator I Resident inspector- '.DRP Director DRS-PSB i i: . Branch Chief (DRP/D) ~ MIS System 1. Project Engineer (DRP/D)-
- RIV File.
l Branch Chief (DRP/TSS) 1 .S. Richards (MS.10D22) 4. i . p-?, ,.q '. i 4 5 3 L i 1 -i 1 DOCUMENT NAME:. R:V WALT 416. lmb To melve copy at h- ._ indicate in box: ac" = Copy without enclosures "E" = Copy with enclosures "W = No copy RIV:RE:OB - C:OB-D:DRS SLMcCrory/Imb@' - JLPellet,J/>- ATHowell liiff i' 04//(,/97 - ' dP- 0446/97 ' T 04//6/97.- oW j OFFIC AL RECORD. COPY 1 l 7 ,.j r s
W, 6 3 ] Entergy Operations,-Inc. : 'l 1:;bec'to DCD-(IE42)?
- bec distrib. by RIV:.
Regional Administrator.- . Residerit inspector a DRP Director. DRS-PSB - -l Branch Chief.(DRP/D). . MIS System Project Engineer (DRP/D). ' RIV File Branch Chief (DRP/TSS) - S. Richards (MS 10D22) F 1 ? I i l j-i l l -i 1 DO' UMENT NAME: R:\\_ WALT 416, lmb C . To receive copy of document, Indicate in bom "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy : RIV:RE:OB - C:OB D:DRS SLMcCrory/Imb d)'- JLPellet f/> ATHowell tilf/ 04//(,/97. 4e' 044b/97 ' t~ 04/g/97. >{ W OFFICIAL RECORD COPY .a I.' 'c {.' r t i'--' _y
ENCLOSURE OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP AGENDA 1 DAY 1 - MAY 29,1997 1 Introduction (8:30-9 a.m.) Session 1 (9-10 a.m.) Generic Attributes of Good Test items ] Session 2 (10:15-11:30 a.m.) Written Examination Questions j Session 3 (12:30-2 p.m.) Open Reference Oral Questions (Job Performance Measure and Administrative) Session 4 (2-3 p.m.) Administrative Joo Performance Measures Session 5 (3:15 4:30) System Job Performance Measures and Job Performance Measure Sets Session 6 (4:30-5 p.m.) Questions and Answers DAY 2 - MAY 30,1997 Session 7 (8:30-9:30 a.m.) Scenarios and Scenario Sets Session 8 (9:30-10:15 a.m.) Breadth, Depth, Overlap, and Examination Outlines Session 9 (10:30-12 noon) Questions and Answers Closing Remarks t12-12:30 p.m.) 4 1 4}}