ML20137X900

From kanterella
Jump to navigation Jump to search
Forwards Rev 24 to Plant Emergency Plan Which Incorporates Changes Necessary Based Upon Recent Transfer of Operating License from Gpc to Snoc
ML20137X900
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/04/1997
From: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137X904 List:
References
LCV-0949, LCV-949, NUDOCS 9704220243
Download: ML20137X900 (5)


Text

C.K. McCoy Southern Nuclear Vce President Operating Company,Inc.

Vogtle Project 40 inverness Center Parkway R0. Box 1295 Birmingham, Alabama 35201

('")

Tel 205 992 7122 Fax 205 992.0403 SOUTHERN h COMPANY Energy to Serve YourWorld" 99, LCV-0949 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk washington, DC 20555 VOGTLE ELECTRIC GENERATING PLANT EMERGENCY PLAN REVISION 24 Ladies and Gentlemen:

In accordance with 10 CFR50.54(q) and 10 CFR 50.4(b)(5), Southern Nuclear

(~)

Operating Company hereby submits Revision 24 to the Vogtle Electric Generating

't)

Plant (VEGP) Units 1 and 2 Emergency Plan (the Plan).

Revision 24 incorporates changes that are necessary based upon the recent transfer of the operating license from Georgia Power Company to Southern Nuclear Operating Company. Enclosure 1 provides a description and justification of the individual changes. Enclosure 2 provides the insertion instmetions. The revised plan pages are in Enclosure 3. The changes made to the Plan do not decrease the effectiveness of the Plan.

In accordance with 10 CFR50.4, two copies of Revision 24 are being sent to the NRC Region 11 oflice, and one copy is being sent to the NRC Senior Resident at Vogtle Electric Generating Plant.

Please contact this office or Mr. L.E. Mayo, Emergency Preparedness Coordinator at (706) 826-3356, if you have any questions regarding this submittal.

Sincerely,

(

WW1' d,'7077 C.K. ucCoy

[ ')

CKM/ JAB /gmb C/

xc; (See next page) 9704220243 970404 PDR ADOCK 0500 4

g]I]g

)

~ _.,

U. S. Nuclear Regulatory Commission r

LCV-0949.

Page 2

Enclosures:

1. Description and Justification of Changes
2. InsertionInstructions.
3. Revised Plan Pages xc:

Southern Nuclear Ooeratina Comoany Mr. J. B. Beasley, Jr.

Mr. M. Sheibani Mr. L.E. Mayo NORMS 1

1 i~ 'q

. U.S. Nuclear Regulatory Commission y/

Mr. L.A. Reyes, Regional Administrator Mr. L L. Wheeler, Licensing Project Manager, NRR Mr. C. R. Ogle, Senior Resident Inspector, Vogtle

\\

\\

i l

O

i O

i i

~

S i

ENCLOSURE 1 4

J i

5 i

l Description and Justification of Changes i

10 l

l 1

4 4

l i

l f

lO a

s

DESCRIPTION AND JUSTIFICATION FOR REVISION 24 TO THE VEGP EMERGENCY PLAN O

1.

Global Incorporate Southern Nuclear Operating Company through out the Emergency Plan where applicable.

Justification:

Operating license change from Georgia Power Company to Southern Nuclear Operating Company. Reference LDCR TS S2-007.

Appendix 7 Corporate Emergency Plan 2.

Page 5 Section A.2., paragraph 3 - Delete reference to GPC.

Justification:

Licensed operator change as stated in number 1 change above.

OO O

Page1 of1 i

l

O 4

1 i

4 l

ENCLOSURE 2 1

1 i

1 i

Insertion Instructions e

d s

O t

i 1

)

i i

I

O

.