Informs That on 970529-30,Region IV Will Host Workshop in Arlington,Tx on Test Item & Exam Development to Meet Agency Expectations of Facility licensee-developed Initial Licensing Exams.Tentative Workshop Agenda Attached
ML20137X696
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/16/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gambhir S
OMAHA PUBLIC POWER DISTRICT
References
GL-95-06, GL-95-6, NUDOCS 9704220138
Download: ML20137X696 (6)


Text

g" b%

UNITEo ST ATES 4

NUCLEAR REGULATORY COMMISSION t

y o.

g-REGloN IV k

,0[

- 611 RYAN PLAZA oRIVE, SUITE 400 4:

. ARLINGTON, TEXAS 76011-8064 9 n,*

APR l 61997 S. K. Gambhlr, Division Manager Production Engineering Omaha Public Power District.

Fort Calhoun Station FC-2-4 Adm.

P.O. Box.399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399

SUBJECT:

OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP

Dear Mr. Gambhir:

In recent weeks, after an internal audit, Region IV has recognized the need for enhanced expectations for the quality of initiallicensing examinations developed under the pilot process'of Generic Letter 95-06 or the " Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. -These new expectations represent a significant increase in NRC expectations regarding initiallicensing examination quality than has been previously communicated by the Region to facility licensees. In several recent meetings with Region IV. facility licensee representatives from operations and training organizations, regional management has presented these clarified expectations with regard to facility licensee-developed initiallicensing examinations.

Additionally, chief examiners have been communicating these expectations at the staff level to individual facility licensee personnel for facility licensees that have initial examinations scheduled to be administered over the next few months. The thrust of these expectations is that facility licensees will be held to a higher level of quality at the individual test item level than has been previously required. In response to these communications, facility licensee representatives have requested that the NRC provide a forum in which facility licensee personnel involved in examination development can better understand how these expectations translate into actual test items.

On May 29 and 30,1997, Region IV will host a workshop in its Arlington, Texas, office on test item and examination development to meet agency expectations of facility licensee-developed initiallicensing examinations. The workshop will start at 8:30 a.m. on May 29 and conclude by 1 p.m. on May 30. A tentative workshop agenda is attached. Comments are welcome. This workshop will be open to the public.

w n o 0 02.3 1

I rr 9704220138 970416 ggggy PDR ADOCK 05000285 PDR y

Omaha Pub' lic Power District s You are invited and encouraged to send representatives from your organization who are likely to be directly involved in initial licensing examination development. Our facility can accommodate a large number ~of attendees. However, if you expect to send more than four attendees, please inform us so that we may ensure the room arrangement is appropriate.

Please direct comments or questions to John Pellet, Chief, Operations Branch, Division of Reactor Safety at (8171860-8159 or Stephen McCrory, Workshop Coordinator, Operations Branch at (817)860-8265, or via electronic mail to jlp@nrc. gov and sim@nrc. gov, respectively.

Sincerely,

/v Arthur T. Howell Ill, Director Division of Reactor Safety Docket No.: 50-285 License No.: DPR-40

Enclosure:

Tentative Workshop Agenda a

cc w/

Enclosure:

James W. Tills, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2 4 Adm.

P.O. Box 399 Hwy. 75 - North of Fort Calhoun Fort Calhoun, Nebraska 68023-0399 James W. Chase, Manager Fort Calhoun Station P.O. Box 399 Fort Calhoun, Nebraska 68023 i

Perry D. Robinson, Esq.

Winston & Strawn i

1400 L. Street, N.W.

Washington, D.C. 20005 3502 Chairman Washington County Board of Supervisors Blair, Nebraska 68008 4

=

A

~.

0;
  • -3'

' ^

-.g.

Omaha Public Power District,

p 4

I Cheryl Rogers, LLRW Program Manager

' Environmental Protection Se'ction -

U Nebraska Department of Health 301 Centennial Mall, Sout'h

, P.O. Box 95007 Lincoln, Nebraska 68509 5007 i

i q..

' j h

4 i

4

+

1 4

l 4

I a

c j

3 s

w e

m

9 Omaha Public Power District. -

bec to DCD (IE42) bec distrib, by RIV:

iRegional Admin strator

- DRS-PSB DRP Director -

MIS System Branch Chief (DRP/B)'

RIV File

. Project Engineer (DRP/B)

Branch Chief (DRP/TSS)

- Resident inspector

. S. Richards (MS 10D22) a i

s

)

DOCUMENT'NAME: R:\\_FC\\FCLT416. lmb To receive copy of document, Indicolo in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:RE:OB -

C:OB D:DRS SLMcCrory/imbg JLPellet W ATHowell lilg 0446/97 fu 04//4/97 cf ** 04//6/97.

f*

OFFIC AL RECORD col'Y

]

f.

s t'

...E

c;,

=

i,s pq:

(W.

LOmaha' Public Power District l

-,jj

bec to DCD
(IE42)J l

Tbec distrib' by RIV:

Regional Administrator.

DRS-PSB :

-l

, DRP D.irector '

MIS System 1 Branch Chief (DRP/B),.

RIV File 1

Project Engineer (DRo/B)

Branch Chief (DRP/TSS)

Resident inspector -

.S, Richards (MS 10D22) i i

3

.I 1,i l

1 I

i.

r 1

i 1

DOCUMENT NAME: R:\\ FC\\FCLT416. lmb' To receive copy of document, indicate in box: "C" = Copy wahout enclosures "E" = Copy with endosures "N" = No copy.

RIV:RE:OB C:OB -

D:DRS SLMcCrory/imbMf JLPellet @f ATHowell lii)/J j

04/is/97 -

fu 04//u97 rge 04//6/97 t #'"

j

~

OFFIC'AL RECORD. COPY

-)

.i O

s

.' y.l

_j

I ENCLOSURE OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP AGENDA l

DAY 1 - MAY 29,1997 j

Introduction (8:30-9 a.m.)

Session 1 (910 a.m.)

Generic Attributes of Good Test items Session 2 (10:15-11:30 a.m.)

Written Examination Questions Session 3 (12:30-2 p.m.)

Open Reference Ora' Questions (Job Performance Measure and Administrative)

Session 4 (2-3 p.m.)

Administrative Job Performance Measures

. Session 5 (3:15-4:30)

System Job Performance Measures and Job Performance Measure Sets Session 6 (4:30-5 p.m.)

Questions and Answers DAY 2 - MAY 30,1997 a

Session 7 (8:30 9:30 a.m.)

Scenarios and Scenario Sets Session 8 (9:30-10:15 a.m.)

Breadth, Depth, Overlap, and Examination Outlines Session 9 (10:30-12 noon)

Questions and Answers

]

Closing Remarks (12-12:30 p.m.)