ML20137X312
| ML20137X312 | |
| Person / Time | |
|---|---|
| Issue date: | 04/17/1997 |
| From: | Craig C NRC (Affiliation Not Assigned) |
| To: | Matthews D NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9704210231 | |
| Download: ML20137X312 (5) | |
Text
-
April 17, 1997 MEMORANDUM T0:
David B. Matth:ws, Chief i
Generic-Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Claudia M. Craig,- Senior Project Manager Original Signed By:
Generic Issues and Environmental Projects Branch Division of. Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH WESTINGHOUSE DATE AND TIME:
May 13, 1997 8:30 a.m. - 4:30 p.m.
4 LOCATION:
Nuclear Regulatory Commission One White Flint North.
11555 Rockville' Pike Rockville, Maryland 20852 Room 0-8 B 11 PURPOSE:
The purpose of the meeting is for. Westinghouse to provide an update of the development of the Ovation Distributed Control and Information System.
Industry representatives will also be present. An agenda is attached.
PARTICIPANTS:
EC.
WESTINGHOUSE J. Wermiel L. Erin J. Mauck.
B. Ghrist P. Loeser J. Hasenkopf j
J. Gallagher B. Sterdis C. Craig, et. al T. Bogard Meetings between NRC technical staff and applicants or licensees are 'open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the " Commission Policy Statement on Staff
. Meetings Open to the Public," 59 Federal Reaister 48344, 9/20/94.
- However, portions of this staff meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact Claudia Cr2ig (NRC) at (301) 415-1053.
Attachment:
Agenda cc w/att: See next page DOCUMENT NAME:
G:\\ CMC 1\\5 13 97.N0T DISTitfBUTION:
See attached page W
OFFICE PGEB
/\\g /n SC:PGEBi NAME CCraig: b RArchitzel DATE 4/l9/97 4/9/97:
pFO'b, J 0FFICJAL RECORD COPY
') T 8D' A/d 9704210231 970417 PDR TOPRP EMWEST f'
.~
9 o aro j 'c y p'
4 UNITED STATES i
g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205d50001 o
April 17, 1997 i
r MEMORANDUM T0:
David B. Matthews, Chief Generic Issues and Environmental I
Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation j
1 FROM:
Claudia M. Craig, Senior Project Manage QN %
- k.
o Generic Issues and Environmental Projects Branch
(
Division of Reactor-Program Management Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH WESTINGHOUSE DATE AND TIME:
May 13, 1997 8:30 a.m. - 4:00 p.m.
LOCATION:
Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 0-8 B 11 PURPOSE:
The purpose of the meeting is for Westinghouse to provide an update of the development of the Ovation Distributed Control and Information System.
Industry representatives will also be present. An agenda is attached.
PARTICIPANTS:
fiRI WESTINGHOUSE J. Wermiel L. Erin J. Mauck B. Ghrist P. Loeser J. Hasenkopf J. Gallagher B. Sterdis C. Craig, et. al T. Bogard Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to the " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reaister 48344, 9/20/94.
- However, portions of this staff meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact Claudia Craig (NRC) at (301) 415-1053.
Attachment:
Agenda cc w/att: See next page
, =. %
AGENDA
' MEETING WITH WESTINGHOUSE MAY 13, 1997 OVATION DISTRIBUTED CONTROL AND-INFORMATION SYSTEM Introduction (0 pen)
Purpose of Meeting (0 pen)
OVATION Controller and OVATION Safety Controller Philosophy (Closed)
Simplified Surveillance Test Approach (Closed)
OVATION Utility / Vendor Interface Issues (Closed) l Licensing Approach for OVATION (0 pen) a Schedule for Subr-Ltals (0 pen) l Schedule for N Staff Review (0 pen) a i
1 Meeting Summary (0 pen) l l
i l
I t
Attachment
l DISTRIBUTION: Meeting Notice with Westinghouse dated April 17, 1997 Hard Cooy PUBLIC Central Files PGEB R/F CCraig OWFN Receptionist OGC, 0-15 B 18 ACRS, T-2 E 26 EMail SCollins/FMiraglia (SJC1/FJM)
AThadani (ACT)
RZimmerman (RPZ) i TMartin (TTM)
DMatthews (DBM)
PMNS WDean (WMD)
SDroggitis (SCD)
Dross (DFR)
BSheron (BWS)
GHolahan (GMH)
Glainas (GCL)
BBoger (BAB2)
RArchitzel (REA)
JWermiel (JSW1)
JMauck (JLM2)
Ploeser (PJL)
PGallagher (JMG1)
JStewart (JSC1)
LCampbell RBrill RGallo l
i j
- _ -. -. ~.
\\
Westinghouse cc:
Nicholas. Liparulo, Manager Regulatory and Engineering Networks Westinghouse Electric Corporation Mail Stop ECE 4-15 P.O. Box 355 Pittsburgh, PA 15230-0355 Andrew Drake, Project Manager Westinghouse Owners Group s
Westinghouse Electric Corporation Mail Stop ECE 5-16 P.O. Box 355 Pittsburgh, PA 15230-0355 Mark Beaumont Westinghouse Electric Corporation One Montrose Metro 11921 Rockville Pike, Suite 450 Rockville, MD 20852 l
,