DCL-85-344, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency organization.W/851206 Release Memo
| ML20137X175 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 11/15/1985 |
| From: | Shiffer J PACIFIC GAS & ELECTRIC CO. |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20137X180 | List: |
| References | |
| DCL-85-344, NUDOCS 8512100429 | |
| Download: ML20137X175 (6) | |
Text
,
PACIFIC GAS AND E LE C T RIC C O M PAN,Y W2
[
77 BEALE STREET
- SAN FRANCISCO, CALIFORNI A 94106 * (415)781 4211 TWx 910-372 6587 I
- g;*;',"*"
November 15, 1985 NuCLEAa PO*ta GmteAflON i
PGandE Letter No.: DCL-85-344 Mr. John B. Martin, Regional Administrator U. S. Nuclear Regulatory Comission, Region V 1450 !! aria Lane, Suite 210 Walnut Creek, CA 94596-5368 l
Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedure Updates 4
Dear Mr. Martin:
In accordance with Section V, " Implementing Procedures," of 10 CFR 50, Appendix E, PGandE is submitting one copy of the updates to the detailed Implementing Procedures (Enclosure 3) for the Diablo Canyon Power P1 ant Units 1 and 2 Emergency Plan. These updates are listed in Enclosure 1.
Concurrently, two copies of each update are being submitted to the Document Control Desk.
Some of the updates contain privacy / proprietary information. This privacy /
proprietary information has been bracketed in accordance with NRC Generic Letter 81-27 and is identified in Enclosure 2.
Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelop 2.
Sincerely, J.
. Shiffer Enclosures cc:
R. T. Dodds R. Fish 62)
_ _ _- 9 cc w/o Enc 3:
L. J. Chandler G. W. Knighton B. Norton CPUC Diablo Distribution is available for review at:
d 851210o429 851115 NRA ACTS Files PDR ADOCK 05000275 45 Fremont Street F
PDR 23rd Floor, Room C-40 0603S/0038K/ERK/1345
PGandE Letter No.: DCL-85-344 L
f ENCLOSURE 1 Updates Included In This Submittal l
DIABLO CANYON EMERGENCY PLAN IMPLEMENTING PROCEDURES i
Yolume 3A Updated Table of Contents EP G-2S1, Revision 3 EP G-3, Revision 7 EP G-5, Revision 3 i
Volume 3B l
Updated Table of Contents EP EF-2, Revision 6 EP EF-5, Revision 8 EP RB-8, Revision 5 EP RB-15, Revision 2 EP RB-15:A, Revision 4 EP RB-15:B, Revision 3 EP RB-15:C, Revision 3 EP RB-15:D, Revision 3 EP RB-15:E, Revision 3 EP RB-15:F, Revision 2 EP RB-15:G, Revision 2 EP RB-15:H, Revision 2 EP RB-15:1, Revision 1 EP RB-15:J, Revision 0 EP RB-15:K, Revision 0 EP.9B-15:L, Revision 0 EP RB-15:M, Revision 0 0603S/0038K l
~
e PGandE Letter No.: DCL-85-344 1-
?)V ENCLOSURE 2 kO 4
location of Proprietary Information Procedure:
G-251, Revision 7 --
Page 1 of 2; Attichment, " Emergency Organization Call List," Pages 2,3,4,5,6,7, 8, 9, 10, 13, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, and 28 of 32 G-3, Revision 7 Page'4 of 6; Attachment, "Energency Offsite o
I Organization Call List," Sheets 1 and 2 of 2;, Page 1 of 1 EF-5, Revision 8 Pages 15,16, and 17 of 59; Pages 38 and 39 of 59; Page 59 of 59; Attachment, " Emergency Kit Inventory Checklist (Box B)," Page 1 of 4 Attachment, " Evacuation Kit Inventory c
Checklist," Page 2 of 2 9
Attachment, " Post LOCA Sampling Kit Inventory Checklist," Page 2 of 2 Attachment, " Technical Support Center Checklist," Pages 2 and 3 of 4; Attachment, " Emergency Operations Facility Equipment Function Checklist,"
Pages 1, 2. and 3 of 4; Attachment, " Media Center Phone Checklist, Pages'1, 2, and 3 of 3; Attachment, " Garage ' Layout and Phone 3
Access,", Page 1 of 1 RB-8, Revision 5 Page 3,of 37 RB-15:A, Revision 4 -- Page 3 of 23 u
0603S/0038K g
1 1.
= -. -
_=
~
u PGandE Letter No.: DCL-85-344 ENCLOSURE 3 j~
t Updates to Diablo Canyon Emergency Plan Implementing Procedures i
o 4
e f
(!
1
.1 e
A 4
0603S/0038K i
,-n.-
,,--w,.,,
-,.c-
,,, -...v,,,, -.., -,, - -.,..,., - -,, -
..-.-c.
.,-,,-n
....: w.s z..
8 4
UNITED STATES N
NUCLEAR REGULATORY COMMISSION h
WASHINGTON, D. C. 20555
%,..... p#
December 6, 1905 50-275/323 Diablo Canyon MEMORANDUM FOR: Cliief, Document Management Branch, TIDC
'FROM:
Director, Division of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document
~.and has determined that it may now be made publici available.
/
/
. M. Fel ton, Director ivision of Rules and Record g )
Office of Administration
Attachment:
As stated 6
,. ~, - -
c.
-- - - -