ML20137W798
| ML20137W798 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/11/1997 |
| From: | Shell R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9704210003 | |
| Download: ML20137W798 (4) | |
Text
'
j c
Tennessee Valley Authority, Post Office Box 2000, Soody-Daisy, Tennessee 37379-2000 April 11,1997 j
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
i in the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
E' 328 SEQUOYAH NUCLEAR PLANT (SON)- DEPARTURE FROM NUCLEATE BOILING RATIO (DNBR) TRANSITION CORE PENALTY COMMITMENT FOR TECHNICAL SPECIFICATION (TS) CHANGE 96-01 This letter documents a commitment to obtain NRC review and approval for reductions in the DNBR initial transition core penalty below the proprietary value for mixed Mark-BW cores er docketed in our response to NRC's Question 28 da:ed April 6,1997. This commitment will remain in effect until a homogen. ous core of Mark-BW fuelis achieved. This commitment was required by NRC to support approval of TS Change 96-01 as discussed in a telephone call with NRC on April 10,1997.
The enclosure provides the commitment made in this letter.
Please direct questions concerning this issue to Keith Weller at (423) 843-7527.
/
Sincerely,
/
t f
ph R. H. Shell Site Licensing and Industry Affairs Manager
/
Enclosure cc: See page 2
~
9704210003 970411 PDR ADOCK 05000327
.$$$5f,5&$y}ll]lll
1 i
U.5. Nuclear Regulatory Commission Page 2 April 11,1997 cc (Enclosure):
l Mr. R. W. Hernan, Project Manager
' Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident inspector Sequoyah Nuclear Plant 2600 Igeu Ferry Road Soddy-Daisy, Tennessee 37379-3624
)
Regional Administrator U.S. Nuclear Regulatory Commission Region ll l
101 Marietta Street, NW, Suite 2900 I
. Atlanta, Georgia 30323-2711 I
t i
l l
i l
i i
9 e
ENCLOSURE COMMITMENT LISTING l
l I
r*
le [ '_ e
,J d.
Commitment TVA will obtain NRC review and approval prior to the startup for any cycle's core that involves a reduction in the departure from nucleate boiling ratio initial transition core penalty below the proprietary value for mixed Mark-B'N cores as docketed in i
i our response to NRC's Question 28 dated April 6,1997. This commitment will be incorporated into an appropriate procedure by May 30,1997, and will remain in' effect until a homogeneous core of Mark-BW fuelis obtained for each unit.
4
[
1 1
3 1
1 t
1 4.
i 7,
i I
l j
)
>