Rev 0 to Allegation Investigation Repts 4-84-A-06/114,184b, 184f,184o & 184p Re Allegations A-226,A-306b,A-306f,A-306o & A-306p Concerning Traceability Requirements of Permanent Attachment Matl Welded to Class 1 & 2 Piping
ML20137V634
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/25/1984
From:
NRC
To:
References
RTR-NUREG-0787, RTR-NUREG-787 4-84-A-06-114, 4-84-A-6-114, A-226, A-306B, A-306F, A-306O, A-306P, NUDOCS 8510040086
Download: ML20137V634 (6)


Text

REVISION 0

~

06/25/84 SSER Task: Allegation A-226, A-306b, A-306f, A-306o, A-306p 4-84-A-0gjl14),f84 2,IBy[j t89o, /8 Yy Ref. No.:

Characterization: It is alleged that the traceability requirements of permanent attachment material welded to Class 1 and 2 piping pressure boundaries by Tompkins-Beckwith (T-B) were not satisfactorily resolved by EBASCO Engineering.

Assessment of Allegation:

In assessing this allegation, the NP,C staff reviewed LP&L's Preliminary Safety Analysis Report (PSAR) and the Final Safety Analysis Report (FSAR), as well as the appropriate sections of the EBASCO contract documents. The staff found that design of piping systems is based on LP&L's comitment to the Winter 1972 Addenda in Section III of the ASME Code. Since welded attachments are not pressure-retaining components, the only Code requirement is that the attachments must be made of materials pennitted by the applicable ASME Code section.

Code Class 1 welded attachments need be in conformance with material specifications in subsections NB-2121 and NB-4435 of the Code. Certified Material Test Reports (CMTRs) are required and are included in the piping documentation package.

Code Class 2 welded attachments need be in conformance with material specifications in Appendix I, Table I-7.0, of subsections NC-2190 and ND-2190 of the Code. CMTRs or Certificates of Compliance (C of C's) are required and are included in the piping documentation package.

The NRC staff determined that either CMTRs or C of C's for permanent attachment material are included in piping documentation packages. Accordingly, the NRC staff concludes that the material traceability requirements of welded attachments to Class 1 and 2 pressure boundaries have been properly resolved.

In addition, these weld attachments were inspected by an authorized nuclear inspector.

fDR E

l

. This Callegation'has neither safety significance nor generic implications.

P Potential Violations: None. L k

Actions-Required: None.

References EBASCO May 26, 1983 Interoffice Correspondence W3QAIRG-0502 May 12, 1983 Interoffice Correspondence W3QAIRG-0481 May 4, 1983 Interoffice Correspondence W3QAIRG-0467 June 27,~1983 Interoffice Correspondence W3QAIRG-0588 August 16, 1982 Interoffice Correspondence W3QASU-00022 April 19,1983 Handwritten Memo April 13, 1983 Interoffice Correspondence 82.1 January 5, 1984 Memorandum ES-8486-84 NCR No. TB-296(W3-5974) (March 2, 1983 - February 17,1984)

NCR No. W3-7494 (December 23, 1983 - January 11,1984)

Contract W3-NY-11 Supplemental Work Order No.180 (signed January 9,1984)

Tompkins-Beckwith TBP-49 (Rev. A, January 11,1984) Material Control Procedure LP&L W3 PSAR/FSAR Commitments / Classifications

. = _.

1 k

^

3 Statement Prepared By:

James D. Lenardson Date l

1 Reviewed By:

Team Leader Date i

Reviewed By:

Site Team Leader (s)

Date l

Approved By:

Task Management Date i

i I

i t

4 I

i 1

1 e

i r

4 i

i s

V 4

3 a

i i

4 Y

  • rg 9

e

=rs=q

'y r e% ww e e,v.--

o

,y-.rrg.m,r,,9 e. -,

.,y

,,,.,..,.,-,p..,,.-.y

,m,-w,,.-%w-.-,. -ym

,,,te w..,w.,

,,&w..-

-,.,,,,w-c-

+e m S c r.g-

,. -- :p, y, -w eg,

wg.m,,.,--

Document Name:

SSER X A-226 Requestor's ID:

CONNIE Author's Name:

Document Comments:

A-306b, A-306f, A-306o, A-306p 1

l 1

Document Name

[

SSER A-226 Requestor's ID:

CONNIE s '

Author's Name:

Document Comments:

tis $'

1oCp *+ d V

11 5

P

REVISION 0 06/25/84 SSER Task: Allegation A-226y 7844 y 784/ y 7osej Jo 4 p Ref. No.: 4-84-A-06 (114)

Characterization: It is alleged that the traceability requirements of j

permanent attachment material welded to Class 1 and 2 piping pressure boundaries by Tompkins-Beckwith (T-8) were not satisfactorily resolved by EBASCO Engineering.

Assessment of Allegation:

In assessing this allegation, the NRC staff reviewed LP&L's Preliminary Safety Analysis Report (PSAR) and the Final Safety Analysis Report (FSAR), as well as the appropriate sections of the EBASCO contract documents. The staff found that design of piping systems is based on LP&L's comitment to the Winter 1972 Addenda in Section III of the ASME Code. Since 1

i l

welded attachments are not pressure-retaining components, the only Code requirement is that the attachments must be made of materials permitted by the applicable ASME Code section.

Code Class I welded attachments need be in conformance with material specifications in subsections NB-2121 ard PS 4435 of the Code. Certified l

Material Test Reports (CMTRs) are required and are included in the piping documentation package.

Code Class 2 welded attachments need be in conformance with material specifications in Appendix I, Table I-7.0, of subsections NC-2190 and ND-2190 l

of the Code. CMTRs or Certificates of Compliance (C of C's) are required and are included in the piping documentation package.

The NRC staff determined that either CMTRs or C of C's for permanent attachment

{

material are included in piping documentation packages. Accordingly, the NRC staff concludes that the material traceability requirements of welded attachments to Class 1 and 2 pressure boundaries have been properly resolved.

In addition, these weld attachments were inspected by an authorized nuclear

-inspector.

-