Forwards RAI Re 961022 Application for Amend to TS Re pressure-temp Limits.Response Should Be Provided within 45 Days
ML20137V283
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/10/1997
From: Donohew J
NRC (Affiliation Not Assigned)
To: Hagan J
ENTERGY OPERATIONS, INC.
References
TAC-M97520, NUDOCS 9704170255
Download: ML20137V283 (4)


Text

. . . . - - - . - - . . . - - . - . . . . - . - . - --.- . - - . . _ , . - . . . . . . - . . . - . -

t 4

April 10, 1997 Mr. Joseph J. Hagan Vice President, Operations GGNS

-Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO PRESSURE-TEMPERATURE .

LIMITS IN THE TECHNICAL SPECIFICATIONS, GRAND GULF NUCLEAR STATION, l UNIT 1 (TAC NO. M97520)

Dear Mr.-Hagan:

The staff is continuing its review of your application dated October 22, 1996, for an amendment to the pressure-temperature limit curves in the

. Technical Specifications for Crand Gulf Nuclear Station, Unit 1. To permit us to continue our review on our current schedule, we require that the information requested in the enclosure be provided within 45 days of your

receipt of this letter.

t cerely k vc Jack N. Donohew, Senior Project Manager

+/\ o/A ~\

Project Directorate IV-1 ,

Division of Reactor Project: III/IV Office of Nuclear Reactor Reguistica-Docket No.40-416

Enclosure:

Request for Additional Information cc w/ encl: See next page

. DISTRIBUTION: '

Docket File PUBLIC PD4-1 r/f K. Wichman J. Roe E. Adensam (EGA1) J. Donohew J. Dyer, RIV ACRS (4) OGC (15818)

C. Hawes W. Beckner C.F. Sheng Document Name: GG97520.RAI  !

0FC PM/PO4-A LA/PD4-1 EMCB SC/fMdl/k NAME JDodN CHawesQlH) CFSheng(,$, KW N ii

{ DATE Y/th/97 3 /J/ /97 4 //D /97 h//d/97 COPY d(S)NO YES/N0 M/N0 /hES)NO

~

ES 0FFICIAL RECOR H 0PY l NRC FR.E 3 ENTER COPY 9704170255 970410 l PDR ADOCK 05000416 p PDR

', 000 p e-  % UNITED STATES j

,j

's NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 4 001 4 ,d 9***** April 10,1997 Mr. Joseph J. Hagan Vice President, Operations GGNS Entergy Operations, Inc.

P. O. Box 756 Port Gibson, MS 39150 i

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO PRESSURE-TEMPERATURE LIMITS IN THE TECHNICAL SPECIFICATIONS, GRAND GULF NUCLEAR STATION, UNIT 1 (TAC NO. M97520)

Dear Mr. Hagan:

The staff is continuing its review of your application dated October 22, 1996, for an amendment to the pressure-temperature limit curves in the Technical Specifications for Grand Gulf Nuclear Station, Unit 1. To permit us to continue our review on our current schedule, we require that the information requested in the enclosure be provided within 45 days of your receipt of this letter.

. Sincerely, j i

T 8

, D b' M Jack N. Donohew, Senior Project Manager I

Project Directorate IV-1 Division of Reactor Projects III/IV

, Office of Nuclear Reactor Regulation '

Docket No. 50-416

Enclosure:

Request for Additional Information cc w/ encl: See next page

e Mr. Joseph J. Hagan Entergy Operations, Inc. Grand Gulf Nuclear Station cc:

Executive Vice President General Manager, GGNS

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc. P. O. Box 756 P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 -

Attorney General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, MS 39205 P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn 1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Division of Solid Waste Management Mississippi Department of Natural Office of the Governor Resources State of Mississippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attorney General President, Asst. Attorney General Claiborne County Board of Supervisors State of Mississippi Port Gibson, MS 39150 P. O. Box 22947 Jackson, MS 39225 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Vice President, Operations Support 611 Ryan Plaza Drive, Suite 1000 Entergy Operations, Inc.

Arlington, TX 76011 P.O. Box 31995 Jackson, MS 39286-1995 Senior Resident Inspector U. S. Nuclear Regulatory Commission Director, Nuclear Safety Route 2, Box 399 and Regulatory Affairs Port Gibson, MS 39150 Entergy Operations, Inc.

P.O. Box 756 Manager of Operations Port Gibson, MS 39150 Bechtel Power Corporation P.O. Box 2166 Houston, TX 77252-2166

i

', i REQUEST FOR ADDITIONAL INFORMATION RELATED TO PRESSURE-TEMPERATURE LIMITS IN TECHNICAL SPECIFICATIONS ENTERGY OPERATIONS. INC.

l GRAND GULF NUCLEAR STATION. UNIT 1 DOCKET NO. 50-416 The following request for additional informations is concerned with the licensee's letters dated May 2, 1996, (GNR0-96/00035) and October 22, 1996, (GNRO-96/00120), for an amendment to the pressure-temperature limit curves in I the Technical Specifications (TSs) for Grand Gulf Nuclear Station, Unit 1. i

1. General question: Provide the methodology used to generate pressure-temperature (P-T) limits for the bottom head and the feedwater nozzle. l 1
2. Page 2 of 8:. The detailed information needed to calculate the reported adjusted reference temperature (ART) of 57.57 DEG F can be found in your letter of Mgy 2,1996, from which the internal-diameter (ID) fluence of 2.5E18 n/cm at 32 EFPY was reported. The May 2, 1996, letter indicated that this fluence value was from General Electric (GE) Report EAS-35-0387 (April 1987). The ID fluence value at 2 EFPY in the NRC reactor vessel l integrity database (RVID), is 3.11 n/cml, which was reported to be the i

)

latest data in your letter dated May 5,1994, in response to the NRC close-out letter regarding GL 92-01. The latter value is in line with all your recent submittals. Resolve this discrepancy. ,{

3. Page 3.4-31 to 3.4-35 of the Technical Specifications: Change of fluence j should not affect the P-T limit curves which are controlled by the  !

feedwater nozzle, as evidenced in the five figures of Figures 3.4.11-1. i Explain the discrepancy between the current curves that are controlled by the feedwater nozzle for 10 EfPYs and the proposed curves that are controlled by the feedwater nozzle for various EFPY intervals.

4. Page 3.4-31 to 3.4-32 of the Technical Specifications: Change of fluence should not affect the P-T limit curves for the bottom head; however, the i curves vary among the current Figure 3.4.11-1 and the first two figures  !

of the proposed Figure 3.4.11-1. Provide an explanation for this variation.

?

ENCLOSURE l