Text
.
hl
'Af DuquesneUght 2"5%!#,
,,,,co,,,jl's$:}E
~c.. co.wenon w.2n N"u'e"O*I*isI$s*"*""***
september 16, 1985 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION: Dr. Thomas E. Murley Ad:ninistrator
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Significant Deficiency Report No. 85-05, Final Report
" Insufficient Thickness of Insulating Tape on 5 kV Power Cable Termin ations" Gentlemen:
This report provides information as required by 10CFR50.55(e) with respect to t.he August 14, 1985, telephone report of a potential significant deficiency. DLC anticipates no further reports with respect to this issue.
DUQUESNE LIGHT COMPANY By JJ(farey Vice 7 resident RW/wjs Attachment cc:
Mr. J. M. Taylor, Director (3) (w/a)
Mr. B. K. Singh, Project Manager (w/a)
Mr. G. Walton, NRC Resident Inspector (w/a)
INP0 Records Center (w/a)
NRC Document Control Desk (w/a)
SUBSCRIBED AND SWORN TO B ORE ME THIS g DAY OF
,1985.
M d.,
__-Notary Public ANITA ELAINE REITER, NOTARY PUBLIC ROBINSON TOWN 3 HIP, AltEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 70,1986 8510030417 850916 DR ADOCK 0 y2 3
Y
,en
UaitaJ States Nuclear Regulatory Conunission Dr. Thomas E. Murley Significant Deficiency Report No. 85-05, Final lteport Page 2 COMMON 4EALTil UF PENNSYLVANIA )
)
SS:
COUNTY OF ALLEGHENY
)
/gMI,dayof
/9[{,beforeme,a On this n,
s flotary Public in and for said Conmonwealth and County, personally appeared J.
J.
Carey, who being duly sworn, deposed and said that (1) he is Vice President af Daquesne Light, (2) he is duly authorized to execute and file the foreping Subaittal on behalf of said Company, and (3) tne statements set forth in the Submittal are true and correct to the bast of his knowledge.
_f M4 L
Notary Public ANITA ELAINE REITER, NOTARY PUGUC ROBINSON TOWNSHIP, ALLEGHENY COUNTY MY COMMISSION EXPIRES OCTOBER 20,1986 3
1 i
BEAVER VALLEY POWER STATION - UNIT 2 DUQUESNE LIG11T COMPANY j
Significant Deficiency Report 85-05
" Insufficient Tnickness of Insulating Tape on 5 kV Power Cable Terminations t
i 1.
SUMMARY
Review of $4EC drawing 12241-RE-28A-4, details E-1, F,
and G which I
specify the methad and materials for 5 kV power cable tenninations to motors and other miscellaneous equipment with pigtails, indicated that the specified nunber of layers of insulation tape did not agree with the i
4 manufacturer's (Kerite Company) specified requirements.
l-2.
IMMEDIATE ACTION TAKEN On July 18, 1985, E&DCR 2P-4757 was issued to modify all suspect 5 kV terminations made under details G, E-1, and F on drawing 12241-RE28A-4.
f i
Mr. R.
J.
Wallauer, Duquesne Light Company (DLC), Regulatory Affairs i
Department, notified Mr. G. Walton, NRC Region I office, by telephone on 1
August 14, 1985, that DLC considerei this matter to be potentially reportable under 10CFR50.55(e).
3.
DESCRIPTION OF THE DEFICIENCY i
j An incorrect nunber of layers of insulating tape was specified on SWEC drawing 12241-RE23A-4 for 5 kV tenninations under Details E-1, F, and G.
Forty-six (46) tenninations had been made due to the erroneous drawing specifications, i
j 4.
ANALYSIS OF SAFETY IMPLICATION The deficient taping procedures were used at the electrical connection to various safety-related 4.16 kV motors.
The total thickness of insulating tape specified on drawing 12241-RE-23A-4 waald be approximately 120 mil j
as compared to 500 mil specifteti by the manufacturer (Kerite Company).
[
Most of the deficient tenninations were located -in, or were scheduled to i
be located in a harsh environment. The significant reluction in insulat-ing tape thickness below the manufacturer's requireaents is considered to l
be sufficient basis for assuming the tennination could f ail prenaturely.
1 Failure of the tennination could result in loss of operation of a con-j nected 4.15 kV safety-related motor.
l 5.
CORRECTIVE ACTION TO REMEDY DEFICIENCY I
The fif teen (15) 5 kV cable tenninations turned over to the Start-up Group (SVG) have. been reorked in accordance 'with E&DCR 2P-4757 to l
achieve the proper nu:noer of layers of insulating tape, thus bringing the L
terminations in agreement with the manufacturer's requirenents.
The remaining 31 tenninations will be reworked prior to turnover to SVG.
i 1
- - - -.. ~,
..,._e-
. ~, - _. -,-
.-.m-,m_
7p,
.,,,,%,--.9 c-- -,., m, ww,, g w-we c w y. e-m, ww ey g m pm,we.-,..ef
r.
Drawing 12241-RE-28A-4 nas been revise.1 such that detalls E-1, F, and G reflect tne manuf acturer's 5 kV tennination i eilistranents.
In addition, all other details on suspect tennination drawinjs have been reviewed for consistency with manufacturer's requirements.
6.
ADDITIONAL REPORTS This is the final report regarding the insuf ficient thickness of insu-lating tape on 5 kV power cable terminations.
s
.